You are on page 1of 11

Percival Bello Castueras

yuancastueras@yahoo.com
+639276410230

Present Address:
26 Bagong Nayon , Galas, Quezon City, Manila 1008, Metro
Manila, Philippines

Permanent Address:
purok 3, Lungayan Street, Oscariz, Ramon 3319, Isabela,
Philippines

Basic Information
Age Birth Date Gender Civil Status
41 Mar 05, 1982 Male Married

Height (cm) Weight (kg) Nationality Religion


160 60 Filipino METHODIST

Work Experience
I have been working for 14.99 years
Mar 2020 - Dec 2022 SURVEYOR (SOLOMON ISLAND)
(2 Years, 10 Months) KITANO CONSTRUCTION CORPORATION
Construction / Building / Engineering
AIR PORT PROJECT

PROJECT SCOPE:
CONSTRUCTION OF THE NEW INTERNATIONAL
DEPARTURE BUILDING
RENOVATION OF THE EXISTING INTERNATIONAL
TERMINAL BUILDING
CONSTRUCTION / RENOVATION OF UTILITY BUILDINGS
REHABILITATION OF THE EXISTING INTERNATIONAL
APRON AND TAXI WAY
CONSTRUCTION OF THE FLOOD PROTECTION FACILITIES
EXPANSION OF THE APRON AND CONSTRUCTION OF THE
NEW TAXI WAY
INSTALLATION OF NEW AIRFIELD LIGHTINGS
Duties and Responsibilities:
SETTING OUT :
Ø CIVIL WORKS
v RUNWAY / TERMINAL ROAD
v INTERNATIONAL AIRCRAFT PARKING SPOT
v APRON MARKING
v AIRCRAFT TAXI WAY
v AIRSIDE DRAINAGE FACILITY
v FLOOD PROTECTION FACILITY
v AIRSIDE MARKING
v FOUNDATION LAYOUT FOR ARON FLOODLIGHT
Ø AIRFIELD LIGHTING WORKS
v ELECTRICAL LINE LAYOUT FOR TAXIWAY AND RUNWAY
EDGE LIGHT AND SIGN
v ELECTRICAL LINE LAYOUT FOR APRON FLOODLIGHT
Ø AIR PORT BUILDING AND SUBSTATION
v SET OUT BUILDING LOCATIONS, FOUNDATION’S AND
ELEVATIONS
v LAY OUT HORIZONTAL AND VERTICAL REFERENCE LINE/
FOR WALLS, FOUNDATION’S, SLAB, CEILING, AND DOORS
v MARKING LINES FOR WALL PARTITIONS PRIOR FOR
INSTALLATION OF METAL STUD
v MARKING ELEVATIONS FOR CEILING STEEL FRAME, AND
CEILING BOARD FRAME
Dec 2016 - Oct 2019 SENIOR SURVEYOR (JAPAN)
(2 Years, 10 Months) PRIME PROJECT INTERNATIONAL JAPAN
Construction / Building / Engineering
US MILITARY BASE CONSTRUCTION OKINAWA JPN

v Conduct Topographic survey.


v Conduct as built existing utilities and existing facilities.
v Conduct GPS RTK Survey, gathering data topography and contour line
elevation.
v Establishing Bench marks elevation and Control points.
v Conducts Profile Leveling for storm drainage lines, water lines Control
Surveys.
v Executes Site Civil survey layouts for road and parking space.
v Checked Elevation and Location for Electrical and Mechanical conduits.
v Arranged site civil drawings for topographic maps.
v Arranged proposal site drawings.
v Prepares Project site as built Drawing.
v Prepares schedule coordinates for daily activities approved drawing for
construction.
v Collect survey data for as-built location of the structure and record the
variations from original Engineering plans.
v Staking out location of beam, lean concrete, footings, columns, shear
walls, core walls, grade beams, inverted beams & staircase.
v Prepares and estimates cut and fill sub-grade and top soil for
landscaping area.
Jun 2014 - Sep 2016 SENIOR SITE SURVEYOR ( OMAN )
(2 Years, 3 Months) AL BUSTAN CONSTRUCTION
Construction / Building / Engineering
ROAD PROJECT SULTANATE OF OMAN

