IADC HSE Case Guideline PDF
IADC HSE Case Guideline PDF
Global Version
including
Combined Operations
Dominic Cattini
Director European Operations
What is our Focus?
Integration
• Experience
• Knowledge
• International Standards
• ISO 9001
• ISO 14001
• ISO 17776
• OSHAS 18001
Identify
Step 1 hazards
Evaluate Screening
Step 2
risk Criteria
Identify
Risk-reduction
measures
Step 3
Set functional
requirements
Risk Management Process (SHIDAC)
• The SHIDAC process incorporates:
• The basics of Fault and Event Tree Analyses;
• Measures to control major and other workplace
hazards;
• Ensures barriers are identified, established, monitored
and consistently maintained
• Key deliverables:
• Determination of major and other workplace hazards;
• Critical Activities / tasks related to a drilling contractors
scope of operations;
Risk Assessment Matrix
1 Slight
harm
Slight
damage
Slight
effect
Slight
impact
Low Risk
2 Minor Minor Minor Limited
harm damage effect impact
3 Major
harm
Local
damage
Local
effect
Considerable
impact
Medium Risk
4 Single Major Major National
fatality damage effect impact
Control 2.1
Source 2.1
Consequence 2.1 3A / 2B / Control 2.2 Defence 2.1
Source 2.2
Hazard 2 Consequence 2.2 N Y 3E / 2B – Control 2.3 Defence 2.2
Source 2.3
Source 2.4
Consequence 2.3 3E Control 2.4 Defence 2.3
Control 2.5
Risk Optimisation Strategy