You are on page 1of 1

T R A N S M IS S ION PART S

Instructions

Jatco/Nissan JF011E (RE0F10A)


Oversized
Secondary Pulley
Control Valve Kit
JF011E
Middle
TOOL Valve Body

Part No. R
EQ
D

UIRE

113741-19K
• Valve
Valve
• End Plug
NOTE: Also fits Mitsubishi F1CJA.
End
Plug

Tool Kit

Tool Kit
Part No.
F-113741-TL17
• Reamer
• Reamer Jig
1. Disassembly
• Guide Pin a. Remove OE retainer and save for reuse.
NOTE: Sonnax “F-Tool” kits designed to b. Remove and discard OE end plug.
service a specific bore require the VB-FIX,
a self-aligning valve body reaming fixture. c. Remove OE spring and save for reuse.
More information and instructions can be d. Remove and discard OE valve.
found online at www.sonnax.com.
Tool Kit for 113741-19K can also be used 2. Bore Reaming
for 113741-17K. Ream secondary pulley control bore (for reaming instructions/reamer care, please visit
www.sonnax.com). Sonnax reaming tool kit F-113741-TL17 and VB-FIX are required
for this operation.
NOTE: Tool kit F-113741-TL17 contains two
reamers. For JF011E valve bodies, use reamer
F-113741-RM19 ONLY.

16"-Hg
3. Installation & Assembly
a. Remove all debris from valve bores and body. 25
20
15
10
5
30 0

b. Install Sonnax secondary pulley control valve.


VACUUM
TEST

c. Reinstall OE spring.
d. Install Sonnax end plug.
e. Reinstall OE retainer.

4. Final Testing
Vacuum testing at the port indicated holds the
JF011E Middle Valve Body
recommended minimum 16 in-Hg.
©2019 Sonnax Transmission Company, Inc. • A Marmon / Berkshire Hathaway Company 113741-19K-IN 02-08-19
800-843-2600 • 802-463-9722 • F: 802-463-4059 • www.sonnax.com

You might also like