· Conduct traverse for existing benchmark. Check and established


control point and levels
· Raise (RFI) request for inspection for the checking of control point
to the client and consultant.
· As-built existing road centerline and profiling
· Setting out of road center line and toe of slope of the road for
clearing and grabbing as-per Issued for Review Drawing.
· Conduct topographic survey for the preparation of road section
drawings, contours, and road profile
· Compute depth of cut and fill
· Setting out of box culvert, pipe culvert, bridge and future ducts
location for excavation and foundation preparation as-per Issued
for Construction Drawing.
· Prepare location and elevation of bridge foundation and culvert
· Layout retaining wall for floodway type of the road
· Setting out of super elevation of curves
· Established height limit, length, and elevation for retaining wall
construction joint
· Raise RFI for road foundation preparation prior for layer of sub-
grade
· Set and established layers of sub-base elevation, aggregate base-
course and asphalt.
· Layout ditch location, riprap and gabions limit.
Aug 2011 - Oct 2013 Site Surveyor (SAUDI ARABIA)
(2 Years, 3 Months) KETTANEH CONSTRUCTION
Oil / Gas
SAUDI ARABIA

· Run traverse for horizontal and vertical control points


· Established control points for the project vicinity
· Raise RFI for the inspection of new established control points
· Layout foundation location of pipe racks, tanks foundation,
reactor, pipelines, sub-station building’s, duct-banks, vessel
foundation, sump-pit, and manholes prior for excavation and
foundation preparation.
· Setting out centerline of foundation prior for FDT test location for
ground foundation preparation
· Layout dimension and set elevation of lean concrete for all types of
concrete foundation
· Layout foundation dimension for form works prior for concrete
pouring as-per IFC approved drawings
· Supervise and check proper location and elevation of bolt
installation prior for pouring
· Check verticality of formworks and elevation limit of concrete and
bolts tolerance as-per specification
· Check tolerance of elevation and setting out of bolt before inspection
· Raise RFI for inspection before and after concrete pouring
· Joint inspection with the Consultant & QA/QC
· As-built all anchor-bolt column foundation if as-per 3 to 5mm
required tolerance prior for handing over
Aug 2009 - Apr 2011 SITE SURVEYOR (PHILIPPINES)
(1 Year, 8 Months) D.M.CONSUNJI,INC.
Construction / Building / Engineering
SKYWAY STAGE2 PROJECT

· Prepare inspection for all horizontal and vertical control points by


the use of GPS, Total Station and auto-level
· Calculate Error of closure for control points
· Layout foundation location for excavation
· Compute depth of excavation limit for foundation
· Established reference line points and elevation prior for installation
of steel casing of excavation and installation of ring rebar of foundation
· Set elevation limit of file-cup, limit of rebar and construction joint
prior for concrete pouring
· Layout file-head for formworks and slopes
· Established elevation for limit of concrete pouring
· Layout road ramp, abutment, railings, drainage, wing wall and
electrical line services for road lights
· Layout tollgates and power utility’s
· Compute slope of curve super-elevation
Dec 2008 - Jul 2009 LAND SURVEYOR
(7 Months, 4 Weeks) DEVELOPMENT ENGINEERING AND PLANNING CONSULTANTS
Construction / Building / Engineering
MANILA, PHILIPPINES

· Prepare and check traverse of control point by angular and linear


measurement before use in site construction
· Joint survey with the sub-contractor for new established benchmark
· Check work progress and execution of work as-per project quality
plan.
· Rectify errors in all site inspection
· Check tolerance of installation of bolts, formworks, dimensions and
height as-per drawing and specification
· Conduct inspection in all civil and surveying works
· Compute volume of earth-woks
· Assist sub-contractor for setting out boundaries for installation of
sheet-pile
· Supervise and collect data for every layer of filling
· Check the depth of the sea with the contractor at the perimeter of the
work area by the use of echo sounder
· Check layout location of bored piling works
· Monitor proper work execution of bored piling
· Set reference elevation for the installation of rebar and construction
joint pile-cup
· Joint inspection with sub-contractor for the elevation and alignment
of concrete slab ramp
· As-built all finished work for handing-over
Mar 2008 - Oct 2008 SITE ENGINEER / SURVEYOR
(8 Months, 12 Hours) JAP CONSTRUCTION & DEVELOPMENT CORPORATION
Construction / Building / Engineering
BRIDGES PAMPANGA, PHILIPPINES

