You are on page 1of 3

Appendix 60

Entity Name: DASNHS Fund Cluster: 101

Office/Section : SHS PR No.: Date:


Responsibility Center Code :
___________
Stock/ Property No. Unit Item Description Quantity Unit Cost Total Cost

1 Pc Jigsaw 1 11,780.00 11,780.00


2 Pc. electric drill 1 4,380.00 4,380.00
3 Pc. circular saw 1 6,850.00 6,850.00
4 Pc. sander 1 3,650.00 3,650.00
5 Pc. pull push rule 2 299.75 599.50
6 Pc. caliper 1 562.00 562.00
7 Pc. claw hammer 2 168.00 336.00
8 Kg. Nails (1') 1 82.00 82.00
9 Kg Nails (2') 1
10 Kg Nails (3') 1
11 Kg Nails (4') 1
12 Kg Screws (1') 1
13 Kg Screws (2') 1
14 Kg Screws (3') 1
15 Kg Screws (4') 1
16 Pcs Dowels 1 9.00 9.00
17 Pc. Mallet 2 359.75 719.50
18 Set Screwdriver 1 124.00 124.00
19 Pc. Try square 2
20 Pc. Steel square 2 559.00 1,118.00
21 Pc. Level bar 2 895.75 1,791.50
22 Mtr Water hose level 6
23 Pc. Plumb bob 2 754.00 1,508.00
24 Pc. Chalk line 1 659.00 659.00
25 Pc. Marking guage 1
26 Set Chisel 2 449.75 899.50
27 Pc. Cross cut saw 2 240.00 480.00
28 Pc. Rip saw 2
29 Pc. Hack saw 2 317.00 634.00
30 Pc. C clamp 4 540.00 2,160.00
31 Pc. Bench vise 2 16,310.00 32,620.00
32 Pc. Safety goggles 1 166.00 166.00
Construction
33 Pair 1 28.00 28.00
gloves
34 Pc. Hardhat 1 275.00 275.00
35 Pc. Vinyl 25
36 Pc. Crow bar 2 315.00 630.00
Cordless screw
37 Pc. 1 7,350.00 7,350.00
driver
38 Pc. Nail gun 1
39 Pc. Steel toe 1 1,550.00 1,550.00
40 Pc. Over all suit 1 950.00 950.00
41 Pc. Adator 5
Extension wire
42 Pc. 1 136.00 136.00
(with 4-6 gangs)
gal wood glue 1 199.75 199.75

Total P 82,246.75
Purpose : Needed for the performance of carpentry students.

Requested by: Approved by:

Signature :

Printed Name : JENNILOU A. HINAYAS


Teacher 1 YOLANDA T. DELA CERNA
Principal II

You might also like