BILL OF QUANTITIES (Provisional Quantity)
BILL OF QUANTITIES (Provisional Quantity)
1
2
3
4 BILL OF QUANTITIES (Provision
5 SUPPLY OF MATERIALS, LABOR, TOOLS, EQUIPMENT AND SU
6
7 PROJECT : SEA GAMES 2019 AQUATIC CENTER
8 LOCATION : CAPAS, TARLAC
9 SUBJECT : ARCHITECTURAL WORKS (Painting)
10 DATE : AUGUST 28 2018
11 :
12
13 Uni
Item Description Quantity unit
14 Material
15
16 A GENERAL REQUIREMENTS
17 A.1 Preliminaries
37
38 B MEASURED WORKS
39
40 75.00 225.00
694,575.00
41
42
43 135.00 435.00 3,992,430.00
44
45
46 135.00 435.00 3,636,600.00
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
cost of the Sub-contractor;
64
65
I J K L
13 Unit Rate
Total Cost Remarks
14 Labor Total
s in compliance66
with Gencon's target schedule;
67
68
69
70
t manpower, the71Gencon will takeover the delayed works and charge to the
plus 15% cost of
72money and overhead;
upon receipt of Site
73 Instruction or any statuary orders arising within the contract period,
74
75
76
77
emeasurement based
78 on actual installed;
y the national and
79 local government units;
80
81
82 Php 9,223,605.00