CASE STUDY

CHADSTONE SHOPPING CENTRE


STAGE 38

PROJECT SCOPE CLIENT


STAGE 38 OF CHADSTONE SHOPPING CENTRE’S $500M Probuild
REDEVELOPMENT INVOLVES THE ADDITION OF A TEN LEVEL
OFFICE TOWER, A NEW BUS INTERCHANGE AND DURATION
AN ADDITIONAL CAR PARK DECK.
To tie into the existing Chadstone A large portion of the bus
2 years
structure, a multitude of cut and interchange is located on a
core holes were required to be suspended slab above the PROJECT VALUE
made in the car park slab. shopping centre’s functioning
car park. A significant amount
$500M
Land Surveys utilised a high
of strengthening steel work was
frequency Ground Penetrating
Radar (GPR) to carry out surveys
required to be fitted beneath in LOCATION
order to transfer the load from the
of each cut or core location prior
structure above, and this required Chadstone,
to the commencement of cutting
works.
precise survey work combined with Melbourne, Victoria
accurate GPR results to allow the
Successful location of in-situ post- steel work to be fitted through the
pension cables and conduit were existing slab.
combined with feature surveys
to allow the safe and correct
positioning of slab penetrations.