YEAR-ROUND

CONSTRUCTION
IN THE ARCTIC.

YAMAL LNG
YAMAL, RUSSIA
23 SEPTEMBER MODULE ROLLING OFF THE 7 OCTOBER TRANSPORT OF MODULE 20 DECEMBER PASSING THE GAP, SLOWLY 25 DECEMBER EVEN AT -33 DEGREES ARCTIC
2015 VESSEL 2015 OVER 110 METERS LONG 2016 ROLLING OVER THE RAMP 2016 SPMTS PERFORM WELL

A Z

VAST GAS PLANT PROJECT COMPLETED IN EXTREME CONDITIONS.


500 kilometers north of the Arctic Building a vast LNG plant – encom- Mammoet had prepared well in To ensure the successful completion
Circle lies Sabetta, on Russia’s passing natural gas production, advance for the Arctic environment. of the operation, Mammoet sourced
Yamal Peninsula. This remote and liquefaction and shipping – in one of This included innovating their and accommodated a team of highly
perilously cold place sits on the the most inhospitable places on the Self-Propelled Modular Transporters skilled personnel. The team used their
RESOURCES
largest gas reserves in the world. planet, presented the Yamal LNG (SPMTs) that were adapted for the experience to carefully manage the
The Yamal Liquid Natural Gas consortium with colossal challenges. frozen conditions. A huge number equipment and workforce – optimiz- CRANES
3 crawler cranes
(LNG) plant will deliver three of these specialist pieces of ing the working space and use of
4 mobile cranes
liquefaction trains, each carrying The site is shrouded in darkness for equipment were used to transport resources.Mammoet’s ability to
TRANSPORT
5.5 million metric tons of LNG per much of the year and temperatures components from vessels moored prepare and innovate in advance, and
1,718 axle lines of SPMT
year. The plant is one of the can fall to -57ºC. To maintain large- at the port to the construction site then mobilize the vast resources Trucks, trailers, buses, pick-ups,
forklifts, cherry pickers
biggest and most complex energy scale, year-round construction in such and precisely maneuver the modules required for this project, enabled the
projects ever undertaken. Its safe an environment, a modular prefabri- onto their foundations. At the client to achieve their goal of safe, SPECIAL EQUIPMENT
Jacking Crate System
and efficient construction required cated approach was required. Around height of the project, 25 modules, year-round construction on a massive
equipment and expertise on an 142 modules weighing up to 7,000 with a combined weight of 56,000 scale, unhindered by extreme CREW
370 Mammoet Professionals (from
unprecedented scale. All to be tons were assembled off-site ready tons, were transported in a four- geographical and climatic challenges.
15 nationalities)
deployed to an area subject to the for transport and installation. This week period. This involved 1,718 Since December 2017, the plant is
most challenging of conditions. minimized the impact of the weather axle lines working on the site operating and will produce 16.5
Mammoet scaled up and on construction and optimized the simultaneously. million tons of LNG per year when
innovated to meet the challenge. reliability of the supply chain. completed.