TEAM MEMBERS (RESP.) HAZARD IDENTIFICATION,RISK ASSESSMENT (HIRA)
1) JOB:- Alignment and erection Of Kiln Shell
2) ROUTINE/NON ROUTINE: Daily
3) DEPARTMENT / SECTION:- Mechanical
4) APPROVED BY : ISSUED BY :
1. Wear all work force proper PPEs Like helmet With chin 1.Ensure SWP to be followed.
strap safety shoes safety jacket , safety harness in height
elevations Etc.. .
2. .Provide all connections through ELCB or RCCB only
3. Choose right tools and tackles for erection purpose..
4. Check the lifting tools for any kind of damages .
1. Improper handling. 5. Display the permit.
2. Loose connections. 6. Ensure tool box meeting is conducted.
3. Improper usage of PPEs 7. Check for any type of loose connection & damages in
4. Damage of cable cable.
5. Falling of men and material from 8. Ensure that if the work is above 1.8 mtr ,take height
height. work protection & permit.
Making of temporary roller
5 for kin shell alignment and R N 9. Ensure that the rollers are inter locked well before the 1 4 1 4 1 1 0.5 0.5 4
welding purpose erection of kiln shell.
(* cut & scratch injury 10. Proper access & egress are provided.
* Electric shock. 11. Only trained work force should engage the activity.
* Burn injury 12. Only One signal man should give signals for the crane
* Eye injury.
* Fatal)
1. Replacing defective / damaged tools. 1.Ensure SWP to be followed.
2. Use tools only with protective handles.
3. Training & instruction to use right tool for the right
job.
4. Keep tools only in toolboxes.
5. Use proper tested tools and tackles.
6. Provide proper packing in slings.
7. Check for any obstructions in lifting area.
8. Ensure that no over head obstructions.
9. Ensure that all work force involved in job is wearing all
type of PPEs
10. Proper access & egress are provided.
1. Failure of crane 11. Area is properly barricaded.
Erection of material KILN 13. Proper ladder is provided to reach the height.
2. Improper handling.
Shell with the help of 14. Ensure that the tools which are using in height is
3. Failure of lifting tools.
6 crane, hydra R N properly tied to never fell down. 1 4 1 4 1 1 0.5 0.5 4
4. Toppling of crane
,winch machine etc….. 15. Ensure that no falling material is keeping in height
5. Fall of material & man from height.
elevations.
16. Proper life line arrangements are done.
17. All tools have its safety appliance.
18. Provide guide ropes for avoid unwanted swing of
material.
19 . Tools which are using erection activity is done third
party inspection and a valid test certificates
1. Use specified shielding devices and other PPE of 1.Ensure SWP to be followed.
correct specifications.
2. Avoid thoriated tungsten electrodes for GTAW.
3. Move out any leaking cylinder.
4. Keep trolley for transportation of cylinders and
chain them .
1. Welding radiates invisible 5. Use flashback arrestors.
ultraviolet and infrared rays. 6. Purge regulators immediately and then turn off.
2. Improper placement of 7. Never use grease or oil on oxygen line connections
oxygen and acetylene cylinders. and copper fittings on acetylene lines.
3. Leakage /cuts in hoses. 8. Inspect regularly gas carrying hoses.
4. Opening - up of cylinder. 9. Always use red hose for acetylene and other fuel
5. Welding of tanks, container gases and blue for oxygen.
Gas welding / cutting / 10. Always stand back from regulator while opening
7 R or pipes storing flammable N 1 4 1 4 1 1 0.5 0.5 4
heating. the cylinder.
liquids.
(1. Radiation can damage eyes and 11. Turn valve slowly to avoid bursting.
skin. 12. Cover the lug terminals to prevent short circuiting .
2. Explosion may occur. 13. Empty & purge them before welding.
3. May cause fire. 14. Never attach the ground cable to tanks, container
4. Cylinder may burst. or pipe storing flammable liquids.
) 15. Never use LPG for gas cutting.
1.All workforce have to wear all type of PPEs 1.Ensure SWP to be followed.
1.Cut injury due to tying piano wire 2. Provide an indication on piano wire
2. Struck between materials while 3. Check the hydraulic jack & hydraulic pipes
lifting of base frame 4. Ensure that a valid test certificate is available.
Alignment of Kiln Shell 3. Failure of hydraulic jack. 5. Proper maintenance should be done.
1.Tieing of piano wires & 4. Slipping of material 6. Proper packing should be provide before releasing the
8 R N pressure 1 4 1 4 1 1 0.5 0.5 4
providing packing under (1. Cut injury
the base frame 2. Scratch injury
3. Hit injury
4. series injury
)
• Entire working area shall be free from flammable material. 1.Ensure SWP to be followed.
