PPT - Training of Trainers-Final - 27.09.18 PDF
PPT - Training of Trainers-Final - 27.09.18 PDF
1
Student Solar Ambassadors
Workshop
on
2nd October 2018
Sensitization video
3
Overall Plan
1 Day
29 Indian States
100,000+ Students across India to
receive Solar lamps
Pan- India Event
1,00,000 students
29 states
800+ Volunteers
Light
Energy
Thermal
Energy
18
Applications of Solar Energy
Thermal Energy Light Energy
19
Working Principle of SoUL
1. Solar Energy
6. Electric Energy
Solar Panel P.C.B. gets converted into
DC Circuit. light energy
Switch
2. Solar Load LED
Energy gets LED
converted Indicator
into electric
energy
4. Electric 5. Chemical
3. DC Current Energy gets Load Wire Energy gets
converted converted
into chemical into electric
energy energy
20
Technical Session
What is SoUL Kit and Tool Kit?
Physical
Components of SoUL Kit
Components
Technical
Components
24
Physical components of SoUL Kit
28
Physical Testing of Components
Physical Testing (1/6)
Base top
1.Check for any scratches or breakage
2.Check all the screw mounting holes and
switch/indicator LED/gooseneck
mounting points
Base bottom
1.Check for any scratches or breakage
2.Check all the screw mounting holes and
the slots provided for battery and slot for
DC jack
30
Physical Testing (2/6)
LED cap
1.Check for any scratches or breakage
2.Check the mounting points for load LED and
screw
3.Check the opening for gooseneck
31
Physical Testing (3/6)
Reflector
1. Check for any scratches or breakage
2. Check the screw fixing point
Gooseneck
1. Check that there are no cuts anywhere.
2. Check that the gooseneck is neither too flexible
nor too tight
3. Blow from one end of the gooseneck and observe
the whistling sound
4. Check if the length of the gooseneck is 1 feet
32
Physical Testing (4/6)
Load Wire
1. Check that both the wires are not cut from
anywhere
2. Check that the wire connector is connected
firmly to the load wire
3. Check that the wire length is 17 inches
Load LED
1. Check that there is no breakage or scratch on
the LED strip
2. Both the terminals should have solder pads
3. It should have a +ve and -ve marking
33
Physical Testing (5/6)
Battery
1. Check that the wire connector is
connected to the terminal wires firmly
2. Check that both the wires are not cut
from anywhere
3. Check that the plastic sleeve of the
battery is not torn
4. Following details
• name of the manufacturer
• battery chemistry (LiFePO4),
• operating voltage (V)
• battery capacity (mAh)
• manufacturing year
34
Physical Testing (6/6)
PCB ( Printed circuit board)
1. Check that there is no breakage
2. Press the switch repeatedly and check that it
does not get stuck while pressing
3. All three legs of indicator LED are soldered
properly
4. Check that the DC socket is properly soldered
5. Check that all the connectors are soldered
properly to the PCB
Solar Panel
1. Check that there are no scratches or breakage
in the glass, frame, junction box, or body of the
panel.
2. Check that there is no cut in the panel wire
3. Check that the connector pin is not damaged
4. Check that the wire length is 2.5 meters
35
Introduction to Tool Kit
36
Components of Tool Kit
Probes Multimeter
Black(-) Red(+)
Knob setting for
voltage
measurement(20A)
Current Voltage
measurement measurement
port Common port
Note: Different models of multimeter may have different specifications and settings.
Please refer to the operation manual of the respective multimeters.
Introduction to Testing Jig
Solar input
Led input
Solar panel
Supply connector
Discharge
Technical Testing of Components
Sr Technical
Specification / Criteria Picture
No component
Maximum power, (Pmp) 2.5Wp
Maximum power voltage, (Vmp) 4.90V
1 Solar Panel Open circuit voltage (no-load), (Voc) 6.0V
Current on maximum power, Imp 510mA or 0.51A
Short circuit current (no-load), Isc 540mA or 0.54A
Rechargeable LiFePO4 (Lithium ferrous phosphate)
2000mAh (Ability)
2 Battery 3.6V (Maximum voltage)
3.2V (Terminal voltage)
3.0V (Minimum voltage)
Teflon coated
4 Load Wire
Length = 17 Inch
43
Information on Solar Panels
Company's
name
Power
Voltage
Current
44
Precautions in testing Solar Panel
45
Technical Testing: Solar Panel
Solar Panel
Test
46
Availability of Testing Jig
Without Testing Jig (click here to go to slide 42 if testing jig is not available)
47
Without Testing Jig
Solar panel 'Voc' test
If the testing jig is not available,
you can test the Voltage of a
solar panel as seen in the figure:
Steps:
1) Connect the probes as shown
in the image:
- Black probe in COM
- Red probe in VΩ
2) Set the knob pointer at 20V.
3) Insert the red probe in the
solar panel DC Pin and place
the black probe on the outer
metal contact of the pin as
shown in the figure.
4) Voltage should be> 5V
49
Solar Panel 'Current (Isc)' test
If the testing jig is not available,
you can measure the current of
solar panel as shown in the
figure
Steps:
1) Connect the probes as shown
in the image:
- Black probe in COM
- Red Probe in A
2) Set the knob pointer at 10A
3) Insert the red probe in the
solar panel DC Pin and place
the black probe on the outer
metal contact of the pin as
shown in the figure.
