Method Statement For Installation of HV Switch Gear 11 KV Panels
Following tools shall be used for the installation of HV switchgear of 11 KV. HV Switchgear and accessories shall be in line with the approved
material submittal and approved drawings by authorities and as per rules and standards.
Required Tools:
Fork Lift or Hydraulic Crane, Chain Pulley Block & necessary arrangement in line with the
Manufacturer’s, recommendations and as required at site.
Portable hand tools.
Spirit Level / Level Threads
Torque Wrench
Digital multimeter
10 KV Megger
Earth resistance Tester
On receipt of the HV Switch Gear and accessories at site, necessary precautions shall be
Advertisement taken for
unloading, shifting & storage, as follows:-
1. All Packages for the complete set of 11kv switch gears, reaching to site shall be identified
as per package list.
2. Where auxiliaries are shipped loose, these will be identified and checked against the
dispatch documents. Any item found missing or damaged will be noted to the supplier
immediately for the replacement / repair.
3. Special attention shall be paid to the condition of instruments and monitoring devices
http://safeworkmethodofstatement.com/method-statement-for-installation-of-hv-switch-gear-11-kv-panels/ 1/3
9/30/2017 Method Statement For Installation of HV Switch Gear 11 KV Panels
1. Ensure all civil works are completed for the area including floor paint to carryout the installation, and clearance is obtained from
respective authorities to proceed further.
2. Prior to start the installation, refer to the approved shop drawings related to the area of installation and ensure that required
materials are available at site as per approved material submittals.
3. Ensure the materials are stored properly and there is no mark of damage or deformity of any kind before issuing the material from
site store.
4. Make sure the floor surface is ready with base frames grouted to install the switch gear.
5. Prior to installation, the foundation will be checked for cleanliness, level and base frame surface.
6. The unit will be inspected prior to shifting to site for any mechanical and structural damage during transportation.
7. The name plate will be checked against equipment data sheet to confirm conformity with the approval.
8. Clean the room to facilitate the cubicles to be brought in.
9. HV Switch Gear will be moved by crane or as per manufacturer’s, recommendation and shall be positioned near the HV Switch Gear
Room, HV Switch Gear will be moved over rails or by chain pulley block and brought to the position as indicated in the drawing.
10. To the approved layout drawings, place the cubicles on the base frame.
11. Ensure that the clearances available as per the approved layout drawings.
12. Grout the cubicles with base frame to correct level.
13. The installation will be checked by site electrical supervisor and engineer for proper placement and orientation of HV switch gear.
14. HV side termination shall be carried out as per approved drawings.
15. Connect the earthing bus bar to the earth grid. Earthing shall be done as per Regulation, specification and approved drawing.
16. For DC supply, HV Switch Gear to battery bank to be installed in battery room and connected as per drawing of the HV Switch Gear.
17. Ensure the installation of HV Switch Gear ( 11 KV ) are carried out in accordance with manufacturer’s and authority’s installation
recommendations, requirement of applicable standards and in accordance with recognized industrial practices and specified in
project specification to ensure that installation complies with requirements.
18. After inspection of HV Switchgear and approval by Consultants, proper care will be taken to protect the unit from dust by suitable
covering, and shall further be released for the Testing work.
Attachments
Advertisement
Subscribe
http://safeworkmethodofstatement.com/method-statement-for-installation-of-hv-switch-gear-11-kv-panels/ 2/3
9/30/2017 Method Statement For Installation of HV Switch Gear 11 KV Panels
(http://safeworkmethodofstatement.com/method-statement-for-installation-of-cctv-camera-system/)
Method Statement For Installation Of Steam Boilers
(http://safeworkmethodofstatement.com/method-statement-for-installation-of-steam-boilers/)
Share 6 Share
Previous: Method of Statement for Installation Next: Method Statement For Installation of
and Termination of LV Cables & Wires Building Management System BMS Including Field
(http://safeworkmethodofstatement.com/metho Devices
d-of-statement-for-installation-and- (http://safeworkmethodofstatement.com/metho
termination-of-lv-cables-wires/) d-statement-for-installation-of-building-
management-system-bms-including-field-
devices/)
http://safeworkmethodofstatement.com/method-statement-for-installation-of-hv-switch-gear-11-kv-panels/ 3/3