• Before use, check the physical condition of grinding
machine; ensure that grinding machine must have good
condition guard.
• Grinding machine power cable must have three pin
industrial sockets and connected through RCCB/ELCB.
• Before grinding work check the grinding wheel for expiry
date.
• Grinding operation to be performed by the competent
person only.
• Grinder shall be use all the necessary PPEs like lather
• Fire hazards
apron, glasses apart from mandatory PPEs.
Grinding of MS plates & • Electrical shock
9 R N • Good housekeeping to be maintained in the area. 1 4 3 12 0.5 1 0.5 0.5 4
structural steel. • Crack in grinding wheel
• During grinding, person shall be away from the job.
• Ergonomic Work station shall be provided.
• Only certified grinding machine and its accessories to be
used.
• Correct speed & feed.
Welding machines are kept inside welding booth / rain 1.Ensure SWP to be followed.
protection arrangements
• All welding machine are routed through ELCBs
• Body earthing is done by 8 gauge GI wire
• Welders provided with PPEs (Leather hand gloves, safety
shoes)
• Overlapping of power and welding cable avoided.
Fire hazard • Avoid electrician standing on wet places or with wet
Burn hazard shoes or gloves.
10 Arc Welding R Trip hazard N • Certified electrician 1 4 1 4 1 1 0.5 0.5 4
Electric shock(p) • Ensure surrounding area free from
Inhalation of Smoke/harmful gases(P) • combustible materials
• Providing non conducting mat
• Periodic inspection of power cables
• Usage of signage
• Follow check list
1. Provide guard rails/ barricade at the work place. 1.Ensure SWP to be followed.
2. Use PPE like full body harness, life line, helmets,
safety shoes, etc.
3. Obtain the permit before starting the work at height
above 3m.
4. Fall arrest and safety nets, etc, must be installed.
5. Provide adequate working space (min.0.6m).
6. Tie / weld working platform with fixed support .
7. Use roof top walk ladder while working on a
1. Person can fall down. slopping roofs.
2. Material can fall down 8. Avoid movement on beams.
. May sustain sever injuries or prove 9. Keep the work place neat and clean.
fatal . 10. Remove the scrap immediately.
11 Working at elevated places. R 2. May hit the scrap/ material stacked N 11. Do not throw or drop materials or equipment from 1 4 1 4 1 1 0.5 0.5 4
at the ground or in between. height. i.e. do not bomb materials.
3. May hit the workers working at 12. All tools to be carried in a tool- kit Bag or on
lower levels and prove fatal. working uniform.
13. Remove scrap from the planks.
14. Ensure wearing of helmet by the workers working
at lower levels.
1.Ensure SWP to be followed.
NOTE:-
Exposure :- Severity :- Probability :- Risk:-
1. Only R<20 can result in acceptable s
Very rarely (less then one per year) 0.5 Minor (Injury without time/work restriction - FAC) 1 Virtually Impossible: only theoretical case (once in a life time) 0.2 Risk Score Priority for the R=>20, I
Interpretation(1)
(R) measures to be taken reason should be documented
Rarely (Few time per year) 1 Major (Injury with time/work restriction - MTC RWC) 4 Conceivable but improbable: once in a career (once in 20 Y) 0.5 <20 Very limited risk - acceptable 4
Sometimes (once are twice) per month 2 Serious (Irreversible effect handicap-LWC) 7 Improbable/borderline case (1/10Y) 1 20 - 70 Measures required (in 6m) 3
Unusual,: ( once in 3y) R/NR-Routine/Non Routine
Now and then (Weekly) 3 Critical (One fatality, instantly or afterwards) 15 3 70 - 200 Immediate measures required 2 N/A/E-Normal/Abnormal/Emergency
Disaster (more than one fatality, instantly or Possible (once every six months) S/NS-Significant/Not Significant
Frequently (Daily) 6 afterwards) 40 6 >200 Stop work until measures are taken 1 EMS-Environment Management System
OHS-Occupational Health & Safety
Continuous (More then two times per day) 10 Can be expected (once per week) 10
DOC NO:
REV NO:
PAGE NO:
EFFECTIVE DATE:
Ref
Not Complying legal S/
Doc(SOP/SMP/SW
Requirment(Y/N) NS
P/MP)
<20 can result in acceptable situation.
R=>20, If no action is taken, the
hould be documented
utine/Non Routine
rmal/Abnormal/Emergency
ificant/Not Significant
ronment Management System
upational Health & Safety