4) Current should be> 0A
50
Battery Voltage Test
• Rechargeable LiFePO4 (Lithium ferrous phosphate)
• 2000 mAh (capacity)
• 3.2 V (Operating voltage)
• Acceptable battery voltage≥ 3.2V
51
Terminal Voltage Test
If the testing jig is not available,
you can measure the voltage of
the battery as shown in the
figure:
Steps:
1) Connect the probes as shown in
the image:
- Black probe in COM
- Red probe in VΩ
2) Set the knob pointer at 20V
3) Connect the multimeter pins to the
battery slots as shown in the figure
4) Measure voltage in multimeter.
5) Voltage should be≥ 3.2 V
Note: The multimeter probes should
not touch with each other.
52
Load LED testing
• No test required if testing jig not available
• Light emitting diode (LED)
• Power – 1W
53
Load Wire Test
• Length-17 inch; Teflon coated
• Black - negative (-ve); Red - positive (+ve)
54
Load Wire Continuity Test
55
PCB Testing
• PCB–Printed circuit board
• Indicator LED test (charging, discharge and full charge)
• DC socket test
Indicator LED
56
PCB testing
LED testing
If testing Jig is not
available:
Steps
1) Connect the Battery at
the battery slot in the PCB
2) Connect the solar panel
to the DC socket of PCB as
shown in the figure
3) Place the solar panel in
bright sunlight
57
With Testing Jig
Solar panel 'Voc' test
Steps:
Set the knob 1) Connect the probes as
at 20 V shown in the image:
- Black probe in COM
- Red probe in VΩ
2) Set the knob pointer at
20V
3) Connect the multimeter
pins to the “Multimeter” port
in the testing jig as shown.
4) Connect DC pin of the
solar panel to the “Solar
Panel” port in the testing jig
as shown.
Ideal probe
5) Measure voltage in
connections multimeter by placing the
solar panel in bright sunlight.
6) Voltage should be> 5V
59
Solar Panel 'Current (Isc)' test
Steps:
Set the knob 1) Connect the probes as shown
at 10A in the image:
- Black probe in COM
- Red Probe in A
2) Set the knob pointer at 10A
3) Connect the multimeter pins
to the “Multimeter” port in the
testing jig as shown
4) Connect DC pin of the solar
panel to “Solar Panel” port in the
Ideal probe testing jig as shown
connections
5) Measure current in multimeter,
by placing the solar panel in
bright sunlight.
6) Current should be> 0A
60
Battery Voltage Test
• Rechargeable LiFePO4 (Lithium ferrous phosphate)
• 2000 mAh (capacity)
• 3.2 V (Operating voltage)
• Acceptable battery voltage≥ 3.2V
61
Terminal Voltage Test
62
Load LED testing
• Light emitting diode (LED)
• Power – 1W
63
LED testing
LED
LED
Input
Testing jig
Battery
64
Load Wire Test
• Length-17 inch; Teflon coated
• Black - negative (-ve); Red - positive (+ve)
65
Load Wire Continuity Test
66
PCB Testing
• PCB–Printed circuit board
• Indicator LED test (charging, discharge and full charge)
• DC socket test
Indicator LED
67
Test of ‘Indicator LED’- Full Charge
Battery full charge
indicator
Solar Input 1) Connect the Battery
at the Supply Point on
the testing jig
2) Connect “Full
Charge” connector
from the testing jig to
the PCB
3) Connect “Solar
Input” pin of the
testing jig to the PCB
4) Indicator LED glows
constantly green if the
Full Charge Testing Zig
Full charge Indicator
LED is working fine
Battery
68
Test of ‘Indicator LED’- Discharge
Battery discharge
indicator
1) Connect the Battery
at the Supply Point on
the testing jig
2)Connect “Discharge”
connector from the
Discharge testing jig to the PCB.
3) Press the switch on
PCB, the indicator LED
will blink red once
Testing Zig
Battery
69
Test of ‘Indicator LED’- Charging
Solar Battery charging
indicator
Input 1) Connect the Battery at
the Supply Point on the
testing jig
2) Connect “Charging”
connector from the
testing jig to the PCB
3) Connect “Solar Input”
pin of the testing jig to the
PCB
4) If the Indicator LED
Testing Zig blinks green light, the
‘Indicator LED’ charging
is fine
Battery Charging
70
Test of Switch
71
Important Guidelines
First-aid box should be Glue should not fall on any Wait till the glue gets dried
present in the training venues other part of the lamp
Do not inhale the Do not put excess force Do not put excess force Always keep the
smoke of the soldering while screwing while screwing soldering iron on the
soldering stand
72
Screws in Lamp
Total screws in the lamp: 7
3 Small
To fix PCB to the base Big Screw
2 screw (4.5
bottom
mm)
Total 7 screws
73
Steps to
Assemble
the Solar Study Lamp
Phase- 1/19
77
Phase- 4/19
Note:
Take precaution
while applying the
glue, as the glue may
splash out and fall on
the hands of the
assembler.
78
Phase- 5/19
81
Phase- 8/19
90
Phase- 17/19
91
Phase- 18/19
92
Phase- 19/19
93
Lamp Test
Low Mode and High Mode
94
Seal Sticker
How much do
Sticker Name Where to put it?
you have?
To be added on base
Seal sticker bottom and base top 1
behind gooseneck
95
SoUL Packaging
96
Items in Soul box and Panel box
97
Put the solar panel in the box
98
Packaging
99
Pledging Non-Violence to Environment
International Day of Non-violence
2nd October 2018
Today on International Day of Non Violence I humbly stand
here, with a solemn pledge: