GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS

STUDY REPORT
ON
COLLECTION OF DATA
ON
BLANKET MATERIALS
(From year 2002 to year 2004)

Report No. GE-77


(This report is further investigation to study on the subject
conveyed vide “ State of the art report on quality of blanket
material on railway formations, no. GE-37, May-2001” for the
period from 2000 to 2001)

NOVEMBER-2005
GEO-TECHNICAL ENGINEERING DIRECTORATE
RESEARCH DESIGNS AND STANDARDS ORGANISATION
LUCKNOW-226011
PREFACE

This report is prepared on the basis of soil and blanket test results
of the samples collected from various construction projects of Indian
Railway and tested at Geotechnical Engineering Laboratory, RDSO,
Lucknow. Views expressed in this report are based on the test results of
soil and blanket samples for different locations of all over Indian
Railway.

(Nand Kishore)
Executive Director/Geotech. Engg,

November, 2005
RDSO, Lucknow
CONTENTS

S. No. Description Page No.

1 Introduction 1
2 Scope of the study 1

3 Specifications for blanket material 1-2

4 Quality control of blanket material at site 2

5 Laying, spreading and compaction of blanket 3

6 Details of blanket test results tested at GE 3


Laboratory
7 Conclusion 4-5

8 References 5

Figures
I Graph showing the different enveloping curves 6
for blanket material
II-III Sample curves for blanket lying within 7-8
enveloping curves for blanket material
IV-V Sample curves for blanket not lying within 9-10
enveloping curves for blanket material
Annexure

Location wise summary of blanket samples


I 11-17
conforming to specifications
Location wise summary of blanket samples
II 18-27
conforming to thickness
Test Results of blanket samples tested in
III 28-55
G.E.Laboratory, RDSO

0
STUDY REPORT ON COLLECTION OF DATA
ON BLANKET MATERIALS

1.0 INTRODUCTION

To avoid failure of track formation due to inadequate bearing capacity


and to safeguard against swelling, shrinking and mud pumping of
formation, the blanket material has a significant role over subgrade. In
construction of formation for new lines, the provision of blanket over
subgrade has been made compulsory. The thickness of blanket depends
on the type of soil used in earthwork. Similarly, in the case of unstable
formation in existing lines, the blanket is used for rehabilitation. The
performance at field in providing the blanket material to suitable
specification is far from satisfactory, which was concluded from the
report GE-37 prepared during year May-2001 by testing soil samples up
to 2001.

2.0 SCOPE OF THE STUDY

The scope of the study of this report is to compile data on blanket


material collected and tested by RDSO from year 2002 to 2004 to assess
the adaptation of the specifications by field.

3.0 SPECIFICATIONS FOR BLANKET MATERIAL

Blanket material should generally conform to following specifications: -

(a) It should be coarse, granular and well graded.


(b) Skip graded material is not permissible.
(c) Non-plastic fines (Particles of size less than 75 micron) are limited
to maximum to 12% where as plastic fines are limited upto
maximum 5%.
(d) The particles size distribution curve of blanket material should lie
within the enveloping curves of blanket material.
(e) Its uniformity coefficient, Cu (D60/D10) should be greater than 4
preferably above 7.
(f) Its coefficient of curvature, Cc (D302 / D60xD10) should be within1
& 3.
(g) The material for upper blanket layer shall be well-graded sandy
gravel or crushed rock within the enveloping curves for upper

1
4.0 QUALITY CONTROL OF BLANKET AT SITE

Quality control of blanket at site is necessary to ensure better quality of


earthwork. Some of the important points for quality control of blanket are
given as following: -

(i) Quality of blanket material at site should conform to specifications for


blanket material.
(ii) Minimum one test per 500 cum or part thereof should be conducted at
site.
(iii) The blanket material which contains fines passing 75 micron I.S.sieve,
upto 5% should have Density Index (Relative Density) a minimum of
70% as obtained in accordance with IS:2720 (Part-XXIV)- 1983.
(iv) For other materials, field dry density should not be less than maximum
attainable dry density obtained in field compaction trials. However, in
field compaction trial, the maximum attainable dry density should not be
less than 98% of MDD values as obtained by Heavy Compaction Test
(I.S.: 2720 –Part VIII-1983) in the laboratory.
(v) Blanket material should be tested as per IS:2720 (Part-IV) to plot particle
size distribution curve so as to assess its suitability. It would be necessary
to carry out wet analysis to assess actual percentage of fines. To expedite
testing work, dry sieve analysis is not significant and adequate margin
exists with respect to acceptance criteria. However, in such cases also,
wet analysis has to be carried out at frequent intervals to verify the extent
variation. In any situation, acceptance of blanket material would be based
on wet analysis only. The sample for wet analysis should be prepared as
per para 4.3 of IS: 2720 (Part-IV).
(vi) For measurement of field dry density and optimum moisture content of
blanket layer, the following methods can be adopted as per requirements
at site: -

1. Sand replacement method- may be adopted for all types of


materials

2. Core cutter method- for material in which core cutter can be


penetrated and material retained fully after core cutter is taken out.

3. Nuclear moisture density gauge- may be used for measurement of


density and moisture content.

2
5.0 LAYING, SPREADING AND COMPACTION OF BLANKET

(i) The blanket material should be transported wet after mixing water in
order to achieve OMC, in tippers for direct unloading on formation.
Water may also be sprinkled after spreading of dry blanket on sub grade
near OMC.

(ii) The blanket material may be spread with a tractor mounted grader or a
paver finisher in layer of uniform thickness before allowing compaction

(iii) Compaction to specified levels of Relative Density or percentage of


MDD will be carried out through a number of passes of vibratory rollers
of 100-120 KN or more static weight or equivalent capacity. The required
number of passes of vibratory rollers to achieve the desired density at site
should be decided after field compaction trials before compaction at site.
The speed of the roller should not exceed 5 km/h during compaction of
blanket.

(iv) Rolling is to be carried out in layers of not more than 300 mm each
following the same camber profile as provided in the sub grade layer and
to be maintained upto the top layer.

(v) The edges and sides of embankment should be hand rammed with a
suitable rammer.

(vi) Proper control of moisture is required to optimize the compaction effort.


Optimum moisture content may be established through Modified Proctor
Density Apparatus (IS:2720, Part-VIII) and moisture may be added by
sprinkling at the plant or at site as per the requirement.

6.0 DETAILS OF BLANKET TEST RESULTS TESTED AT GE


LABORATORY

Summary of blanket test results is given in Annexure-I & II.

The results of the test reports of G. E. Laboratory of blanket material at


various new line/doubling project sites which were executed in year 2002,
2003 and 2004 have been analysed and following conclusions are drawn :-

3
7.0. CONCLUSIONS

1. From the summary of blanket test results, it is observed that most of the
samples of blanket collected from the field are not satisfying the
specifications of blanket material. The following table gives the position of
samples with respect to specifications: -

Year Total No. of Samples Samples not


no. of locations/pro conforming to conforming to
blanket jects where specifications specifications
samples blanket (%) (%)
tested provided
2002 69 15 42 58
2003 258 42 24 76
2004 155 36 21 79

It can be seen that the samples not conforming to specification are as high
as 79% during year 2004 &2003.

S. Year Samples not No. of Locations/


No. conforming to locations/ projects conforming
specifications (%) projects to specifications
1 2002 75-100 7
50-75 4 Nil
<50 4
2 2003 75-100 26
50-75 10 3
<50 3
3 2004 75-100 25
50-75 7 3
<50 1

The details of data as given in Annexure-II has been summarised in the


above table. It can be seen that the locations/projects where blanket has
been provided as per the specification are in miniscule proportion. In large
number of projects all samples have failed in conforming the
specifications.

The summary of projects where lesser thickness of blanket provided is


given below: -

4
Year No.of Locations where Locations where
locations thickness of blanket thickness of blanket
where provided conforming to provided not conforming
blanket specification to specification
provided
Number Percentage Number Percentage

2002 15 5 33.33 10 66.67


2003 42 11 26.19 31 73.81
2004 36 14 38.89 22 61.11

The thickness of blanket material to be spread on the sub grade depends on


the type of sub grade soil. As per the above table in many projects the
thickness of the blanket layer provided is less than the specified thickness.

3. Uniformity coefficients (Cu) and coefficient of curvature (Cc) values for


few samples are not lying within limits. Most of the deviations have been
observed in Cc values, which are less than 1.

Therefore, emphasis should be given to lay the blanket layer with


suitable material and it should be laid to specified thickness to avoid future
formation troubles. Blanket material of suitable specification can be
obtained by blending different materials at crushers in suitable proportions.
Though materials produced by crushers are costlier, yet they are generally
found satisfying the specifications of blanket. Strict quality control is
required during blending of the natural materials so that fines can be
controlled within limits. This will lead to trouble free new formations and
the rehabilitated unstable formations.

8.0. REFERENCES

(i) Reports of blanket samples tested in GE Lab from 2002 to 2004.


(ii) State of the art report on quality of blanket material on railway
formations, Report No.GE-37, May-2001.
(iii) State of the art report on provision of blanket on railway formations,
Report No. GE-35, Dec -2000.

5
Figure- I

Graph showing the different enveloping curves for blanket material

6
FIGURE-II

Grain Size Analysis curve for Blanket Material

Name of Project : AKRA- NEW ALIPORE DOUBLING E .Railway.

Sample No. : 02/ER/0589 Date : 03/01/2003

Weight of soil in g = 200

Sieve No. in mm Cumulative of soil retained Cumulative wt. of soil passing Cumulative % finer than
on each sieve in g through sieve in g
20 0 200 100.00
10 0 200 100.00
4.75 2.72 197.28 98.64
2 41.70 158.30 79.15
0.6 119.40 80.60 40.30
0.425 127.3 72.7 36.35
0.212 158.10 41.90 20.95
0.075 182.90 17.10 8.55

PARTICLE SIZE DISTRIBUTION CURVE


100
90
CUMMULATIVE %AGE

80
70
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10 100
PARTICLE SIZE ( ON LOG )

Percentage passing
Gravel Sand Silt Clay 75 micron
1 90.1 9 0 9

D10 = 0.090 CU = 12.22


D30 = 0.32 CC = 1.03
D60 = 1.10

7
FIGURE-III

Grain Size Analysis Test Data for Blanket Material

Name of Project : AKRA- NEW ALIPORE DOUBLING E .Railway.

