OPERATION TITLE: JOB LOCATION: DATE PERFORMED:

Drilling Operations Drilling Rig November …


PERFORMED BY: VERIFIED BY:
JOB HAZARD ANALYSIS Fiel, Kristiana Franchesca F. Engr. Karl Patrick B. Garcia
PERSONAL PROTECTIVE EQUIPMENT USED:

SEQUENCE OF BASIC JOB STEPS EXISTING AND POTENTIAL HAZARDS RECOMMENDED CORRECTIVE MEASURES
1. Transfer of pipe from rig supply o Dropped object Hazard o Check regularly the hoisting system structure
vessel o Slip-pipe Hazard (cranes).
o Overloading Hazard o Pipes to be transferred should be leveled
o Weather Conditions accordingly before hoisting.
o Current, Wave, and Wind Collinear o Operate at safe load requirements of the hoisting
and Non-Collinear Effects system.
o Always have open communication with the crane
operator
o The supply vessel should be moored adequately to
provide constant distance from the rig all throughout
the operation.
o Operations are preferably to be done in a fair
weather when parallel and transverse effects are
less.