You are on page 1of 1

e

A B C A B C ck
stoaor
pip

soil fl
vc nd
7500 . pGrou
septic 4500 3000 4500 3000
ia
4"fdrom SPECIFICATION :
tank 2500 3000 1500 4"dia. pvc soil stack pipe
4"dia. pvc soil pipe from Ground floor
1 sh
c.o
1 fd c.o
1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE
PHILIPPINE PLUMBING CODE AND WITH THE LOCAL SANITARY AGENCY.
lav wc sh fd sh wc lav

1500

1800

1800
fd wc
2. ALL MATERIALS TO BE USED SHALL BE OF BRAND NEW AND OF APPROVED TYPE FOR
lav LOCATION AND PURPOSE.
c.o
4000

4000
sink 3. USE SANIMOLD BY MOLDEX PRODUCTS FOR SANITARY WASTE SYSTEM.
4. ALL CLEAR WATER SUPPLY SYSTEM SHALL BE OF PVC PIPES, SCHEDULE 40, MOLDEX BLUE.

3500
800 DN 5. MAIN WATER SUPPLY PIPES MUST BE 1" diameter AND BRANCH SUPPLY PIPES MUST BE
1/2" diameter PVC PIPES.
2 2
8000

UP
1000 1000 6. SEPTIC VAULT SHALL BE WATER TIGHT. COMPLETE WITH THE NECESSARY REQUIREMENTS
OF A TYPICAL APPROVED TANK.
7. ALL WORKS HEREIN SHALL BE DONE OF CLASS A WORKMANSHIP, PIPING SYSTEM MUST BE

3000
c.o DOUBLE CHECKED TO ENSURE WATER TIGHT PLUMBING SYSTEM.
4000

4000
sh 8. ALL WORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
er wc fd LICENSED MASTER PLUMBER.
ris
lav

5000
DN
IP E
3 3 tic "∅
PV
CP
PLUMBING LEGEND:
septank 1/2
1200

1200
2000
CV CHECK VALVE
k
LAV LAVATORY
sin F FAUCET
WC WATER CLOSET
E IP
CP
UP
V
∅P "
UR URINAL WM WATER METER
1 GROUND FLOOR SANITARY LAYOUT 2 SECOND FLOOR SANITARY LAYOUT 1/2
HB HOSE BIBB
P-1 P-1 FD FLOOR DRAIN
CO CLEAN-OUT RD ROOF DRAIN
A B C A B C CV FCO FLOOR CLEAN-OUT CB CATCH BASIN
7500 GV
4500 3000 4500 3000
M
VS VENT STACK DS DOWNSPOUT
riser
2500 3000 1500
riser VSTR VENT STACK THRU ROOF G.I.P. GALVANIZED IRON PIPE
1 1
1/2"∅ PVC PIPE

lav wc
sh
sh fd 1/2"∅ PVC PIPE
3 ISOMETRIC LAYOUT GV GATE VALVE
1500

fd wc
2500
lav P-1
1/2"∅ PVC PIPE
4000

4000

3500
596 596
3500

2000 1500
800 MANHOLE MANHOLE

2 2 500 500
8000

1000
UP 1425 500 500
AIR SPACE AIR SPACE
INLET

3000

50
OUTLET
4000

4000

WATER LEVEL
WATER LEVEL

12mmØ VERTICAL BARS SPACED @


5000

DN
1000
400mm ON CENTERS

3 3

2500
1200

1200

CV
DIGESTIVE LEACHING
2000

2500
586

500
MANHOLE MANHOLE
C.O. OUTLET
GV INLET
CHAMBER CHAMBER
M
6" THICK CHB

4 GROUND FLOOR WATERLINE LAYOUT 5 SECOND FLOOR WATERLINE LAYOUT 12mmØ HORIZONTAL BARS PLACED

P-1 P-1 EVERY 2 LAYERS OF CHB

FIN. LINE GRADE MIN. SLOPE, 1:10


PVC CLEANOUT PLUG
POURED CONCRETE PAD

200

250
FIN. WALL LINE
PVC CLEANOUT PLUG PVC 1/8 BEND

PVC 1/8 BEND PVC WYE FITTING 11-12mmØ MATTING BARS SPACED
EQUALLY AS SHOWN
3-12mm.Ø HORIZONTAL
400
2075 TEMPERATURE BARS
12mm.Ø RSB MATTING
SPACED AS SHOWN 13-12mm.Ø MATTING BARS SPACED 12mmØ MATTING BARS SPACED @
EQUALLY 400mm ON CENTERS

6 SEPTIC TANK PLAN


P-1 7 SEPTIC TANK SECTION
AT GRADE CLEAN OUT DETAIL AT WALL P-1

RHODALYN E. VIRAY PROPOSE TWO STOREY RESIDENCE GROUND FLOOR SANITARY LAYOUT SECOND FLOOR WATERLINE LAYOUT
EARL T. LAYUGAN ENGR. AUGOSTO FRACE SECOND FLOOR SANITARY LAYOUT SEPTIC TANK PLAN P
JEROME Q. ADDURU ISOMETRIC LAYOUT SEPTIC TANK SECTION
KARL BEEJAY FAJARDO ALIBAGU, ILAGAN, ISABELA
GROUND FLOOR WATERLINE LAYOUT 1