Sample No. : 02/ER/0590 Date : 03/01/2003

Weight of soil in g = 200

Sieve No. in mm Cumulative weight of soil Cumulative weight of soil Cumulative % finer than
retained on each sieve in g passing through sieve in g
20 0 200 100.00
10 0 200 100.00
4.75 6.1 193.90 96.95
2 18.70 181.30 90.65
0.6 101.90 98.10 49.05
0.425 112.2 87.8 43.90
0.212 152.20 47.80 23.90
0.075 181.40 18.60 9.30

PARTICLE SIZE DISTRIBUTION CURVE


100
90
CUMMULATIVE %AGE

80
70
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10 100
PARTICLE SIZE ( ON LOG )

Percentage passing
Gravel Sand Silt Clay 75 micron
3 88.0 9 0 9

D10 = 0.080 CU = 10.25


D30 = 0.27 CC = 1.11
D60 = 0.82

8
FIGURE-IV

Grain Size Analysis Test Data for Blanket Material

Name of Project : GAUGE CONVERSION BET. NJP-APDJ, N.F.RAILWAY

Sample No. : 02/NFR/0645 Date : 12/03/2003

Weight of soil in g = 200

Sieve No. in mm Cumulative weight of soil Cumulative weight of soil Cumulative % finer than
retained on each sieve in g passing through sieve in g
20 15.63 184.37 92.19
10 38.44 161.56 80.78
4.75 54.33 145.67 72.84
2 68.15 131.85 65.93
0.6 93.95 106.05 53.03
0.425 100.21 99.79 49.90
0.212 145.23 54.77 27.39
0.075 166.39 33.61 16.81

PARTICLE SIZE DISTRIBUTION CURVE


100
90
CUMMULATIVE %AGE

80
70
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10 100
PARTICLE SIZE ( ON LOG )

Percentage passing
Gravel Sand Silt Clay 75 micron
27 56.0 17 0 17

D10 = 0.080 CU = 25.00


D30 = 0.32 CC = 0.64
D60 = 2.00

9
FIGURE-V

Grain Size Analysis Test Data for Blanket Material

Name of Project : GAUGE CONVERSION BET. NJP-APDJ, N.F.RAILWAY

Sample No. : 02/NFR/0646 Date : 12/03/2003

Weight of soil in g = 200

Sieve No. in mm Cumulative weight of soil Cumulative weight of soil Cumulative % finer than
retained on each sieve in g passing through sieve in g
20 0 200 100.00
10 9.51 190.49 95.25
4.75 22.69 177.31 88.66
2 44.55 155.45 77.73
0.6 80.59 119.41 59.71
0.425 86.71 113.29 56.65
0.212 142.31 57.69 28.85
0.075 167.89 32.11 16.06

PARTICLE SIZE DISTRIBUTION CURVE


100
90
CUMMULATIVE %AGE

80
70
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10 100
PARTICLE SIZE ( ON LOG )

Percentage passing
Gravel Sand Silt Clay 75 micron
11 72.6 16 0 16

D10 = 0.050 CU = 12.00


D30 = 0.20 CC = 1.33
D60 = 0.60

10
ANNEXURE-I

Summary of samples of Blanket Material tested in RDSO in year 2002

S. Rail No. of No. of No. of samples Samples not


No way Name of Project samples samples not conforming to
. tested conforming conforming to specifications
to specifications (%)
specification
s
I. EASTERN RAILWAY
1 ER Ara-Sasaram new line 2 1 1 50
2 ER Akra-New Alipore 6 5 1 17
doubling
3 ER Gurap-Saktigarh 3 2 1 33
section
II. NORTHEAST FRONTIER RAILWAY
1 NF NJP-SGUJ-NBQ 4 - 4 100
section
2 NF NJP-APDJ section 7 - 7 100
III. NORTHERN RAILWAY
1 NR Jammu-Udhampur rail 2 - 2 100
link
2 NR Amroha-Kankathar 4 3 1 25
doubling
3 NR Udhampur-Katra new 12 8 4 50
line
4 NR Moradabad-Amroha 3 1 2 67
doubling
5 NR Hamirpur quarry 3 2 1 33
material
IV. SOUTH CENTRAL RAILWAY
1 SC Gudur-Renigunta 4 2 2 50
doubling
V. SOUTH EASTERN RAILWAY
1 SE Sambalpur-Talchar 2 - 2 100
bye- pass line
2 SE Bhilai-Sarona IIIrd line 3 2 1 33
3 SE Champa-Bolpur Bye- 2 - 2 100
pass line
4 SE Korba-Gevra Road new 2 - 2 100
line
5 SE Bankra-Nayabaz- 2 - 2 100
Baltikuri Section
VI. SOUTHERN RAILWAY
1 SR Mayyil-Apayavoor 4 2 2 50
crusher material
VII. WESTERN RAILWAY
1 WR Kalapipal-Phanda 4 1 3 67
doubling (Proposed

11
blanket sample)

TOTAL SAMPLES 69 29 40

PERCENTAGE - 42% 58%

12
Summary of samples of Blanket Material tested in RDSO in year 2003
S. Rail No. of No. of No. of samples Samples not
No. way Name of Project samples samples not conforming to
tested conforming conforming to specifications
to specifications (%)
specification
s
I. CENTRAL RAILWAY
1 CR Panvel-Karjat new 3 - 3 100
line
2 CR Talvadiya-Khirkiya 10 - 10 100
main line diversion
II. EAST CENTRAL RAILWAY
1 EC Parasbazar-Punpun 2 - 2 100
doubling
III. EASTCOAST RAILWAY
1 ECo Raghunathpur- 4 - 4 100
Gorakh Nath
rehabilitation
2 ECo CTC-RTC doubling 3 - 3 100
IV. EASTERN RAILWAY
1 ER Akra-New Alipore 4 3 1 25
doubling
2 ER Diversion of HBC 6 3 3 50
line
3 ER Patna-Gaya doubling 4 - 4 100
4 ER Gurap-Saktigarh 4 1 3 75
IIIrd line
5 ER Bolpur-Ahmad pur 7 - 7 100
doubling
V. NORTHEASTERN RAILWAY
1 NE Gorakhpur- 5 - 5 100
Domingarh doubling
VI. NORTHEAST FRONTIER RAILWAY
1 NF Eklakhi-Balur ghat 10 2 8 80
new line
2 NF Buniadpur-Balur 2 - 2 100
ghat new line
3 NF Daulatpur-Buni 5 5 - -
adpur new line
4 NF New Jalpaiguri- 7 - 7 100
Nagar kota section
5 NF New Jalpaiguri-New 6 1 5 83
Bongai gaon gauge
conv.(diversion)
6 NF Buniadpur-Balur 14 1 13 93
ghat new line
VII. NORTHERN RAILWAY
1 NR Utaratia-Sultan pur 4 2 2 50
doubling

13
2 NR Zafrabad-Utratia 2 2 - 100
doubling
3 NR Chandigarh- 13 6 7 54
Ludhiana new line
4 NR JRC-PTK-JAT 4 2 2 50
doubling
5 NR Zafrabad-Baksa 3 3 - -
doubling
6 NR Utratia-Sultan pur 3 3 - -
doubling
7 NR Lucknow-Sultan pur- 3 2 1 33
Zafrabad doubling
VIII. NORTH WESTERN RAILWAY
1 NW Udaipur-Chittaurgarh 8 3 5 63
gauge conv
(diversion)
IX. SOUTH CENTRAL RAILWAY
1 SC Gooty – Reni gunta 10 4 6 60
doubling
2 SC Yeramaras-Yada 10 4 6 60
lapur doubling
3 SC Ballapalli-Pullampet 8 - 8 100
doubling
4 SC Nidigullu-Ven 5 1 4 80
katgiri doubling
5 SC Yellakaru-Sri 4 - 4 100
kalahasti doubling
6 SC Bangarpet- Kuppam 4 - 4 100
doubling
7 SC Gudur-Reni unta 11 - 11 100
doubling
8 SC Pedapalli-Karim 13 4 9 69
nagar-Nizamabad new
line
1 SE Kesinga-Norla Road 8 - 8 100
doubling
2 SE Tamluk-Digha new 3 1 2 67
line
3 SE Rahama-Paradeep 19 1 18 95
doubling
XI. SOUTHEAST CENTRAL RAILWAY
1 SEC Dagori-Nipania 3rd 3 - 3 100
line
2 SEC Ambikapur- 5 1 4 80
Bisrampur new line
XII. SOUTHERN RAILWAY
1 SR Bangarpeth- Kuppam 4 - 4 100
doubling
2 SR Shoranur-Mangalore 7 2 5 71
doubling
XIII. SOUTH WESTERN RAILWAY
1 SW Hubli-Ankola new 6 - 6 100

14
line
XIV. WESTERN RAILWAY
1 WR Borivali-Virar 5 4 1 20
quadrupling

TOTAL SAMPLES 258 61 197

PERCENTAGE - 24 % 76 %

15
Summary of samples of Blanket Material tested in RDSO in year 2004

S. Rail- No. of No. of No. of samples Samples not


No. way Name of Project samples samples non conforming to
tested conforming conforming to specifications
to specifications (%)
specifica
ions
I. CENTRAL RAILWAY
1 CR Panvel-Karjat new line 6 - 6 100
II. EAST CENTRAL RAILWAY
1 EC Karpurigram-Siho 3 1 2 67
patch doubling
2 EC Ara-Sasaram new line 5 - 5 100
3 EC Rajgir-Tilaiya new line 4 - 4 100
III. EASTERN RAILWAY
1 ER Laxmikantpur- 2 1 1 50
Nankhana new line
2 ER Sheoraphulli- 5 5 - -
Tarkeshwar doubling
3 ER Sonarpur-Ghubri Sharif 3 3 - -
section
IV. EAST COAST RAILWAY
1 ECo Rahama-Paradeep 7 1 6 86
section
2 ECo Cuttack-Badakhanyat 5 - 5 100
doubling
3 ECo Karpurigram-Siho 3 1 2 67
doubling
V. NORTH CENTRAL RAILWAY
1 NC Agra Cantt-Etawah 4 - 4 100
new line
VI. NORTH EASTERN RAILWAY
1 NE Jarwal Road-Burhwal 4 2 2 50
patch doubling
2 NE Gorakhpur-Domingarh 4 - 4 100
patch doubling
3 NE Jarwal Road-Burhwal 5 3 2 40
patch doubling
VII. NORTHERN RAILWAY
1 NR Moradabad-Amroha 6 2 4 67
doubling
2 NR Una-Himachal-Chyram 6 1 5 83
new line
3 NR Jammu-Udhampur new 3 - 3 100
line
4 NR Amroha-Kankathar 6 - 6 100
doubling
VIII. NORTH WESTERN RAILWAY
1 NW Udaipur-Chittaurgarh 7 1 6 86
gauge conv.(diversion)

16
IX. SOUTH CENTRAL RAILWAY
1 SC Obulararipalli- 5 1 4 80
Pullampet doubling
2 SC Gooty-Renigunta patch 2 1 1 50
bling
3 SC Guntakal-Hospet 2 - 2 100
doubling
4 SC Renigunta-Gooty 12 - 12 100
doubling
5 SC Gangayapalli- 2 - 2 100
Kamlapuram sec
6 SC Yeragunta- 3 - 3 100
Jammaladugu section
X. SOUTHERN RAILWAY
1 SR SRR-MAQ doubling 3 - 3 100
2 SR Cannanur-Vallapatnam 3 - 3 100
doubling
3 SR Taramani-Velachari 3 - 3 100
new line, MRTS phase-
II
4 SR Tirumalai-Velachari 6 3 3 100
phase-II
5 SR Ernakulum-Mullantruti 3 - 3 100
doubling
XI. SOUTHEAST CENTRAL RAILWAY
1 SEC Korba-Gevra Road 3 - 3 100
doubling
XII. SOUTH WESTERN RAILWAY
1 SW Hubli-Ankola new line 7 - 7 100
2 SW Yashwantpur-Tumkur 4 - 4 100
section
3 SW Bangarpet-Kuppam 4 4 - -
section
XIII. WESTERN RAILWAY
1 WR Vasai Road-Virar 5 - 5 100
quadrupling of track
2 WR Rajula City-Pipavav 4 2 2 50
new line

TOTAL SAMPLES 155 32 123

PERCENTAGE - 21% 79%

17
ANNEXURE-II

Summary of samples of Blanket Material tested in RDSO in year 2002

No. of samples conforming

conforming to specifications

Type of sub-grade soil


No. of samples tested

Thickness of blanket

Thickness of blanket
No. of samples non
Name of Projects

to specifications

provided (cm)
required (cm)

Remarks
Railway
S.No.

