Koomey 21st January

2018
Accumulator
Bottle
Isolation
Revision 0
Koomey Accumulator Bottle Isolation

Intentionally Omitted

Doc Number: DOP-PR-R76-080 Page 2 of 5


Koomey Accumulator Bottle Isolation

Issue Rev. Prepared


Date Revised Reviewed By Brief on Revision
No No /Revised By

1 0 21/01/2018 Yannick Sethna Michael Edmondson Initial Issue

Document Authorization

Document Owner Document Custodian Document Author

Micheal Edmondson Waleed Al Harthi Ahmed Al Amri

CEO QA/QC Manager Drilling Superintendent

User Notes:
This document is the property of National Drilling & Services L.L.C. Neither the whole nor any part
of this document may be disclosed to others or reproduced, stored in a retrieval system, or
transmitted in any form by any means (electronic, mechanical, reprographic recording or
otherwise) without prior written consent of Document owner or Custodian.

The requirements of this document are mandatory. Non-compliance shall only be authorized by
Quality department through STEP-OUT approval.

A controlled copy of the current version of this document is available in NDSC document
management system. Before making reference to this document, it is the user's responsibility to
ensure that any hard copy, or electronic copy, is current. For assistance, contact the Document
Custodian.

Users are encouraged to participate in the ongoing improvement of this document by providing
constructive feedback to the Document Custodian. Uncontrolled copies of this document may be
issued to interested parties or customers, subject to the consent of the Document Custodian.

Doc Number: DOP-PR-R76-080 Page 3 of 5


Koomey Accumulator Bottle Isolation

Table of Contents

1. Purpose ........................................................................................................................5
2. Scope ............................................................................................................................5
3. Responsibility...............................................................................................................5
4. Supervision...................................................................................................................5
5. GENERAL SAFETY CONSIDERATIONS...........................................................................5
6. ISOLATION PROCEDURE ..............................................................................................5
7. OPENING THE ACCUMULATOR BOTTLE ......................................................................5

Doc Number: DOP-PR-R76-080 Page 4 of 5


Koomey Accumulator Bottle Isolation

1. Purpose

National Drilling and Service Company LLC (The “Company” or “NDSC”) is committed to
deliver its services in the highest level of operating standards and to perform the job
safely and effectively by providing a quick access of the Drilling Operating Procedures to
its staff.

2. Scope

To provide a safe working procedure for accumulator bottle (Valvcon Closing Unit)
isolation.

3. Responsibility

Chief Mechanic

4. Supervision

ToolPusher

5. GENERAL SAFETY CONSIDERATIONS

This is a non-routine task involving work with high pressure. A formal PTW is to be
completed and approved prior to commencing the isolation.

6. ISOLATION PROCEDURE
 Close, isolation valve on the required accumulator bottle bank
 Switch off the electric and air pump for the accumulator unit.
 Open the bleed off valve. Bleed off all pressure in the bottles for the required bank.

7. OPENING THE ACCUMULATOR BOTTLE


 Open the hexnut cap of the accumulator bottle.
 Remove the small cap for the filling valve.
 Fix the nitrogen pre-charge pressure gauge assembly at the filling valve
 Bleed off all the nitrogen pre-charge to 0.