AMENDMENT NO.

1 TO TECHNICAL/COMMERCIAL SPECIFICATION
ANNEXURE-X
SPECIFICATION REFERENCE
S.
SEC/ SUBS PAGE CLAUSE EXISTING READ AS
NO.
PART EC. NO. NO.
Mill building for each unit for housing Mills, Mill building(s) for housing Mills, Unloading and Injec-
1. VI/A I 3 of 6 1.03.02 Unloading and Injection Blowers, Truck unload- tion Blowers, Truck unloading Blowers, Dehumidifiers
ing Blowers, Dehumidifiers etc. etc.
The Contractor's scope of work includes supply The Contractor's scope of work includes supply of
of paints and painting of all equipment and struc- paints and painting of all equipment and structures as
tures as per specified painting scheme and as per per specified painting scheme and as per the Employer’s
the Employer’s standard color coding scheme standard color coding scheme which shall be furnished
which shall be furnished to the Contractor during to the Contractor during detail engineering stage. How-
detail engineering stage. The painting of various ever in case of imported items OEM’s standard col-
components shall comply with the requirements our coding scheme and painting scheme can be con-
2. VI/A III 1 of 5 1.04.01
stipulated in different part of this specification. sidered subject to approval of Owner, to be submit-
However, for components where no specific re- ted during detail engineering stage. The painting of
quirement is stipulated, the painting conforming various components shall comply with the requirements
to the requirements stipulated below shall be stipulated in different part of this specification. Howev-
provided. er, for components where no specific requirement is
stipulated, the painting conforming to the requirements
stipulated below shall be provided.
Contractor shall provide a mill building for each Contractor shall provide a mill building for each
unit which will house Mills, Unloading and In- unit/common for units, which will house Mills, Un-
3. VI/A III-A1 3 of 4 4.10.10
jection Blowers, Truck unloading Blowers, De- loading and Injection Blowers, Truck unloading Blow-
humidifiers. …………………………. ers, Dehumidifiers. ………………………….
10. Acid Gas removal efficiency (Continuous) DELETED
4. VI/A V 2 of 3 1.00.00
(%) : 80 (Guarantee point/ Design point)

DRY SORBRNT INJECTION SYSTEM PACKAGE


GURU GOBIND SINGH THERMAL PLANT, ROPAR AMENDMENT NO. PSPCL/CW-CC-9971(A)-109-AMDT-01 Page 1 of 4
(4 X 210 MW) BID DOCUMENT NO. PSPCL/CW-CC-9971(A)-109
AMENDMENT NO. 1 TO TECHNICAL/COMMERCIAL SPECIFICATION
ANNEXURE-X
SPECIFICATION REFERENCE
S.
SEC/ SUBS PAGE CLAUSE EXISTING READ AS
NO.
PART EC. NO. NO.
The performance tests shall be carried out in ac- The performance tests shall be carried out in accordance
cordance with ASME PTC 40 (1991) code. No with ASME PTC 40 (2017) code. No tolerance or al-
tolerance or allowance on the test result will be lowance on the test result will be permitted for instru-
permitted for instrument errors or inaccuracy, the ment errors or inaccuracy, the method of testing or any
5. VI/A VI 9 of 10 6.00.00
method of testing or any other causes. The de- other causes. The details of the test shall, however be
tails of the test shall, however be mutually mutually agreed upon between the employer and the
agreed upon between the employer and the con- contractor.
tractor.
Online Mill cleaning system shall be provided. In-situ Mill cleaning system shall be provided.
6. VI/B I-M1 6 of 27 4.03.05
…………………………………. ………………………………….
The Blower & Dehumidifier shall be sized & The Blower & Dehumidifier shall be sized & designed
designed considering 45 degree Celsius ambient considering 45 degree Celsius ambient air temperature
air temperature and RH of 40%. The dew point and RH of 40%. The dew point of outlet air shall be
7. VI/B I-M1 6 of 27 4.05.00 of outlet air shall be considered +2 degree Cel- considered +2 degree Celsius at atmospheric pressure
sius at atmospheric pressure for sizing. for sizing. Moreover, a combination of refrigerant
and dessicant type or only refrigerant type shall be
used to achieve the above conditions.
Terminal Points Child water to be generated by bidder. One no. Termi-
8. VI/A IV 1 of 1 1.00.00 nal point will be provided for service water and
potable water by PSPCL

DRY SORBRNT INJECTION SYSTEM PACKAGE


GURU GOBIND SINGH THERMAL PLANT, ROPAR AMENDMENT NO. PSPCL/CW-CC-9971(A)-109-AMDT-01 Page 2 of 4
(4 X 210 MW) BID DOCUMENT NO. PSPCL/CW-CC-9971(A)-109
AMENDMENT NO. 1 TO TECHNICAL/COMMERCIAL SPECIFICATION
ANNEXURE-X
SPECIFICATION REFERENCE
S.
SEC/ SUBS PAGE CLAUSE EXISTING READ AS
NO.
PART EC. NO. NO.
Earnest Money Deposit (EMD)/Bid Security of Earnest Money Deposit (EMD)/Bid Security of an
an amount INR 2,00,00,000/- (Indian Rupees amount INR 2,00,00,000/- (Indian Rupees two Crore
two Crore only) in the form of demand draft fa- only) in the form of demand draft favoring Accounts
voring Accounts Officer- O &M GGSSTP paya- Officer- O &M GGSSTP payable at Rupnagar, State –
ble at Rupnagar, State –Punjab, India, shall be Punjab, India, or through RTGS bank transfer details of
submitted offline prior to date and time for which shall be submitted prior to date and time for
Sec-
9. 3 of 8 5 online bid submission. online bid submission in physical form in the office of
tion-1
Dy. Chief Engineer/ Monitoring, GGSSTP, Rupnagar.
The Bank details for RTGS are as under:
Bank Name State Bank of India, Hospital Road,Ropar
Account No.55019180121
IFSC Code : SBIN0050082
Account Holder: A.O./O&M,GGSSTP
Contractor will make his own water supply ar- Contractor will make his own water supply arrangement
rangement for construction as well as drinking for construction by installing tube wells; jet pumps etc.
Sec- purposes by installing tube wells; jet pumps etc. all
New all laying distribution pipes where ever required. One
10. tion-5 12 of 13 51(a) laying distribution pipes where ever required. No
GCC no. Terminal point will be provided for service water
(SSC) arrangement will be made by the board for water
and potable water by PSPCL.
supply.

--- In case during execution of the Job if successful bidder


encounter any underground equipment / structure,
PSPCL will provide suitable time extension to solve the
bottleneck. In case any underground Pipeline or Cables
Section-5 (SSC) Add New GCC Clause
11. are to be rerouted, PSPCL will give timely shutdown to
No. 52
execute the Job. Commercial Implications including
Time Extension shall be mutually discussed and agreed
upon. The decision of the Chief Engineer/GGSSTP will
be final.

DRY SORBRNT INJECTION SYSTEM PACKAGE


GURU GOBIND SINGH THERMAL PLANT, ROPAR AMENDMENT NO. PSPCL/CW-CC-9971(A)-109-AMDT-01 Page 3 of 4
(4 X 210 MW) BID DOCUMENT NO. PSPCL/CW-CC-9971(A)-109