I. EASTERN RAILWAY
1 ER Ara- 2 1 1 CI, 100 100 More fines in one sample
Sasaram CL
new line
2 ER Akra-New 6 5 1 SP 45 100 Out of curves, Cu<4
Alipore
3 ER Gurap- 3 2 1 CI 100 30 Less blanket thickness, out
Saktigarh to of curves
section 100
II. NORTHEAST FRONTIER RAILWAY
1 NF NJP-SGUJ- 4 - 4 SM, 60 100 Out of curves, Cc<1 in all
NBQ ML to samples
section 100
2 NF NJP-APDJ 7 - 7 SM, 60 100 More fines in 3 sample,
section ML to Cc<1
100
III. NORTHERN RAILWAY
1 NR Jammu- 2 - 2 CL, 60 30 Less blanket thickness,
Udhampur SM, to to More fines,
rail link SC 100 100 Cc<1
2 NR Amroha- 4 3 1 SM, 60 30 to More fines in one sample
Kankathar SC 100
doubling
3 NR Udhampur- 12 8 4 CL, 60 30 Less blanket thickness, out
Katra new SM, to to of curves, more fines in 2
line SC 100 100 samples, Cc<1
4 NR Moradabad 3 2 1 SM, 60 to 30 to Less blanket thickness,
-Amroha SC 100 100 more fines in one sample,
doubling Cc<1
5 NR Hamirpur 3 2 1 - - - More fines
quarry
material
IV. SOUTH CENTRAL RAILWAY
1 SC Gudur- 4 - 4 CL, SC 60 60 Less blanket thickness in

18
Renigunta to to loop line, more fines in 2
doubling 100 100 samples
V. SOUTH EASTERN RAILWAY
1 SE Sambalpur- 2 - 2 CI, 60 30 Less blanket thickness,
Talchar SM, to to more fines, out of curves
bye- pass SC 100 100
line
2 SE Bhilai- 3 2 1 CI, 60 30 Less blanket thickness,
Sarona CI, SC to to more fines in one
IIIrd line 100 100 sample,Cc<1
3 SE Champa- 2 - 2 CI, CL 100 80 Less blanket thickness,
Bolpur to more fines, out of curves
Bye-pass 100
line
4 SE Korba- 2 - 2 ML 100 80 Less blanket thickness,
Gevra to Cc<1 for both samples, out
Road new 100 of curves
line
5 SE Bankra- 2 - 2 CI 100 30 Less blanket thickness,
Nayabaz- to more fines in one sample,
Baltikuri 100 Cc<1
section
VI. SOUTHERN RAILWAY
1 SR Mayyil- 4 - 4 - - - Out of curves for 2
Apayavoor samples, more fines, Cc<1
crusher
VII. WESTERN RAILWAY
1 WR Kalapipal- 4 1 3 - - - Cu<4 in 3 Samples
Phanda
doubling
TOTAL SAMPLES 69 29 40

PERCENTAGE - 42% 58%

19
Summary of samples of Blanket Material tested in RDSO in year 2003

conforming to specifications

Samples not conforming to


No. of samples conforming

Thickness of blanket
No. of samples tested

Type of sub-grae soil

Thickness of blanket
No. of samples non

specifications (%)
to specifications
Name of Project

provided (cm)
required (cm)

Remarks
Railway
S. No.

I. CENTRAL RAILWAY
1 CR Panvel- 3 - 3 100 SM, 60 to 100 More fines, Cc<1,
Karjat new MI, 100
line ML
2 CR Talvadiya- 10 - 10 100 CH 100 45 to Less blanket thick
Khirkiya 60 ness, more fines in
main line all samples, Cc<1
diversion
II. EAST CENTRAL RAILWAY
1 EC Parasbazar- 2 - 2 100 CI, 100 100 Out of curves,
Punpun CL Cc<1
doubling
III. EASTCOAST RAILWAY
1 ECo Raghunath 4 - 4 100 CI, 100 100 Plastic fines 15-
pur-Gorakh CL 22%, Cc<1
Nath rehabili
tation
2 ECo CTC-RTC 3 - 3 100 SM, 100 100 More fines, Cc<1
doubling ML,
CL
IV. EASTERN RAILWAY
1 ER Akra-New 4 3 1 25 CI, 100 100 Cu<4 in one
Alipore CL, sample
doubling ML
2 ER Diversion of 6 3 3 50 CL, 100 50 Less blanket thick
HBC line CI to ness, more fines
100 in 2 samples,
Cc<1 in one
sample
3 ER Patna-Gaya 4 - 4 100 CI, 100 100 More fines in all
doubling CL, samples
ML
4 ER Gurap- 4 1 3 75 CI, 100 50 Less blanket
Saktigarh CH, to thickness, more
IIIrd line ML 100 fines, out of
curves

20
5 ER Bolpur- 7 - 7 100 CH, 100 100 More fines in all
Ahmadpur CI samples
doubling
V. NORTHEASTERN RAILWAY
1 NE Gorakhpur- 5 - 5 100 CI, 100 60 Less blanket thick
Domingarh CL, ness, more fines in
doubling ML 4 samples, Cc<1 in
one sample
VI. NORTHEAST FRONTIER RAILWAY
1 NF Eklakhi- 10 2 8 80 CH, 100 100 Out of curves,
Balurghat CI, Cc<1
new line ML
2 NF Buniadpur- 2 - 2 100 CH, 100 100 Out of curves,
Balurghat CI Cc<1
new line
3 NF Daulatpur- 5 5 - - CH, 100 100 -
Buniadpur CI
new line
4 NF New Jalpai 7 - 7 100 ML, 100 100 Cc<1 in all
guri-Nagar SM samples
kota section
5 NF New Jalpai 6 1 5 83 ML, 60 100 More fines, Cc<1
guri-New SM to
Bongaigaon 100
G. C.(diver)
6 NF Buniadpur- 14 1 13 93 CH, 100 100 Plastic fines 44%
Balurghat CI in 1 sample, out of
new line curves, Cc<1
1 NR Utaratia- 4 2 2 50 CI, 100 60 Less blanket thick
Sultanpur CL, ness, out of
doubling ML curves, Cc<1
2 NR Zafrabad- 2 2 - 100 CI, 100 60 Less blanket thick
Utratia CL, ness
doubling ML
3 NR Chandigarh- 13 6 7 54 SM, 60 100 Out of curves,
Ludhiana ML to Cc<1 in 7 samples
new line 100
4 NR JRC-PTK- 4 2 2 50 GP- 45 45 Cc<1 in 2 samples
JAT GM, to to
doubling SP 60 60
5 NR Zafrabad- 3 3 - - CL, 100 60 Less blanket thick
Baksa ML ness
doubling
6 NR Utratia- 3 3 - - CL, 100 60 Less blanket thick
Sultanpur ML ness
doubling
7 NR Lucknow- 3 2 1 33 CL, 100 60 Less blanket
Sultanpur- ML thickness, more
Zafrabad fines in one sample
doubling

21
VIII. NORTH WESTERN RAILWAY
1 NW Udaipur- 8 3 5 63 SC, - Coarse Plastic fines 20-
Chittaurgarh SM, grained 23% in 2 samples,
gauge conv GP- soil in out of curves,
(diversion) GM earth Cc<1,
work No blanket
provided
IX. SOUTH CENTRAL RAILWAY
1 SC Gooty - 10 4 6 60 SC 60 100 More fines 19-
Renigunta 32% in 6 samples,
doubling Cc<1
2 SC Yeramaras- 10 4 6 60 SC 60 60 More fines in 6
Yadalapur to samples
doubling 100
3 SC Ballapalli- 8 - 8 100 CH, 60 to 100 More fines in all
Pullampet SC 100 samples, Cc<1 in
doubling one sample
4 SC Nidigullu- 5 1 4 80 SC, 60 100 More fines in 4
Venkatgiri CL to samples, Cc<1 in 2
doubling 100 samples
5 SC Yellakaru- 4 - 4 100 SC 60 60 Less blanket thick
Srikalahasti to ness, more fines in
doubling 100 3 samples, Cc<1
in other one
sample
6 SC Bangarpet- 4 - 4 100 SW- 60 60 More fines, out of
Kuppam SM curves
doubling
7 SC Gudur- 11 - 11 100 SC 60 60 More plastic fines
Renigunta to (10 - 31%) in all
doubling 100 samples
8 SC Pedapalli- 13 4 9 69 ML, 60 100 More fines in 9
Karimnagar- SC to samples
Nizamabad 100
new line
X. SOUTH EASTERN RAILWAY
1 SE Kesinga- 8 - 8 100 CH, 100 100 More fines in 6
Norla Road CI samples, out of
doubling CL curves & Cc<1 in
other one each
sample
2 SE Tamluk- 3 1 2 67 CH, 100 100 More fines in one
Digha new CI sample & Cc<1 in
line other one
3 SE Rahama- 19 1 18 95 SM, 60 100 More fines, out of
Paradeep SC curves, Cc<1
doubling
XI. SOUTHEAST CENTRAL RAILWAY
1 SEC Dagori- 3 - 3 100 SM, 60 100 Plastic fines 18-
Nipania 3rd ML to 27% in all
line 100 samples, out of

22
curves
2 SEC Ambikapur- 5 1 4 80 SC, 60 to 100 More plastic fines
Bisrampur CH, 100 17-31% & Cc<1 in
new line GC 2 samples each,
XII. SOUTHERN RAILWAY
1 SR Bangarpeth- 4 - 4 100 CI, 100 100 More plastic fines
Kuppam SC in all samples
doubling
2 SR Shoranur- 7 2 5 71 CI, 60 100 More plastic fines
Mangalore MI, to 18-42% in 5
doubling SM 100 samples & Cc<1 in
2 samples
XIII. SOUTH WESTERN RAILWAY
1 SW Hubli- 6 - 6 100 CI, 60 30 Less blanket
Ankola new MH, to to thick ness, more
line SC 100 100 plastic fines 13 -
29% in all
samples
XIV. WESTERN RAILWAY
1 WR Borivali-Virar 5 4 1 20 CH, 100 100 Cc<1 in one
quadrupling CI sample

TOTAL SAMPLES 258 61 197

PERCENTAGE - 24 % 76 %

23
Summary of samples of Blanket Material tested in RDSO in year 2004

Samples not conforming


No.of samples not confo
No. of samples conform

rming to specifications

Type of sub-grade soil


No. of samples tested

Thickness of blanket

Thickness of blanket
to specifications (%)
ing to specifications
Name of project

provided (cm)
required (cm)

Remarks
Railway
S. No.

