Professional Documents
Culture Documents
Clay: Chlorite1 · Dickite · Halloysite · Illite · Ilmenite · Kaolinite · Montmorillonite/Smectite · Nacrite · Nontronite
Mica: Biotite · Glauconite · Lepidolite · Margarite · Muscovite · Phlogopite
Zeolite: Aluminosilicate mineral, Na2Al2Si3O10-2H2O (natrolite)
Anhydrous carbonates
Malachite
Ikaite CaCO3.6(H2O)
Lansfordite MgCO3·5(H2O)
Monohydrocalcite CaCO3.H2O
Natron Na2CO3·10(H2O)
Zellerite Ca(UO2)(CO3)2·5(H2O)
NaOH Neutralization, lb Na2CO3 Soda Ash netralization, lb 5.00
gr lb mol gr lb NaOH Neutralization, lb
41.69 0.09 0.52 55.23 0.12 Linear (NaOH Neutralization, lb)
4.50
Na2CO3 Soda Ash netralization, l
126.29 0.28 1.58 167.33 0.37 Linear (Na2CO3 Soda Ash
212.58 0.47 2.66 281.65 0.62 4.00 netralization, lb)
300.57 0.66 3.76 398.24 0.88
435.61 0.96 5.45 577.16 1.27 3.50
527.71 1.16 6.60 699.19 1.54
668.91 1.47 8.36 886.27 1.95 3.00
912.87 2.01 11.41 1209.50 2.67
1167.95 2.57 14.60 1547.47 3.41 2.50
1434.52 3.16 17.93 1900.66 4.19
1543.69 3.40 19.30 2045.32 4.51 2.00
Lb NaOH = 0,1069x%HCl - 0,0774 Lb Na2CO3=0,1416x%HCl - 0,1026
1.50
1.00
0.50
gal
% --- konsentrasi yang diinginkan 0.00
0 5 10 15
lb
lb
lb
lb -- kebutuhan untuk menetralisasi volume acid di atas
lb -- kebutuhan untuk menetralisasi volume acid di atas
1.1
1.05
0.95
0.9
5 10 15 20 25 30 35
Simple Acid Treatment
X-Sand development
Well Data
Perforations :
Top Bottom Length Porosity
Net 26 ft
Gross 26 ft
Treatment Intv 26 ft
OH Size : 9 3/5 inch 3.76 gal/ft
BHST : 180 degree F
BHP : 370 psi
Frac Gradient 0.5 psi/ft (Estimate) 1191 psi 2382
Hydrostatic 1100 psi
(Note : prior
to pumping
all depths
should be
confirmed as
well as
tubular sizes
and
displacemen
t volumes)
(Note : Have CCL log on location. Do not set Packer or RBP at Casing collar depths.)
(Note : Pressure test Packer and RBP before any pumping into formation)
5 of 9
2. RIH RBP
and EA
Packer with
Bypass
Valve on
new 3 ½”
9.3# tubing.
Set RBP and
packer
above 2300
ft in blank
casing and
pressure
test them.
3. R/U
Dowell.
Conduct a
pre-job
safety and
procedure
meeting
with all
personnel
prior to
mixing acid
and pressure
testing.
4. Prime up
pumps with
3% NH4CL
water and
pressure
test treating
lines to 3000
psi for 5
minutes.
6. Open
BOP and
Pump 10
bbls
TubeCLEAN
at 1 bpm.
Displace it
with 3%
NH4CL
water at 1
bpm down
to 2 bbls
above the
Bypass
Valve.
Immediately
close BOP &
reverse out
2 tubing
volume with
rig pump
with EOR
water to a
disposal
tank.
6 of 9
Bypass
Valve open
and Displace
fluid in the
tubing with
3% NH4CL.
Close
Bypass
Valve. Unset
Packer and
RBP.
10. Perform
Injectivity
test with 3%
NH4CL. Keep
the pressure
less than
frac
pressure
(Est.
Frac.G.= 0.5
psi/ft).
Record rate
vs. pressure
and decide
injection
rate.
12. R/U swab tool immediately and swab all the acids 180
Fluid Requirements
7 of 9
1/6 Gravel Size
Gravel size, mesh Gravel size, in Gravel size, mm Formation sand, in Formation sand, mm
6 12 0.132 0.066 3.353 0.022 0.011 0.558833
8 16 0.094 0.047 2.388 0.015667 0.007833 0.398
12 20 0.066 0.033 1.676 0.011 0.0055 0.279333
16 30 0.047 0.023 1.194 0.007833 0.003833 0.199
20 40 0.033 0.017 0.838 0.0055 0.002833 0.139667
30 50 0.023 0.012 0.584 0.003833 0.002 0.097333
40 70 0.017 0.008 0.432 0.002833 0.001333 0.072
ppa prop, lb/gal liq, gal/gal Slurry, ppg prop, gal Yield
0.0 0.00 1.00 0.81 0 1.00
0.5 0.49 0.98 0.85 0.022172 1.02
1.0 0.96 0.96 0.89 0.043439 1.05
1.5 1.40 0.94 0.93 0.063348 1.07
2.0 1.83 0.92 0.96 0.082805 1.09
2.5 2.25 0.90 1.00 0.10181 1.11
3.0 2.64 0.88 1.03 0.119457 1.14
3.5 3.02 0.86 1.06 0.136652 1.16
4.0 3.39 0.85 1.09 0.153394 1.18
4.5 3.74 0.83 1.12 0.169231 1.20
5.0 4.08 0.82 1.15 0.184615 1.23
5.5 4.40 0.80 1.18 0.199095 1.25
6.0 4.72 0.79 1.20 0.213575 1.27
6.5 5.02 0.77 1.23 0.227149 1.29
7.0 5.32 0.76 1.25 0.240724 1.32
7.5 5.60 0.75 1.28 0.253394 1.34
8.0 5.87 0.73 1.30 0.265611 1.36
8.5 6.14 0.72 1.32 0.277828 1.38
9.0 6.40 0.71 1.34 0.289593 1.41
9.5 6.65 0.70 1.36 0.300905 1.43
10.0 6.89 0.69 1.38 0.311765 1.45
10.5 7.12 0.68 1.40 0.322172 1.48
11.0 7.35 0.67 1.42 0.332579 1.50
11.5 7.57 0.66 1.44 0.342534 1.52
12.0 7.78 0.65 1.46 0.352036 1.54
12.5 7.99 0.64 1.47 0.361538 1.57
13.0 8.19 0.63 1.49 0.370588 1.59
13.5 8.38 0.62 1.51 0.379186 1.61
14.0 8.57 0.61 1.52 0.387783 1.63
Gravel Size
Formation sand, mm
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3000
0.75
2250 1299.48
1000
1950.52
956.1373