You are on page 1of 36

PIONEER INTERNATIONAL

Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,


Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 1 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment
Compressor Location : Utility ID No.
Name :
Month Jul Aug Sep Oct Nov Dec
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Out Side
1 W
Parts of Compressor
Servicing of Air
2 W
Connectors.
3 Servicing of Air Filter. M
Checking of Oil Level & fill
4 M
if require.
Checking Alignment of
5 W
Motor & Compressor.
Checking the Condition of
6 W
V- Belt

Done By.

Checked By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 2 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Note : Please tick (√) after compilation of above work

Equipment
Conveyor Belt Location : Filling Area ID No.
Name :
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
1 Clean Motor & Gear Box . W
Check the Oil & Quality of
2 M
Oil in Gear Box.
Check the Quality of Oil
3 W
Seal.
4 Greasing to the Chain. M
Checking Alignment of
5 W
Motor & Gear Box.
Checking of Earthing to
6 W
Motor/Machine.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 3 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checking The Quality of


7 W
V- Belt.

Done By.

Checked By.

Note : Please tick (√) after compilation of above work

Equipment
Conveyor Belt Location : Filling Area ID No.
Name :
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
1 Clean Motor & Gear Box . W
Check the Oil & Quality of
2 M
Oil in Gear Box.
Check the Quality of Oil
3 W
Seal.
4 Greasing to the Chain. M
Checking Alignment of
5 W
Motor & Gear Box.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 4 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checking of Earthing to
6 W
Motor/Machine.
Checking The Quality of
7 W
V- Belt.

Done By.

Checked By.

Note : Please tick (√) after compilation of above work

Equipment
Conveyor Belt Location : Filling Area ID No.
Name :
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 5 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

1 Clean Motor & Gear Box . W


Check the Oil & Quality of
2 M
Oil in Gear Box.
Check the Quality of Oil
3 W
Seal.
4 Greasing to the Chain. M
Checking Alignment of
5 W
Motor & Gear Box.
Checking of Earthing to
6 W
Motor/Machine.
Checking The Quality of
7 W
V- Belt.

Done By.

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 6 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment
Conveyor Belt Location : ID No.
Name :
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
1 Clean Motor & Gear Box . W
Check the Oil & Quality of
2 M
Oil in Gear Box.
Check the Quality of Oil
3 W
Seal.
4 Greasing to the Chain. M
Checking Alignment of
5 W
Motor & Gear Box.
Checking of Earthing to
6 W
Motor/Machine.
Checking The Quality of
7 W
V- Belt.

Done By.

Checked By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 7 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 8 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment Cream Mfg


Cream Mfg - Vessel Location : ID No. SH-1/CR/MC- MR-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Vessel.
Checking of Nut Bolt &
2 M
Out side
Checking of Scrapper
3 M
allignment.
Checking of vaccum &
4 M
Water pressure .
Checking the Condition of
5 W
V- Belt
Checking of leakages of
6 W
Valve .
Checking of
7 connection in Panel M
&Motor

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 9 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 10 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment Cream Mfg


Cream Mfg - Vessel Location : ID No. SH-1/CR/MC- MR-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Vessel.
Checking of Nut Bolt &
2 M
Out side
Checking of Scrapper
3 M
allignment.
Checking of vaccum &
4 M
Water pressure .
Checking the Condition of
5 W
V- Belt
Checking of leakages of
6 W
Valve .
Checking of
7 connection in Panel M
&Motor

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 11 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 12 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment Cream Mfg


Cream Mfg - Vessel Location : ID No. SH-1/CR/MC- MR-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Vessel.
Checking of Nut Bolt &
2 M
Out side
Checking of Scrapper
3 M
allignment.
Checking of vaccum &
4 M
Water pressure .
Checking the Condition of
5 W
V- Belt
Checking of leakages of
6 W
Valve .
Checking of
7 connection in Panel M
&Motor

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 13 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 14 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment Cream Mfg


Cream Mfg - Vessel Location : ID No. SH-1/CR/MC- MR-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Vessel.
Checking of Nut Bolt &
2 M
Out side
Checking of Scrapper
3 M
allignment.
Checking of vaccum &
4 M
Water pressure .
Checking the Condition of
5 W
V- Belt
Checking of leakages of
6 W
Valve .
Checking of
7 connection in Panel M
&Motor

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 15 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 16 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment Cream Mfg


Cream Mfg - Vessel Location : ID No. SH-1/CR/MC- MR-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Vessel.
Checking of Nut Bolt &
2 M
Out side
Checking of Scrapper
3 M
allignment.
Checking of vaccum &
4 M
Water pressure .
Checking the Condition of
5 W
V- Belt
Checking of leakages of
6 W
Valve .
Checking of
7 connection in Panel M
&Motor

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 17 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 18 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment Cream Mfg


Cream Transfer Pump Location : ID No. SH-1/CR/MC- CT-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Machine
Checking of Nut Bolt
2 M
inside & Out side
Checking of visual Inside
3 M
Screw allignment.
Checking of allignment of
4 M
pully of Pump & Motor .
Checking of Connection
5 W
in Panel Board .
Checking the Condition of
6 W
V- Belt

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 19 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 20 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment Cream Mfg


Cream Transfer Pump Location : ID No. SH-1/CR/MC- CT-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Machine
Checking of Nut Bolt
2 M
inside & Out side
Checking of visual Inside
3 M
Screw allignment.
Checking of allignment of
4 M
pully of Pump & Motor .
Checking of Connection
5 W
in Panel Board .
Checking the Condition of
6 W
V- Belt

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 21 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 22 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment Cream Mfg