I. CENTRAL RAILWAY
1 CR Panvel- 6 - 6 100 SM, 100 100 Non plastic fines
Karjat new ML, 19-53%, out of
line MI curves, Cc<1
II. EAST CENTRAL RAILWAY
1 EC Karpurigra 3 1 2 67 CL, 100 100 More fines in one
m-Siho ML sample, Cc<1 in
patch other sample
doubling
2 EC Ara- 5 - 5 100 CI, 100 30 Less thickness of
Sasaram CI blanket, more fines
new line in all samples
3 EC Rajgir- 4 - 4 100 CL, 100 60 Less thickness of
Tilaiya ML blanket, more
new line plastic fines, out of
curves, Cc<1
III. EASTERN RAILWAY
1 ER Laxmikant 2 1 1 50 CI, 100 30 Less thickness of
pur- CH blanket, more fines
Nankhana
new line
2 ER Sheoraphul 5 5 - - CI, 100 30 Less thickness of
li- MI blanket
Tarkeshwar
doubling
3 ER Sonarpur- 3 3 - - CI, 100 30 Less thickness of
Ghubri MI blanket
Sharif
section
IV. EAST COAST RAILWAY
1 ECo Rahama- 7 1 6 86 SM, 60 to 100 More fines in 5
Paradeep SC, 100 samples, Cc<1 in
section ML one sample
2 ECo Cuttack- 5 - 5 100 SM, 100 100 More fines in 3
Badakhany ML, samples, Cc<1 in 2
at doubling CI samples
3 ECo Karpurigra 3 1 2 67 CI, 100 50 Less thickness of
m-Siho CL blanket, more fines

24
doubling in one sample,
Cc<1 in other
sample
V. NORTH CENTRAL RAILWAY
1 NC Agra 4 - 4 100 CL, 100 60 Less thickness of
Cantt- ML, blanket, more fines
Etawah CL- in all samples,
new line ML Cc<1
VI. NORTH EASTERN RAILWAY
1 NE Jarwal 4 2 2 50 CL, 100 100 Cc<1
Road- ML,
Burhwal CI
patch
doubling
2 NE Gorakhpur- 4 - 4 100 CL, 100 60 Less thickness of
Domingarh CI, blanket, Cc<1 in all
patch ML samples
doubling
3 NE Jarwal 5 3 2 40 CL, 100 100 Out of curves in 2
Road- ML, samples
Burhwal CI
patch
doubling
VII. NORTHERN RAILWAY
1 NR Moradabad 6 2 4 67 SM, 60 30 Less thickness of
-Amroha SC to blanket, Cc<1 in 4
doubling 100 samples
2 NR Una- 6 1 5 83 SM, 60 100 Cc<1 in 5 samples
Himachal- SC
Chyram
new line
3 NR Jammu- 3 - 3 100 CL- 60 30 Less thickness of
Udhampur ML, to blanket, more fines
new line SC 100 in all samples &
Cc<1
4 NR Amroha- 6 - 6 100 SM, 60 100 Cc<1 in all
Kankathar SC samples
doubling
VIII. NORTH WESTERN RAILWAY
1 NW Udaipur- 7 1 6 86 CL, 30 Subgra More fines & Cc<1
Chittaurgar GM, to de soil in 5 samples, out of
h gauge GP- 100 said to curves in one
conv. GM be sample
(diversion) blanket
IX. SOUTH CENTRAL RAILWAY
1 SC Obulararip 5 1 4 80 SM, 60 100 More fines, Cc<1,
alli- CL to out of curves
Pullampet 100
doubling
2 SC Gooty- 2 1 1 50 SM, 60 100 More fines in one
Renigunta CL to sample
patch 100

25
doubling
3 SC Guntakal- 2 - 2 100 SM, 60 100 More fines, Cc<1
Hospet CL to
doubling 100
4 SC Renigunta- 12 - 12 100 SC 60 100 Out of curves,
Gooty plastic fines 7-10%
doubling
5 SC Gangayapa 2 - 2 100 SC 60 100 More fines
lli-
Kamlapura
m section
6 SC Yeragunta- 3 - 3 100 SC 60 100 More fines, Cc<1
Jammaladu
gu section
X. SOUTHERN RAILWAY
1 SR SRR-MAQ 3 - 3 100 CI, 100 100 More fines in all
doubling MH samples, Cc<1
2 SR Cannanur- 3 - 3 100 CI, 100 100 More fines, Cc<1
Vallapatna MI
m doubling
3 SR Taramani- 3 - 3 100 MH, 60 100 More fines in all
Velachari SC to samples
new line, 100
MRTS
phase-II
4 SR Tirumalai- 6 3 3 100 MH, 60 100 More fines in 3
Velachari SC to samples
phaseII 100
5 SR Ernakulum 3 - 3 100 SC 60 60 More fines in all
- samples
Mullantruti
doubling
XI. SOUTHEAST CENTRAL RAILWAY
1 SEC Korba- 3 - 3 100 ML 100 80 More fines in all
Gevra to samples
Road 100
doubling
XII. SOUTH WESTERN RAILWAY
1 SW Hubli- 7 - 7 100 CI, 60 30 Less thickness of
Ankola ML, to to blanket, more fines
new line MH, 100 100 in all samples
SC curves, Cc<1
2 SW Yashwantp 4 - 4 100 SC 60 30 More fines in all
ur-Tumkur to samples
section 100
3 SW Bangarpet- 4 4 - - SW- 60 60 -
Kuppam SM
section
XIII. WESTERN RAILWAY
1 WR Vasai 5 - 5 100 CH 100 100 More fines, out of
Road-Virar curves, Cc<1
quadruplin

26
g of track
2 WR Rajula 4 2 2 50 SM 60 100 Cc<1 in 2 samples
City-
Pipavav
new line

TOTAL SAMPLES 155 32 123

PERCENTAGE - 21% 79%

27
ANNEXURE-III

DETAILS OF BLANKET TEST RESULTS TESTED AT G.E. LABORATORY IN YEAR 2002


Sample No. 2002/--

enveloping curves
Passing 75µ sieve
Classification

Lies within

Remarks
Location

γ max /
OMC /
Gravel
Project
S. No.

MDD

γ min
(Ch.)

Sand

Clay
Silt

LL

Cu
PL

Cc
PI
I. EASTERN RAILWAY
1 ER/170 Ara- Sasaram 95.460 SW- 01 87 12 00 12 NP NP NP 13.85 1.16 - 2.09 / YES -
new line SM 1.63
2 ER/171 -do- 96.350 SM 04 81 15 00 15 NP NP NP 16.0 1.00 - - NO More fines
3 ER/588 Akra-New 132/8-9 SW- 17 77 06 00 06 NP NP NP 18.75 1.33 - 1.98/ YES -
Alipore doubling SM 1.53
4 ER/589 -do- 14.400 SW- 01 90 00 09 09 NP NP NP 12.22 1.03 - 1.98/ YES -
SM 1.53
5 ER/590 -do- 14.300 SW- 03 88 09 00 09 NP NP NP 10.25 1.11 - 2.00/ YES -
SM 1.52
6 ER/591 -do- 14.660 SW- 04 89 07 00 07 NP NP NP 6.11 1.82 - 1.89/ YES -
SM 1.49
7 ER/592 -do- 18.100 SW- 04 88 08 00 08 NP NP NP 10.0 1.44 - 2.03/ YES -
SM 1.54
8 ER/593 -do- 14500 SP 01 95 04 00 04 NP NP NP 3.06 1.36 - 1.69/ NO Out of curves
1.33 Cu < 4
9 ER/664 Gurap- Saktigarh 60/14 SW- 03 89 08 00 08 NP NP NP 10.0 1.16 - - YES -
Section SM
10 ER/665 -do- 61/ SW- 01 90 09 00 09 NP NP NP 8.14 1.04 - - NO -
30-32 SM
11 ER/666 -do- 62/ SW- 04 87 09 00 09 NP NP NP 12.94 1.03 - - YES -
26-28 SM

28
II. NORTHEAST FRONTIER RAILWAY
1 NF/278 NJP-SGUJ-NBQ 5675 GP 49 48 03 00 03 NP NP NP 37.5 0.23 - - YES Cc<1
Sec.
2 NF/279 -do- 11110 SP 26 71 03 00 03 NP NP NP 15.0 0.42 - - YES Cc<1
3 NF/280 -do- 21867 SP 32 66 02 00 02 NP NP NP 13.07 0.41 - - YES Cc<1
4 NF/281 -do- 28030 SP 19 79 02 00 02 NP NP NP 7.5 0.40 - - YES Cc<1
5 NF/642 Gauge conv. bet. 11000 SP- 23 68 09 00 09 NP NP NP 25.0 0.64 - - NO Cc<1
NJP-APDJ Sec. SM
6 NF/643 -do- 26500 GP 55 42 03 00 03 NP NP NP 42.3 0.68 - - YES Cc<1
7 NF/644 -do- 48200 SM 24 53 23 00 23 NP NP NP 9.0 0.68 - - NO More fines,
Cc<1
8 NF/645 -do- 60850 SM 27 56 17 00 17 NP NP NP 27.02 0.78 - - NO More fines
Cc<1
9 NF/646 -do- 65950 SM 11 73 16 00 16 NP NP NP 12.0 1.3 - - NO More fines

10 NF/647 -do- 71450 SP- 26 62 12 00 12 NP NP NP 25.71 0.71 - - YES Cc<1


SM
11 NF/648 -do- 86075 SW- 21 67 12 00 12 NP NP NP 12.12 1.09 - - NO -
SM
III. NORTHERN RAILWAY
1 NR/135 Jammu- Bet. Ch. SM 03 72 24 01 25 NP NP NP 15.0 0.85 - - NO More fines
Udhampur rail 49/100- Cc<1
link 54/840
2 NR/136 -do- -do- SM 04 75 20 01 21 NP NP NP 16.11 0.81 - - NO More fines
Cc<1
3 NR/143 Amroha- Ch. not GW 65 33 02 00 02 NP NP NP 7.14 1.14 - - YES -
Kankathar mention
doubling ed
4 NR/144 -do- -do- GP 56 43 01 00 01 NP NP NP 10.0 3.02 - - YES -
5 NR/145 -do- -do- SM 00 70 26 04 30 NP NP NP 24.28 4.11 - - NO More fines
6 NR/146 -do- -do- GW 60 39 01 00 01 NP NP NP 10.85 1.47 - - YES -
7 NR/309 Udhampur-Katra 20920 SW- 37 51 11 01 12 NP NP NP 57.0 2.29 - 2.19/ YES -
Section SM 1.90
8 NR/310 -do- 21400 SM 20 47 32 01 33 NP NP NP 266.0 0.09 - - NO More fines
Cc<1

