You are on page 1of 11

Project: ETAP Page: 1

Location: 16.0.0C Date: 09-22-2019


Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 5 6

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 1 1 0 0 0 3 5

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 60.00 Hz

Unit System: English

Project Filename: S.E.ILO

Output Filename: C:\Users\ELMER\Desktop\TRABAJO PROTECCION\S.E.ILO\LF_1.lfr


Project: ETAP Page: 2
Location: 16.0.0C Date: 09-22-2019
Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: ETAP Page: 3
Location: 16.0.0C Date: 09-22-2019
Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 138.000 1 100.0 0.0

Bus2 138.000 1 100.0 0.0

Bus3 10.000 1 100.0 0.0

Bus4 22.900 1 100.0 0.0 5.817 3.165 1.454 0.791

Bus5 10.000 1 100.0 0.0 2.430 0.824 0.607 0.206

Bus6 10.000 1 100.0 0.0

Total Number of Buses: 6 8.247 3.989 2.062 0.997 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 138.000 Swing 1 100.0 0.0

0.000 0.000
Project: ETAP Page: 4
Location: 16.0.0C Date: 09-22-2019
Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 10.000 138.000 10.000 10.00 8.00 0 0 0 0 0 10.0000 Dyn 0.000

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation Phase Shift


ID Winding MVA kV % % Z1 X1/R1 MVAb % Tol. + 5% - 5% Type Angle

T2 Primary: 20.000 138.000 0 Zps = 11.00 15.00 20.000 0 0 0

Secondary: 10.000 10.000 2.00 Zpt = 16.00 17.00 20.000 0 Std Pos. Seq. 0.000

Tertiary: 10.000 22.900 2.00 Zst = 4.20 10.00 20.000 0 Std Pos. Seq. 0.000
Project: ETAP Page: 5
Location: 16.0.0C Date: 09-22-2019
Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus2 Bus6 12.40 99.23 100.00

T2 3W Xfmr Bus2 Bus3 5.13 50.82 51.08

3W Xfmr Bus2 Bus4 -227.01 -508.15 556.55

3W Xfmr Bus3 Bus4 2.38 20.88 21.02

IT-01 Tie Breakr Bus1 Bus2

IT-03 Tie Breakr Bus3 Bus5

IT-07 Tie Breakr Bus6 Bus5


Project: ETAP Page: 6
Location: 16.0.0C Date: 09-22-2019
Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 138.000 100.000 0.0 10.285 5.646 0 0 Bus2 10.285 5.646 49.1 87.7
Bus2 138.000 100.000 0.0 0 0 0 0 Bus6 3.753 0.640 15.9 98.6
Bus1 -10.285 -5.646 49.1 87.7
Bus3 6.531 5.006 34.4 79.4
& Bus4
Bus3 10.000 98.967 -2.1 0 0 0 0 Bus5 -0.711 0.530 51.7 -80.2
Bus4 0.711 -0.530 51.7 -80.2 2.000
& Bus2
Bus4 22.900 97.860 -3.1 0 0 7.210 3.923 Bus2 -7.210 -3.923 211.5 87.8 2.000
& Bus3
Bus5 10.000 98.967 -2.1 0 0 3.025 1.026 Bus3 0.711 -0.530 51.7 -80.2
Bus6 -3.735 -0.496 219.8 99.1
Bus6 10.000 98.967 -2.1 0 0 0 0 Bus2 -3.735 -0.496 219.8 99.1
Bus5 3.735 0.496 219.8 99.1
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 7
Location: 16.0.0C Date: 09-22-2019
Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 138.000 11.733 87.7 49.1


Bus2 138.000 11.733 87.7 49.1
Bus3 10.000 0.887 80.2 51.7
Bus4 22.900 5.817 3.165 1.393 0.758 8.208 87.8 211.5
Bus5 10.000 2.430 0.824 0.595 0.202 3.874 96.4 226.0
Bus6 10.000 3.768 99.1 219.8

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: ETAP Page: 8
Location: 16.0.0C Date: 09-22-2019
Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
(Amp) Amp (MVA)
ID Type % MVA % MVA %

T1 Transformer 10.000 3.808 38.1 3.768 37.7

T2 3W XFMR p 20.000 8.229 41.1

3W XFMR s 10.000 0.887 8.9

3W XFMR t 10.000 8.208 82.1

* Indicates a branch with operating load exceeding the branch capability.


Project: ETAP Page: 9
Location: 16.0.0C Date: 09-22-2019
Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

T1 3.753 0.640 -3.735 -0.496 18.0 143.9 100.0 99.0 1.03

T2 6.531 5.006 0.711 -0.530 32.7 553.2 100.0 99.0 1.03

T2 0.000 0.000 -7.210 -3.923 100.0 97.9 2.14

50.7 697.0
Project: ETAP Page: 10
Location: 16.0.0C Date: 09-22-2019
Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 103.0 103.0
UnderVoltage 97.0 97.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Project: ETAP Page: 11
Location: 16.0.0C Date: 09-22-2019
Contract: SN: 4359168
Engineer: Revision: REVISION A
Study Case: LF
Filename: S.E.ILO Config.: ESC A

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 10.285 5.646 11.733 87.66 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 10.285 5.646 11.733 87.66 Lagging

Total Motor Load: 8.247 3.989 9.161 90.02 Lagging

Total Static Load: 1.988 0.960 2.207 90.06 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.051 0.697

System Mismatch: 0.000 0.000

Number of Iterations: 3