Professional Documents
Culture Documents
DEPARTMENT OF CIVIL
ENGINEERING
DIPLOMA IN LAND SURVEYING
REMOTE SENSING
PREFACE
It has been prepared and compiled with the assistance and advice
of Geomatic Lab Sheets Committee.
Azilawati Bt Harun,
Polytechnic Tuanku Sultanah Bahiyah
Table Of Content
Course Description
Lab sheet 1:
Import, Interpretation the satellite Imagery and Geometric correction using the
registration of image to map grid method
Lab sheet 2:
Geometric correction using the registration of image to to image registration
method
Lab sheet 3 :
Image classification and map annotation
DCG6172- REMOTE SENSING
Course Description
CREDIT(S) : 2
SYNOPSIS
REMOTE SENSING equips students with the knowledge of imagery concept. This course
explains the concept of data capture from electromagnetic energy recording, by sensors
brought by airplane or satellite. This course also develops student’s skills in using software
for digital image processing, digital image enhancement and image classification.
WORK PROCEDURES
a) Import satellite image
Convert the LAN (Erdas 7.x ) into imagine format (*.img) using tools in remote
sensing software.
b) Subset of the image
c) Image interpretation
Instruction to student :
Refer to satellite image. The features in the image include river, water bodies, road,
vegetation, soil and residential area. Explain how you are able to do so base on the elements
of visual interpretation. ( Give your answer in Table 1 )
DCG6172- REMOTE SENSING
2. Water Bodies
3. Road
4. Vegetation
5. Soil
6. Residential Area
WORK PROCEDURES
REPORT ( 20 marks)
At the end of this practical, student must send report containing following case:
ASSESSMENTS;
i) Preparation of work
ii) Following Procedure
iii) Group Discussion
iv) Results
v) Discipline
DCG6172- REMOTE SENSING
WORK PROCEDURES
Ground control point
Examine the 10 ground control points (gcp) coordinate from the georeferenced image
Geometric correction
By using remote sensing software, register the satellite image into true coordinate
system using the 10 ground control points (gcp) coordinate obtained from the
georeferenced image
Define the coordinate system of the reference data
Make sure the RMS error should < 1
If > 1, then check and redo the ground control point (gcp) and its coordinates.
Save your output satellite image into new files
Subset of the image
REPORT ( 20 marks)
At the end of this practical, student must send report containing following case:
ASSESSMENTS;
WORK PROCEDURES
Geomatric correction
Continue result from lab 2
Used image to image registration to perform geometric correction
REPORT ( 20 marks)
At the end of this practical, student must send report containing following case:
ASSESSMENTS;
i) Preparation of work
ii) Following Procedure
iii) Group Discussion
iv) Results
v) Discipline