29
9 NR/497 -do- 22/550 GP- 59 31 10 00 10 NP NP NP 120.0 8.53 - - YES -
GM
10 NR/498 -do- 20/553 GP- 65 25 10 00 10 NP NP NP 24.0 8.07 - - YES -
GM
11 NR/499 -do- 20/450 GW- 56 37 07 00 07 NP NP NP 38.46 1.25 - - YES -
GM
11 NR/500 -do- 20/500 GW 58 39 03 00 03 NP NP NP 13.43 1.30 4.0/ - YES -
2.32
12 NR/501 -do- 20/550 GW- 62 31 07 00 07 NP NP NP 56.60 1.90 - - YES -
GM
13 NR/502 -do- 20/580 GW- 58 35 07 00 07 NP NP NP 47.17 1.89 - - YES -
GM
14 NR/503 -do- 24/420 GP- 56 36 08 00 08 NP NP NP 50.0 0.72 - - YES Cc<1
GM
15 NR/504 -do- 24/390 SP- 36 54 10 00 10 NP NP NP 53.33 2.70 - - YES -
SM
16 NR/505 -do- 24/380 SM 32 34 32 02 34 NP NP NP 5.36 0.28 - - NO More fines
Cc<1
17 NR/506 -do- 24/500 GM 37 29 33 01 34 NP NP NP 28.6 0.09 - - NO More fines
Cc<1
18 NR/568 Moradabad- From SP 48 50 02 00 02 NP NP NP 50.0 0.50 - - YES Cc<1
Amroha section stack
19 NR/569 -do- Bet. ch SW 36 63 01 00 01 NP NP NP 14.3 1.08 - - YES -
6.025-
6.050
20 NR/570 -do- - GC 40 34 17 09 26 44 22 22 14.84 12.16 8.7/ - NO More fines
2.06
21 NR/623 Hamirpur quarry - SW 11 86 03 00 03 NP NP NP 7.55 1.06 - 2.09/ YES -
1.57
23 NR/624 -do- - SP 10 89 01 00 01 NP NP NP 5.93 1.07 - 2.04/ YES -
1.60
24 NR/625 -do- - ML 03 18 70 09 79 NP NP NP 23.0 2.13 - - NO More fines
IV. SOUTH CENTRAL RAILWAY
1 SC/358 Gudur-Renigunta 78725 SM 04 80 15 01 16 NP NP NP 14.52 1.95 7.2/ NO More fines
doubling 2.13
2 SC/359 -do- 79200 SW- 34 58 08 00 08 NP NP NP 33.0 1.28 7.2/ 1.88/ YES -
SM 2.12 1.53

30
3 SC/360 -do- 81960 SM 23 63 13 01 14 NP NP NP 32.35 1.07 7.3/ 1.88/ NO More fines
2.12 1.53
4 SC/362 -do- 76325 SW- 25 64 11 00 11 NP NP NP 28.57 1.14 7.0/ 1.87/ YES -
SM 2.11 1.53
V. SOUTH EASTERN RAILWAY
1 SE /196 Korba-Gevra 41860 SC- 40 53 07 00 07 23 11 12 52.22 0.26 07/ - YES Cc<1
Road SP 2.16
2 SE /197 -do- 43620 SM- 24 68 08 00 08 NP NP NP 11.41 0.88 6.5/ - YES Cc<1
SP 2.18
3 SE/031 Sambalpur -Tal 1350 SC 13 58 20 09 29 43 22 21 769.23 1.08 - - NO More fines
char byepass line
4 SE/032 -do- 3650 SC 39 44 11 06 17 39 21 18 197.91 6.33 - - NO More fines
5 SE/078 Bhilai-Sarona 3rd 1080 GW- 56 36 08 00 08 NP NP NP 25.0 1.96 - - YES -
line GM
6 SE/079 -do- 1080 GW- 56 36 08 00 08 NP NP NP 25.0 1.96 - - YES -
GM
7 SE/080 -do- 15660 SP- 45 48 07 00 07 NP NP NP 24.55 0.84 - - NO More fines
SM
8 SE/081 Champa-Bolpur 3010 SC 27 51 20 02 22 30 14 16 600.0 56.0 - - NO More fines
bye-pass line
9 SE/082 -do- 840 SC 26 53 14 07 21 32 15 17 386.66 19.42 - - NO More fines

10 SE/377 Banka-Nayabag- 9470 SM 38. 47. 10. 4.3 15. NP NP NP 95.0 0.35 8.0/ - NO More fines
Baltikuri Section 04 45 18 3 51 2.185 Cc<1
11 SE/378 -do- 10200 SP- 35. 53. 8.7 2.3 11. NP NP NP 51.0 0.39 7.2/ - NO Cc<1
SM 67 28 5 05 2.23
VI. SOUTHERN RAILWAY
1 SR/554 Mayyil-Apayavur Q.Dust SW- 04 86 10 00 10 NP NP NP 14.67 1.02 - 2.32/ YES -
Crusher SM 1.79
2 SR/555 -do- -do- SP 00 97 03 00 03 NP NP NP 3.57 1.08 - 2.03/ YES -
1.60
3 SR/556 -do- -do- SM- 07 83 10 00 10 NP NP NP 12.67 0.74 - 2.27/ NO Cc<1
SP 1.80
4 SR/557 -do- -do- SM- 00 90 10 00 10 NP NP NP 2.37 1.05 - 2.18/ NO -
SP 1.63

31
VII. WESTERN RAILWAY
1 WR/541 Kalapipal-Phanda Q.dust GP 62 37 01 00 01 NP NP NP 3.5 1.3 - 1.91/ YES Cu<4
doubling 1.51
2 WR/542 -do- Q.dust GP 70 28 02 00 02 NP NP NP 3.71 1.38 - 1.92/ YES Cu<4
1.50
3 WR/543 -do- Blanket GP- 89 04 07 00 07 NP NP NP 3.04 2.24 15.4/ - YES Cu<4
GM 1.908
4 WR/544 -do- Blanket GP- 87 04 09 00 09 NP NP NP 14.0 7.14 15.5/ - YES -
GM 1.91

TOTAL SAMPLES TESTED: 69

32
DETAILS OF BLANKET TEST RESULTS TESTED AT G. E. LABORATORY IN YEAR 2003

Sample No. 2003/-

enveloping curves
Passing 75µ sieve
Classification
Project

Lies within
PI

Remarks
Location

γ max /
OMC /
Gravel
S. No.

MDD

γ min
(Ch.)

Sand

Clay
Silt

LL

Cu
PL

Cc
I. CENTRAL RAILWAY
1 CR/0365 Panvel-Karjat 1240 SM 13 69 18 00 18 NP NP NP 48.78 0.26 8.3/ - NO More fines,
new line 2.19 Cc<1
2 CR/0366 -do- 1425 SP- 24 67 09 00 09 NP NP NP 21.25 0.58 12.50. - YES Cc<1
SM 2.01
3 CR/0367 -do- 5500 SM 20 63 17 00 17 NP NP NP 23.44 0.76 12.0/ - NO More fines,
1.97 Cc<1
4 CR/0562 Talvadiya- 3390 SM 16 60 24 00 24 NP NP NP 22.03 0.22 10.0/ - NO More fines,
Khirkiya main line 2.09 Cc<1
diversion
5 CR/0563 -do- 8950 GP- 57 32 11 00 11 25 19 07 152.78 3.23 11.8/ - NO More fines
GC 2.08
6 CR/0564 -do- 14870 GC 56 24 19 01 20 28 20 08 150.0 2.406 11.5/ - NO More fines
2.02
7 CR/0565 -do- 20900 SC 37 45 18 00 18 28 19 09 82.22 0.82 11.7/ - NO More fines,
2.01 Cc<1
8 CR/0566 -do- 23530 SM 17 52 31 00 31 NP NP NP 19.38 1.13 11.8/ - NO More fines
2.08
9 CR/0567 -do- 30490 GM 41 38 21 00 21 NP NP NP 82.97 0.37 10.0/ - NO More fines,
2.10 Cc<1
10 CR/0568 -do- 33350 SM 11 60 29 00 29 NP NP NP 16.07 0.49 11.8/ - NO More fines,
1.96 Cc<1
11 CR/0569 -do- 35650 SM 32 48 20 00 20 NP NP NP 68.89 0.45 12.0/ - NO More fines,
1.96 Cc<1
12 CR/0570 -do- 41425 SM 35 51 14 00 14 40 30 10 51.53 0.83 12.7/ - NO More fines,
1.965 Cc<1

33
13 CR/0571 -do- 44615 SM 06 56 38 00 38 NP NP NP 16.47 1.0 12.6/ - NO More fines
1.94
II. EAST CENTRAL RAILWAY
1 EC/0021 Parasbazar- 10.645 SP- 08 85 07 00 07 NP NP NP 7.95 0.79 - 1.96/ NO Cc<1
Punpun doubling SM 1.60
2 EC/0022 -do- 10.170 SP- 01 91 09 09 NP NP NP 7.75 0.65 - 2.13/ NO Cc<1
SM 00 1.65
III. EAST COAST RAILWAY
1 Eco/0558 Raghunathpur- Km SM 26 57 11 06 17 NP NP NP 39.53 1.31 9.0/ - NO More fines
Gorakhnath 442/1 2.19
rehabilitation
2 Eco/0559 -do- Km SM 41 44 09 06 15 NP NP NP 77.42 0.30 7.5/ - NO More fines,
450/6 223 Cc<1
3 Eco/0560 -do- Km SM 21 57 18 04 22 NP NP NP 10.61 1.05 7.3/ - NO More fines
444/1 2.26
4 Eco/0561 -do- Km SM 30 55 06 09 15 NP NP NP 1000.0 10.70 7.2/ - NO More fines
446/10 2.28
5 Eco/0638 CTC-RTC 32940 SM 29 58 09 04 13 NP NP NP 14.00 1.06 7.7/ - NO More fines
doubling 2.17
6 Eco/0639 -do- 16820 SM 27 58 12 03 15 NP NP NP 40.0 1.04 8.4/ - NO More fines
2.25
7 Eco/0640 -do- 14490 SP- 33 55 09 03 12 NP NP NP 48.00 0.51 8.0/ - YES Cc<1
SM 2.24
IV. EASTERN RAILWAY
1 ER/0085 Akra- New 12375 SW- 01 89 10 00 10 NP NP NP 12.27 1.06 - 2.07/ YES -
Alipore doubling SM 1.60
2 ER/0086 -do- 12525 SP 32 66 02 00 02 NP NP NP 3.64 1.42 - 1.86/ YES Cu<4
1.43
3 ER/0087 -do- 12650 SP- 01 93 06 00 06 NP NP NP 5.71 1.68 - 1.87/ YES -
SM 1.53
4 ER/0088 -do- 13040 SP 28 68 04 00 04 NP NP NP 5.43 1.50 - 1.88/ YES -
1.50
5 ER/0228 Diversion of 528 SM 00 86 14 00 14 NP NP NP 14.41 1.01 - 2.10/ NO More fines
HBC line 1.67
6 ER/0229 -do- 970 SM 04 82 14 00 14 NP NP NP 14.26 1.28 - 2.10/ NO More fines
1.67
7 ER/0230 -do- 1430 SW- 04 88 08 00 08 NP NP NP 13.33 1.01 - 2.07/ YES -