Cream Transfer Pump Location : ID No. SH-1/CR/MC- CT-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Machine
Checking of Nut Bolt
2 M
inside & Out side
Checking of visual Inside
3 M
Screw allignment.
Checking of allignment of
4 M
pully of Pump & Motor .
Checking of Connection
5 W
in Panel Board .
Checking the Condition of
6 W
V- Belt

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 23 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 24 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment Cream Mfg


Cream Transfer Pump Location : ID No. SH-1/CR/MC- CT-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Machine
Checking of Nut Bolt
2 M
inside & Out side
Checking of visual Inside
3 M
Screw allignment.
Checking of allignment of
4 M
pully of Pump & Motor .
Checking of Connection
5 W
in Panel Board .
Checking the Condition of
6 W
V- Belt

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 25 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 26 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment Cream Mfg


Cream Transfer Pump Location : ID No. SH-1/CR/MC- CT-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Machine
Checking of Nut Bolt
2 M
inside & Out side
Checking of visual Inside
3 M
Screw allignment.
Checking of allignment of
4 M
pully of Pump & Motor .
Checking of Connection
5 W
in Panel Board .
Checking the Condition of
6 W
V- Belt

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 27 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

Equipment Cream Mfg


Cream Transfer Pump Location : ID No. SH-1/CR/MC- CT-01
Name : Area
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Cleaning of Inside & Out
1 w
Side Parts of Machine
Checking of Nut Bolt
2 M
inside & Out side
Checking of visual Inside
3 M
Screw allignment.
Checking of allignment of
4 M
pully of Pump & Motor .
Checking of Connection
5 W
in Panel Board .
Checking the Condition of
6 W
V- Belt

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 28 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Done By.

Checked By.

Note : Please tick (√) after compilation of above work

Equipment
DM Plant Location : DM Plant ID No. SH-1-MC - DMP -01
Name :
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Checking Of Flow rate of
1 w
water
Checking of Pressure
2 M
meter.
3 Checking of Portable valve M
Cleaning of Resins of
4 M
cation & Anion
Checking of allignment of
5 W
pully of Pump & Motor .

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 29 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checking of Connection in
6 W
Panel Board .

Done By.

Checked By.

Note : Please tick (√) after compilation of above work

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 30 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Equipment
STP Location : DM Plant ID No. SH-1-MC - DMP -01
Name :
Month Jan Feb Mar April May Jun
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
Week 1 2 3 4 5 6 7 8 9
0 1 2 3 4 4 6 7 8 9 0 1 2 3 4 5
Sr.
Frequen
No Check Points
cy
.
Checking Of Flow rate of
1 w
water
Checking of Pressure
2 M
meter.
Checking of Portable
3 M
valve
Cleaning of Resins of
4 M
cation & Anion
Checking of allignment of
5 W
pully of Pump & Motor .
Checking of Connection
6 W
in Panel Board .

Done By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 31 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checked By.

Note : Please tick (√) after compilation of above work

Equipme
nt Name Shrinking Machine Location : Shrinking Area ID No. SH-1-MC - SM -06
:
Month Jul Aug Sep oct Nov Dec
2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 5 5
Week
27 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2
Sr. Freque
Check Points
No. ncy
Check Bearing
& Chain Socket
1 W
& Quality of
Shaft
Clean Motor &
2 W
Ger Box
Check Quality &
3 Quantity of Oil M
in Gear Box
Check the
4 Quality of Oil W
Seal
Greesing to the
5 W
Chain

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 32 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Checking
alligment of
6 M
Motor & Gear
Box
Checking
7 Condition of V W
Belt
Checking
8 Heater Load & W
Ampier
Checking
9 Connection in W
Panel Board
Done By.
Checked By.
Equipme
nt Name Shrinking Machine Location : Shrinking Area ID No. SH-1-MC - SM -06
:
Month Jul Aug Sep oct Nov Dec
2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 5 5
Week
27 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2
Sr. Freque
Check Points
No. ncy
Check Bearing
& Chain Socket
1 W
& Quality of
Shaft

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 33 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

Clean Motor &


2 W
Ger Box
Check Quality &
3 Quantity of Oil M
in Gear Box
Check the
4 Quality of Oil W
Seal
Greesing to the
5 W
Chain
Checking
alligment of
6 M
Motor & Gear
Box
Checking
7 Condition of V W
Belt
Checking
8 Heater Load & W
Ampier
Checking
9 Connection in W
Panel Board
Done By.
Checked By.
Equipme ac Location : Shrinking Area ID No. SH-1-MC - SM -06
nt Name

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 34 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

:
Month Jul Aug Sep oct Nov Dec
2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 5 5
Week
27 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2
Sr. Freque
Check Points
No. ncy
Check comp-1 W
Pulley Alingment
Check Comp-1 W
Belt Tention
Check HP/LP M
cutout operation
Check AFTH
switch cutof W
operation
Check OPTH
switch cut of W
operation
Check DIFF M
switch operation
Check Gas
W
Leakage
Motors Current
W
and Relay Setting
Motors earthing
& Fitments W
checking
All Conct.kits
clean or replaced

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 35 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

All
Conct.ki
ts clean
Done By.
or
replace
d
Checked By.

M : Monthly W : weekly
PIONEER INTERNATIONAL
Plot No. 42, Industrial Estate, Opp. Hirvavan Garden, Piparia,
Silvassa. D & NH -396230

TITLE : PM CHECKLIST FORMAT NO. PI-ENG-


F001
DATE OF ISSUE DUE DATE OF REVIEW EFFECTIVE DATE REVISION NO. PAGE 36 OF
R0-00
Last Date of Signature 2 Years from Effective Date 7 Days from last date
of signature

M : Monthly W : weekly