1 TO TECHNICAL/COMMERCIAL SPECIFICATION
ANNEXURE-X
SPECIFICATION REFERENCE
S.
SEC/ SUBS PAGE CLAUSE EXISTING READ AS
NO.
PART EC. NO. NO.
Mill building for each unit for housing Mills, Mill building(s) for housing Mills, Unloading and Injec-
1. VI/A I 3 of 6 1.03.02 Unloading and Injection Blowers, Truck unload- tion Blowers, Truck unloading Blowers, Dehumidifiers
ing Blowers, Dehumidifiers etc. etc.
The Contractor's scope of work includes supply The Contractor's scope of work includes supply of
of paints and painting of all equipment and struc- paints and painting of all equipment and structures as
tures as per specified painting scheme and as per per specified painting scheme and as per the Employer’s
the Employer’s standard color coding scheme standard color coding scheme which shall be furnished
which shall be furnished to the Contractor during to the Contractor during detail engineering stage. How-
detail engineering stage. The painting of various ever in case of imported items OEM’s standard col-
components shall comply with the requirements our coding scheme and painting scheme can be con-
2. VI/A III 1 of 5 1.04.01
stipulated in different part of this specification. sidered subject to approval of Owner, to be submit-
However, for components where no specific re- ted during detail engineering stage. The painting of
quirement is stipulated, the painting conforming various components shall comply with the requirements
to the requirements stipulated below shall be stipulated in different part of this specification. Howev-
provided. er, for components where no specific requirement is
stipulated, the painting conforming to the requirements
stipulated below shall be provided.
Contractor shall provide a mill building for each Contractor shall provide a mill building for each
unit which will house Mills, Unloading and In- unit/common for units, which will house Mills, Un-
3. VI/A III-A1 3 of 4 4.10.10
jection Blowers, Truck unloading Blowers, De- loading and Injection Blowers, Truck unloading Blow-
humidifiers. …………………………. ers, Dehumidifiers. ………………………….
10. Acid Gas removal efficiency (Continuous) DELETED
4. VI/A V 2 of 3 1.00.00
(%) : 80 (Guarantee point/ Design point)