34
SM 1.67
8 ER/0231 -do- 2370 SW- 02 90 08 00 08 NP NP NP 7.42 1.02 - 1.95/ YES -
SM 1.67
9 ER/0232 -do- 3110 SW- 03 91 06 00 06 NP NP NP 6.67 1.00 - 1.97/ YES -
SM 1.67
10 ER/0233 -do- 2750 SW 01 95 04 00 04 NP NP NP 5.64 0.87 - 1.93/ YES Cc<1
1.63
11 ER/0267 Patna-Gaya 21090 SM 00 83 17 00 17 NP NP NP 13.33 1.48 - 1.99/ NO More fines
doubling 1.54
12 ER/0268 -do- 21245 SM 02 81 17 00 17 NP NP NP 15.38 2.26 - 2.08/ NO More fines
1.57
13 ER/0269 -do- 22070 SM 01 83 16 00 16 NP NP NP 13.86 2.15 - 1.99/ NO More fines
1.50
14 ER/0270 -do- 22470 SM 01 82 17 00 17 NP NP NP 16.25 2.03 - 2.08/ NO More fines
1.58
15 ER/0437 3rd line bet. 65/24+ SM 11 76 13 00 13 NP NP NP 18.57 1.42 - 1.99/ NO More fines
Gurup & Saktigarh 20m 1.53
16 ER/0438 -do- 68/4 SW- 10 78 12 00 12 NP NP NP 14.29 1.46 - 1.75/ YES -
SM 1.40
17 ER/0439 -do- 72/20+ SM 01 86 13 00 13 NP NP NP 12.86 1.43 - 1.99/ NO More fines
8.2m 1.53
18 ER/0440 -do- 76/12- SW- 03 85 12 00 12 NP NP NP 12.86 1.43 - 1.93/ NO -
9.5m SM 1.49
19 ER/0522 Bolpur-Ahmadpur 8090 SC 11 56 20 13 33 30 13 17 - - 9.3/ - NO More fines
doubling 2.10
20 ER/0523 -do- 9650 SC 21 52 15 12 27 31 15 16 - - 9.5/ - NO More fines
2.12
21 ER/0524 -do- 11820 SC 28 50 15 07 22 33 15 18 367.35 8.89 8.0/ - NO More fines
2.15
22 ER/0525 -do- 16930 SC 27 51 13 09 22 38 199 19 962.96 13.69 7.9/ - NO More fines
2.15
23 ER/0526 -do- 17475 SC 34 46 13 07 20 39 18 21 266.67 4.59 8.0/ - NO More fines
2.16
24 ER/0527 -do- 3410 SM 09 77 11 03 14 NP NP NP 15.87 1.43 7.8/ - NO More fines
2.16
25 ER/0528 -do- 1805 SC 07 59 23 11 34 28 13 15 300.0 9.39 7.6/ - NO More fines
2.17

35
V. NORTH EASTERN RAILWAY
1 NE/0503 Gorakhpur-Domin 40000 SP 45 54 01 00 01 NP NP NP 21.48 0.92 - 2.04/ YES Cc<1
garh doubling 1.81
2 NE/0504 -do- 40500 SP 25 72 03 00 03 NP NP NP 12.0 0.40 - 1.96/ YES Cc<1
1.76
3 NE/0505 -do- 26250 SP- 25 69 06 00 06 NP NP NP 10.0 0.36 - 1.91/ YES Cc<1
SM 1.67
4 NE/0506 -do- 25000 SW- 06 84 10 00 14 NP NP NP 20.0 2.11 - 1.95/ NO More fines
SM 1.49
5 NE/0507 -do- 29500 GP 51 47 02 00 02 NP NP NP 39.28 0.32 - 1.95/ YES Cc<1
1.73
VI. NORTHEAST FRONTIER RAILWAY
1 NF/0154 Eklakhi-Balur 33900 SP- 26 65 09 00 09 NP NP NP 21.11 0.80 - 1.97/ YES Cc<1
ghat new line SM 1.67
2 NF/0155 -do- 34800 SW- 04 86 10 00 10 NP NP NP 7.47 1.26 - 1.59/ NO -
SM 1.92
3 NF/0156 -do- 35400 SW- 06 85 09 00 09 NP NP NP 10.0 1.01 - 1.96/ YES -
SM 1.59
4 NF/0157 -do- 35760 SW- 11 80 09 00 09 NP NP NP 9.0 1.67 - 1.88/ NO -
SM 1.48
5 NF/0158 -do- 36600 SP- 01 89 10 00 10 NP NP NP 8.63 0.80 - 1.89/ NO Cc<1
SM 1.47
6 NF/0159 -do- 36875 SP- 02 91 07 00 07 NP NP NP 7.88 10.6 - 1.84/ NO -
SM 1.43
7 NF/0160 -do- 37350 SW- 25 65 10 00 10 NP NP NP 18.65 1.0 - 1.97/ YES -
SM 1.60
8 NF/0161 -do- 38700 SP- 03 89 08 00 08 NP NP NP 5.86 0.86 - 1.94/ YES Cc<1
SM 1.57
9 NF/0162 -do- 40109 SP- 16 15 09 00 09 NP NP NP 22.99 0.83 - 1.87/ YES Cc<1
SM 1.58
10 NF/0163 -do- 41400 SW- 02 88 10 00 10 NP NP NP 10.0 1.31 - 1.94/ NO -
SM 1.57
11 NF/0181 Buniadpur-Balur 45100 SP- 31 62 07 00 07 NP NP NP 13.54 0.67 - 1.90/ YES Cc<1
ghat new line SM 1.57
12 NF/0182 -do- 56650 SP- 05 86 09 00 09 NP NP NP 6.25 0.72 - 1.91/ YES Cc<1
SM 1.57
13 NF/0214 Daulatpur-Buniad 35610 SW- 09 81 10 00 10 NP NP NP 11.87 1.53 - 1.81/ YES -

36
pur new line SM 1.43
14 NF/0215 -do- 36300 SW- 12 78 11 00 11 NP NP NP 17.33 1.33 - 1.91/ YES -
SM 1.56
15 NF/0216 -do- 37200 SW- 17 74 09 00 09 NP NP NP 15.58 1.04 - 2.02/ YES -
SM 1.70
16 NF/0217 -do- 39300 SW- 17 74 09 00 09 NP NP NP 12.05 1.01 - 1.93/ YES -
SM 1.53
17 NF/0218 -do- 40600 SW- 09 81 10 00 10 NP NP NP 11.60 1.12 - 1.84/ YES -
SM 1.53
18 NF/0597 New Jalpaiguri- 19025 SP- 37 56 07 00 07 NP NP NP 30.77 0.21 - 1.97/ YES Cc<1
Nagarkota gauge SM 1.52
conversion
19 NF/0598 -do- 43475 SP- 41 53 06 00 06 NP NP NP 37.14 0.18 - 1.96/ YES Cc<1
SM 1.57
20 NF/0599 -do- 46625 SP- 35 56 09 00 09 NP NP NP 30.59 0.41 - 1.96/ YES Cc<1
SM 1.52
21 NF/0600 -do- 52290 GP 51 45 04 00 04 NP NP NP 68.18 0.05 - 1.95/ YES Cc<1
1.63
22 NF/0601 -do- 60415 GP- 30 62 08 00 08 NP NP NP 16.36 0.55 - 1.82/ YES Cc<1
GM 1.43
23 NF/0602 -do- 64375 SP 32 65 03 00 03 NP NP NP 7.39 0.37 - 1.82/ YES Cc<1
1.49
24 NF/0603 -do- 75300 SP 43 49 08 00 08 NP NP NP 70.83 0.14 - 1.86/ YES Cc<1
1.48
25 NF/0681 New Jalpaiguri- 179800 SM 17 39 44 00 44 NP NP NP 25.83 1.24 - 2.05/ NO More fines
New Bongaigaon 1.71
Gauge conv. (div.)
26 NF/0682 -do- 172475 SP- 27 66 07 00 07 NP NP NP 15.38 0.57 - 1.97/ YES Cc<1
SM 1.79
27 NF/0683 -do- 141710 SW- 00 88 12 00 12 NP NP NP 6.85 2.33 - 1.99/ YES -
SM 1.64
28 NF/0684 -do- 109550 SM 25 61 13 01 14 NP NP NP 44.44 1.14 - 2.07/ NO More fines
1.75
29 NF/0685 -do- 97600 SP- 37 53 10 00 10 NP NP NP 53.33 0.53 - 2.05/ YES Cc<1
SM 1.73
30 NF/0686 -do- 82050 SP- 26 66 09 00 09 NP NP NP 14.63 0.85 - 1.96/ YES Cc<1
SM 1.58
31 NF/0741 Buniadpur-Balur 86.350 SP- 13 79 08 00 08 NP NP NP 4.56 1.98 - 1.87/ NO -