· Run traverse for control point and secure the accuracy and adjust
errors before it use in construction site
· Raise inspection prior for approval of all establish control point.
· Conduct topographic survey of the river up-stream and down-stream
for profiling and study the flow current pressure of the water
· Established copper dam layout for preparation of sheet piling
· Layout location of bored pile’s
· Setting out offset of sheet-piling
· Check everyday work done for the depth limit of bored piling
· Established reference elevation for checking limit of borehole depth
· Layout abutment of the bridge
· Check drawings for wing wall limit and elevation
· Organize and manage all activities related to civil works including
planning and scheduling of equipment arrangement
· Arrange safe working plan and supervise the workforce to achieved
the proper & safe execution of work as-per project quality plan
· Coordinate with all foreman with the execution of work
· Supervise & ensure site safety plan is in place and implemented
Jul 2006 - Jan 2008 LAND SURVEYOR
(1 Year, 7 Months) BROSTAN CONSTRUCTION
Construction / Building / Engineering
DAM PHILIPPINES

· Conduct close loop traverse of horizontal and vertical control point


· Joint survey with the consultant for control point approval prior for
construction site setting out.
· Conduct survey for the depth of the river prior for the construction of
break water
· Stake location and direction of cooper-dam as-per propose drawing
for breakwater
· Set reference line and elevation for the construction of toeberm of
the diversion dam
· Layout location and direction of irrigation diversion prior for
excavation, and ground foundation preparation
· Prepare elevation of blinding prior for concrete pouring
· Established layout & elevation for formworks for slab
· Layout retaining wall channel of irrigation
· Established Blue-top for all construction works
· Established slope for the cut and fill for protection wall
· Prepare blue-top on form works prior for rebar guide for installation
· Compute slope percent of protection wall
· Layout riprap limit and ditch
· Raise RFI prior for concrete pouring
· Plan and carry survey setting out for tunnel work
· Analyze survey preparation for tunnel access
· Coordinate with the technical department, site engineers in all
execution of survey works
Comply with all site safety plan

Educational Attainment
Jun 1999 - Jun 2006 University Of Lasalette
Bachelor's / College Degree
BSCE

Licenses / Certifications
Feb 10, 2023 ComputerAided Quantity Surveying
PC017739

Sep 15, 2009 AUTOCAD 2009


PC011391
Government Documents
Passport ID Number: P4818191B
Place of Issue: DFA NCR WEST
Date of Expiration: Feb 13, 2030

Trainings / Seminars
Jan 15, 2015 - Feb 15, 2015 TOPCON GPS Aplication & Survey Operation
TOPCON OMAN
Muscat, Oman

Apr 10, 2014 - Apr 15, 2014 GNSS RTK & TS ORIENTATION AND REALTIME
KINEMATIC(RTK) & TOTAL STATION APPLICATION
& SURVEY OPERATION
SURVEYTECH TRADING
SOUTH SURVEYING & MAPPING INSTRUMENTS COMPANY INC.

Nov 15, 2010 - Nov 27, 2010 LECTURE ON BASIC SURVEYING METHOD
D.M CONSUNJI, INC.
D.M CONSUNJI, INC. MANILA, PHILIPPINES

Sep 15, 2009 - Dec 20, 2009 TRAINING / SEMINAR IN AUTOCAD 2009
CADVISION ENGINEERING TECHNOLOGIES
CADVISION MANILA, PHILIPPINES

Jun 01, 2004 - Jun 02, 2004 SEMINAR AND TRAINING ON CIVIL WORKS
PHILIPPINE INSTITUTE OF CIVIL ENGINEER
PICE ISABELA PHILIPPINES

Feb 23, 2004 - Feb 24, 2004 ESSENTIAL OF PHOTOGRAMMETRY TOWARD


SUSTAINABLE DEVELOPMENT IN SURVEYING
CAREER OF GEODETIC ENGINEERING
GEODETIC ENGINERING STUDENT ASSOCIATION
UNIVERSITY OF LA SALETTE , PHILIPPINES

Skills highly proficient in the use of MS WORD, MS EXCEL and AUTO CAD
2D & 3D

Languages English | Tagalog | Japanese | arabic

Character References
Jaeson Mendoza Scheduler
Prime Project International Japan
+8180-2793-4113
jaeson.mendoza@ppiokinawa.com

Larry Mangabat Chief Surveyor


AARCON BUILDERS
+639564420050
mangabatlarry@gmail.com

You might also like