37
ghat new line SM 1.533

32 NF/0742 -do- 84.000 SP- 17 79 04 00 04 NP NP NP 12.0 0.52 - 1.93/ NO Cc<1


SM 1.60
33 NF/0743 -do- 82.080 SP- 24 69 07 00 07 NP NP NP 21.0 0.65 - 1.93/ YES Cc<1
SM 1.70
34 NF/0744 -do- 79.500 SP- 21 69 10 00 10 NP NP NP 14.67 0.82 - 1.85/ YES Cc<1
SM 1.533
35 NF/0745 -do- 76.900 SP- 08 82 10 00 10 NP NP NP 5.06 1.53 - 1.85/ NO -
SM 1.47
36 NF/0746 -do- 74.300 SW- 25 69 06 00 06 NP NP NP 17.50 2.50 - 1.85/ YES -
SM 1.58
37 NF/0747 -do- 72.625 SP- 22 71 07 00 07 NP NP NP 16.92 0.98 - 1.87/ YES Cc<1
SM 1.57
38 NF/0748 -do- 69.500 SP- 13 80 07 00 07 NP NP NP 12.35 0.40 - 1.88/ YES Cc<1
SM 1.57
39 NF/0749 -do- 67.000 SP- 16 77 07 00 07 NP NP NP 13.85 0.98 - 1.89/ YES Cc<1
SM 1.57
40 NF/0750 -do- 56.625 SP- 24 70 06 00 06 NP NP NP 15.71 0.81 - 1.90/ YES Cc<1
SM 1.58
41 NF/0751 -do- 54.000 SP- 16 73 08 00 08 NP NP NP 20.0 0.84 - 1.93/ YES Cc<1
SM 1.63
42 NF/0752 -do- 49.500 SM 10 46 44 00 44 NP NP NP 8.36 0.33 - 1.88/ NO More fines
1.67
43 NF/0753 -do- 46.500 SW- 06 85 09 00 09 NP NP NP 14.46 1.03 - 1.87/ YES -
SM 1.57
44 NF/0754 -do- 43.000 SP- 17 76 07 00 07 NP NP NP 16.0 0.64 - 1.88/ YES Cc<1
SM 1.55
VII. NORTHERN RAILWAY
1 NR/0031 Utratia-Sultan Coarse SP 23 75 02 00 02 NP NP NP 6.78 0.86 - - YES Cc<1
Pur doubling sand
2 NR/0032 -do- Sand SP 03 94 03 00 03 NP NP NP 2.46 1.63 - - NO -
3 NR/0034 -do- Stone SW- 05 85 10 00 10 NP NP NP 20.0 1.72 - 1.89/ YES -
dust SM 1.51
4 NR/0035 -do- Stone SW- 08 83 09 00 NP NP NP 17.78 1.34 - 1.91/ YES -
dust SM 1.53
5 NR/0066 Zafrabad- Stone SW- 12 82 06 00 06 NP NP NP 10.77 1.98 - 1.84/ YES -

38
Utratia doubling dust SM 1.45
6 NR/0067 -do- Stone SW- 12 82 06 00 06 NP NP NP 10.0 1.30 - 1.87/ YES -
dust SM 1.45
7 NR/0283 Chandigarh-Ludhia 1175- SP- 37 53 10 00 10 NP NP NP 53.33 0.41 - - YES Cc<1
new line 1200 SM
8 NR/0284 -do- 1825- SP- 27 66 08 00 08 NP NP NP 23.86 0.42 - - YES Cc<1
1850 SM
9 NR/0285 -do- 2625- SP- 28 64 09 00 09 NP NP NP 32.14 0.42 - - YES Cc<1
2650 SM
10 NR/0286 -do- 3250- SP 40 57 04 00 04 NP NP NP 39.17 0.47 - - YES Cc<1
3275
11 NR/0288 -do- 8800 GW- 48 46 06 00 06 NP NP NP 28.57 1.14 - - YES -
GM
12 NR/0289 -do- 10200 GW- 52 42 06 00 06 NP NP NP 30.45 1.33 - - YES -
GM
13 NR/0290 -do- 8100 GW- 56 39 05 00 05 NP NP NP 30.74 1.29 - - YES -
GM
14 NR/0291 -do- 9800 GW- 51 43 06 00 06 NP NP NP 28.64 1.41 - - YES -
GM
15 NR/0292 -do- 11200 GW- 39 55 06 00 06 NP NP NP 22.50 0.63 - - YES Cc<1
GM
16 NR/0293 -do- 11500 GW- 48 47 05 00 05 NP NP NP 42.86 1.19 - - YES -
GM
17 NR/0294 -do- 13225- GW- 49 46 05 00 05 NP NP NP 40.0 1.34 - - YES -
13250 GM
18 NR/0295 -do- 14200- GP- 52 42 06 00 06 NP NP NP 34.50 0.88 - - YES Cc<1
14225 GM
19 NR/0296 -do- 12575 SP- 46 47 07 00 07 NP NP NP 32.35 0.60 - - NO Cc<1
SM
20 NR/0458 JRC-PTK-JAT 77/0 SP- 15 75 10 00 10 NP NP NP 4.67 2.38 - 1.99/ YES -
doubling SM 1.76
21 NR/0459 -do- 17/525 SP- 41 49 09 00 09 NP NP NP 72.37 0.22 - 2.02/ YES Cc<1
SM 1.81
22 NR/0460 -do- 17/875 SP 29 67 04 00 04 NP NP NP 8.09 0.74 - 2.02/ YES Cc<1
1.74
23 NR/0461 -do- From Sw- 20 69 11 00 11 NP NP NP 22.54 1.02 - 2.01/ YES -
stack SM 1.79
24 NR/0612 Zafrabad-Baksa 828/ SW- 04 86 10 00 10 NP NP NP 16.46 1.06 - 2.01/ YES -

39
doubling 250 SM 1.56
25 NR/0613 -do- 828/ SW- 06 89 05 00 05 NP NP NP 13.08 1.37 - 1.98/ YES -
750 SM 1.55
26 NR/0614 -do- 836/ SW- 04 86 10 00 10 NP NP NP 22.50 2.58 - 1.98/ YES -
800 SM 1.56
27 NR/0621 Utratia-Sultanpur 1040/ SW- 10 82 08 00 08 NP NP NP 12.22 1.10 - 1.83/ YES -
doubling 450 SM 1.53
28 NR/0622 -do- 1036/ SW- 04 87 09 00 09 NP NP NP 11.11 1.07 - 1.83/ YES -
360 SM 1.53
29 NR/0623 -do- 1035/ SW- 00 91 09 00 09 NP NP NP 10.78 1.12 - 1.79/ YES -
225 SM 1.47
30 NR/0635 Lucknow-Sultanpur 842/ SW- 05 83 12 00 12 NP NP NP 17.39 1.48 - 1.92/ YES -
Zafrabad doubling 775 SM 1.57
31 NR/0636 -do- 922/ SW- 08 80 12 00 12 NP NP NP 20.83 1.63 - 1.95/ YES -
500 SM 1.61
32 NR/0637 -do- 921/ SM 04 83 13 00 13 NP NP NP 22.22 1.72 - 1.91/ NO More fines
450 1.63
VIII. NORTH WESTERN RAILWAY
1 NW/0649 Udaipur-Chittaur 62520 SC 29 48 23 00 23 32 20 12 52.23 0.18 7.2/ - NO More fines,
garh gauge conv. 2.11 Cc<1
2 NW/0650 -do- 63020 SM 29 51 19 01 20 NP NP NP 98.21 0.78 - 1.98/ NO More fines,
1.58 Cc<1
3 NW/0651 -do- 63700 GP- 48 41 10 01 11 NP NP NP 112.14 0.31 - 1.99/ YES Cc<1
GM 1.598
4 NW/0652 -do- 56820 SP- 43 46 11 00 11 NP NP NP 76.79 0.43 - 2.15/ YES Cc<1
SM 1.698
5 NW/0653 -do- 55680 GW- 59 31 10 00 10 NP NP NP 150.91 1.43 - 2.11/ YES Cc<1
GM 1.63
6 NW/0654 -do- 49293 GP- 70 25 05 00 05 NP NP NP 28.39 10.03 - 2.18/ YES -
GM 1.698
7 NW/0655 -do- 48620 GW- 52 36 12 00 12 NP NP NP 101.44 1.27 - 2.20/ YES -
GM 1.66
8 NW/0656 -do- 47620 GP- 66 29 05 00 05 NP NP NP 44.43 8.52 - 2.09/ YES -
GM 1.66
IX. SOUTH CENTRAL RAILWAY
1 SC/0044 Yeramaras-Yadala 692625 SC 03 84 13 00 13 26 20 06 14.0 1.29 7.0/ - NO More fines
doubling 2.17

40
2 SC/0045 -do- 691800 SC 04 69 25 02 27 40 22 18 33.0 3.52 9.0/ - NO More fines
2.13
3 SC/0046 -do- 691350 SC 10 57 33 00 33 33 15 18 115.0 0.27 7.5/ - NO More
2.15 fines,
Cc<1
4 SC/0047 -do- 690650 SW- 06 82 12 00 12 NP NP NP 17.0 1.07 7.3/ - YES -
SM 2.18
5 SC/0048 -do- 690300 SW- 06 83 11 00 11 NP NP NP 15.0 1.29 6.8/ - YES -
SM 2.11
6 SC/0050 -do- 701750 SW- 14 80 06 00 06 NP NP NP 10.5 1.17 8.5/ - YES -
SM 2.05
7 SC/0051 -do- 699675 SW- 10 80 10 00 10 NP NP NP 17.33 1.40 9.0/ - YES -
SM 2.04
8 SC/0052 -do- 697800 SP- 12 78 10 00 10 50 23 27 10.0 3.93 9.5/ - NO More fines
SC 2.04
9 SC/0053 -do- 696400 SC 22 69 09 00 09 31 20 11 28.0 1.75 7.0/ - NO More fines
2.11
10 SC/0054 -do- 693575 SC 03 87 10 00 10 35 12 13 12.67 1.26 7.8/ - NO More fines
2.13
11 SC/0237 Ballapalli-Pullam 159375 SM 28 58 10 04 14 NP NP NP 33.85 0.63 7.0/ - NO More fines,
peth doubling 2.16 Cc<1
12 SC/0238 -do- 160900 SC 26 49 16 09 25 31 16 15 40.0 12.2 7.0/ - NO More fines
2.15
13 SC/0239 -do- 164475 SC 12 69 14 05 19 27 15 12 38.63 5.14 7.0/ - NO More fines
2.12
14 SC/0241 -do- 176575 GC 39 44 10 07 17 32 18 14 450.0 11.5 9.0/ - NO More fines
2.09
15 SC/0242 -do- 178125 SC 48 29 17 06 23 27 15 12 568.7 0.27 8.8/ - NO More fines,
2.06 Cc<1
16 SC/0243 -do- 183675 SC 18 64 12 06 18 30 17 13 90.0 4.44 9.0/ - NO More fines
2.08
17 SC/0244 -do- 186000 SC 15 68 17 00 17 29 16 13 38.33 2.19 8.0/ - NO More fines
2.22
18 SC/0245 -do- 187125 SC 11 72 17 00 17 30 14 16 52.73 5.31 7.4/ - NO More fines
2.22
19 SC/0298 Nidigullu-Venkat 32150 SW- 30 63 07 00 07 NP NP NP 17.89 1.55 6.8/ - YES -
giri doubling (centre) SM 2.20

41
20 SC/0299 -do- 32150 CL 01 46 50 03 53 24 15 09 13.75 2.84 7.2/ - NO More fines
(side) 2.12
21 SC/0300 -do- 33500 SC 25 51 23 01 24 28 18 10 60.0 0.42 7.0/ - NO More fines,
2.11 Cc<1
22 SC/0301 -do- 34700 SM 28 56 16 00 16 NP NP NP 30.16 0.86 7.8/ - NO More fines,
2.18 Cc<1
23 SC/0302 -do- 36375 SM 05 78 17 00 17 NP NP NP 25.49 1.45 9.0/ - NO More fines
2.16
24 SC/0303 Yellakaru-Srikalah 52525 SC 19 46 32 03 35 33 18 15 140.0 1.28 6.9/ - NO More fines
doubling 2.14
25 SC/0304 -do- 52600 SC 14 57 11 18 29 45 22 23 - - 8.2/ - NO More fines
2.16
26 SC/0305 -do- 52725 SC 00 68 16 16 32 50 27 23 - - 8.0/ - NO More fines
2.18
27 SC/0306 -do- 51000 SP- 35 56 09 00 09 NP NP NP 48.78 0.26 8.3/ - YES Cc<1
SM 2.19
28 SC/0492 Gudur-Renigunta 37300 SC 11 65 21 03 24 35 20 15 39.53 0.44 9.0/ - NO More fines,
doubling 2.07 Cc<1
29 SC/0493 -do- 37890 SC 39 44 12 05 17 34 15 19 77.97 1.28 11.2/ - NO More fines
2.08
30 SC/0494 -do- 38900 SC 32 45 13 10 23 41 18 23 1321.4 13.94 10.4/ - NO More fines
2.02
31 SC/0495 -do- 38975 SC 41 42 11 06 17 36 16 20 158.33 5.68 9.0/ - NO More fines
2.09
32 SC/0496 -do- 46920 SC 28 41 16 15 31 52 18 34 - - 9.4/ - NO More fines
2.03
33 SC/0497 -do- 45450 SP- 38 50 08 04 12 37 20 17 50.67 23.72 11.2/ - NO More fines
SM 2.09
34 SC/0498 -do- 45800 SC 29 51 11 07 18 38 22 16 223.53 50.15 10.7/ - NO More fines
2.15
35 SC/0499 -do- 39150 SC 34 42 15 09 24 33 15 18 1090.9 4.07 8.9/ - NO More fines
2.11
36 SC/0500 -do- 39475 GP- 52 38 07 03 10 39 19 20 82.67 19.35 9.5/ - NO More fines
GC 2.13
37 SC/0501 -do- 40075 SC 33 44 15 08 23 37 20 17 1151.5 14.07 9.4/ - NO More fines
2.08
38 SC/0502 -do- 43625 SC 18 62 11 09 20 43 19 24 44.04 43.0 11.2/ - NO More fines
2.11

42
39 SC/0580 Gooty-Renigunta 210025 SC 03 74 21 02 23 25 14 11 12.17 1.01 9.8/ - NO More fines
doubling 2.12
40 SC/0581 -do- 211150 SC 27 44 24 05 29 31 15 16 112.50 0.78 9.4/ - NO More fines,
2.10 Cc<1
41 SC/0582 -do- 210950 SC 24 52 19 05 24 29 14 15 77.27 2.41 8.4/ - NO More fines
2.12
42 SC/0583 -do- 210725 SC 19 58 18 05 23 30 14 16 21.40 1.34 8.4/ - NO More fines
2.14
43 SC/0584 -do- 214850 SC 29 41 21 09 30 39 19 20 966.67 0.65 8.0/ - NO More fines,
2.14 Cc<1
44 SC/0585 -do- 214625 SC 25 42 25 08 33 33 19 14 466.67 1.20 7.2/ - NO More fines
2.16
45 SC/0586 -do- 167425 SM 18 63 19 00 19 NP NP NP 13.54 0.85 9.6/ - NO More fines,
2.10 Cc<1
46 SC/0587 -do- 167525 SM- 11 57 27 05 32 20 14 06 15.83 0.55 7.2/ - NO More fines,
SC 2.60 Cc<1
47 SC/0588 -do- 167575 SC 04 75 19 02 21 27 16 11 7.03 1.68 9.6/ - NO More fines
2.14
48 SC/0589 -do- 169975 SC 11 62 22 05 27 27 17 10 136.36 2.67 9.6/ - NO More fines
2.18
49 SC/0658 Pedapalli-Karim 37120 SW- 30 60 10 00 10 NP NP NP 45.06 1.42 8.2/ - YES -
Nagar new line SM 2.12
50 SC/0659 -do- 37300 SW- 20 70 10 00 10 NP NP NP 29.29 1.47 6.4/ - YES -
SM 2.144
51 SC/0660 -do- 38800 GW- 46 46 08 00 08 31 20 11 25.92 2.52 - 1.82/ NO More fines
GC 1.433
52 SC/0661 -do- 40150 SP- 38 53 09 00 09 38 17 21 40.59 3.76 8.8/ - NO More fines
SC 2.08
53 SC/0662 -do- 40650 SC 34 43 23 00 23 34 17 17 100.71 0.61 7.4/ - NO More fines,
2.19 Cc<1
54 SC/0663 -do- 41275 SW- 35 56 09 00 09 33 20 13 31.10 2.49 6.6/ - NO More fines
SC 2.19
55 SC/0664 -do- 42160 SW- 39 54 07 00 07 NP NP NP 37.42 1.39 7.2/ - YES -
SM 2.104
56 SC/0666 -do- 44700 SC 20 67 13 00 13 32 16 16 34.54 2.62 7.6/ - NO More fines
2.17
57 SC/0669 -do- 49260 SW- 23 70 07 00 07 32 19 13 18.85 1.14 6.8/ - YES More fines
SC 2.142

43
58 SC/0670 -do- 50100 SW- 31 60 09 00 09 NP NP NP 35.91 2.58 6.8/ - YES -
SM 2.11
59 SC/0671 -do- 54450 SC 27 55 17 01 18 43 24 19 46.0 3.00 8.4/ - NO More fines
2.10
60 SC/0672 -do- 55280 SM 10 73 14 03 17 NP NP NP 27.0 1.48 8.4/ - NO More fines
2.108
61 SC/0673 -do- 56200 SC 16 64 16 04 20 30 19 11 56.0 1.36 8.0/ - NO More fines
2.10
X. SOUTH EASTERN RAILWAY
1 SE/0128 Kizinga-Narla 4090 SW- 20 70 10 00 10 NP NP NP 23.0 2.10 7.20/ - NO -
Road doubling SM 2.15
2 SE/0129 -do- 2150 SM 32 53 13 02 15 NP NP NP 51.0 2.10 7.20/ - NO More fines
2.15
3 SE/0130 -do- 5800 SC 04 61 31 04 35 28 12 16 144.0 1.68 7.0/ - NO More fines
2.16
4 SE/0131 -do- 3400 SM 16 70 14 00 14 NP NP NP 18.0 1.12 7.50/ - NO More fines
2.15
5 SE/0132 -do- 1300 SM 10 77 13 00 13 NP NP NP 16.0 1.25 7.20/ - NO More fines
2.17
6 SE/0133 -do- 1690 SP- 06 84 10 00 10 NP NP NP 21.33 0.52 7.20/ - NO Cc<1
SM 2.17
7 SE/0134 -do- 6720 SM 30 56 13 01 14 20 14 06 45.0 1.97 7.30/ - NO More fines
2.11
8 SE/0135 -do- 4360 SC 33 46 19 02 21 28 15 13 87.0 0.87 7.20/ - NO More fines
2.20
9 SE/0246 Tamluk-Digha Mooru GP- 50 41 09 00 09 36 16 20 34.33 8.66 11.5/ - NO More fines
new line m GC 1.92
10 SE/0247 -do- Blanket GP- 60 32 08 00 08 NP NP NP 52.11 4.78 7.9/ - YES -
at ch. GM 2.2
40100
11 SE/0250 -do- Blanket SP- 32 60 08 00 08 NP NP NP 40.71 0.18 7.8/ - YES Cc<1
at ch. SM 2.2
34140
12 SE/0530 Rahama-Paradeep 820 GP- 49 40 08 03 11 NP NP NP 140.0 0.08 8.8/ - YES Cc<1
doubling GM 2.16
13 SE/0531 -do- 8100 SP- 30 57 10 02 12 NP NP NP 37.14 0.20 9.10/ - NO Cc<1
SM 2.15

44
14 SE/0532 -do- 1080 SW- 31 51 07 04 11 NP NP NP 12.05 1.05 9.0/ - YES -
SM 2.14
15 SE/0533 -do- 8080 ML- 00 25 61 14 75 22 16 06 46.0 0.42 11.0/ - NO More fines,
CL 1.99 Cc<1
16 SE/0534 -do- 9780 GP- 57 32 09 02 11 NP NP NP 152.78 0.14 8.1/ - YES Cc<1
GM 2.15
17 SE/0535 -do- 16900 SM 35 52 10 03 13 NP NP NP 38.57 0.36 8.0/ - NO More fines,
1.92 Cc<1
18 SE/0536 -do- 1620 SP- 38 52 09 01 10 NP NP NP 50.67 0.15 8.6/ - NO More fines,
SM 2.07 Cc<1
19 SE/0537 -do- 3920 SM 34 47 13 06 19 NP NP NP 121.74 0.40 10.2/ - NO More fines,
2.14 Cc<1
20 SE/0538 -do- 11720 GP- 48 44 08 00 08 NP NP NP 81.11 0.12 9.2/ - NO More fines,
GM 2.15 Cc<1
21 SE/0539 -do- 7790 SM 36 51 09 04 13 NP NP NP 57.14 0.26 8.0/ - NO More fines,
1.96 Cc<1
22 SE/0540 -do- 18330 SM 30 53 12 05 17 NP NP NP 46.77 0.35 7.8/ - NO More fines,
1.95 Cc<1
23 SE/0541 -do- 5220 SM 18 65 13 04 17 NP NP NP 5.94 1.48 8.4/ - NO More fines
2.22
24 SE/0542 -do- Km459 SP- 25 63 09 03 12 NP NP NP 40.0 0.37 8.4/ - NO More fines,
/12-13 SM 2.04 Cc<1
25 SE/0544 -do- 20960 SM 25 61 10 04 14 NP NP NP 5.94 2.39 8.8/ - NO More fines
2.08
26 SE/0545 -do- 14860 SP- 22 67 07 04 11 NP NP NP 5.71 2.23 8.6/ - NO -
SM 2.18
27 SE/0546 -do- 14480 SP- 22 67 08 03 11 NP NP NP 5.35 2.51 8.6/ - N-O -
SM 2.10
28 SE/0547 -do- 4260 SM 31 52 11 06 17 NP NP NP 27.69 0.25 8.4/ - NO More fines,
1.96 Cc<1
29 SE/0549 -do- 2340 SM 22 65 10 03 13 NP NP NP 5.51 1.24 7.6/ - NO More fines
2.21
30 SE/0551 -do- Km SM 25 60 11 04 15 NP NP NP 30.0 0.24 9.4/ - NO More fines,
467/2-6 2.11 Cc<1
XI. SOUTH EAST CENTRAL RAILWAY
1 SEC/0755 Ambikapur-Bisram 1700 SP- 37 52 08 03 11 NP NP NP 57.10 0.52 7.2/ - YES Cc<1
pur new line SM 2.19

45
2 SEC/0756 -do- 3550 SP- 30 63 07 00 07 NP NP NP 27.0 0.75 - 1.81/ YES Cc<1
SM 1.58
3 SEC/0757 -do- 4.25 SP- 13 76 10 00 10 NP NP NP 22.50 2.11 - 1.91/ YES -
SM 1.57
4 SEC/0758 -do- 4650 SP- 24 54 18 03 21 33 18 15 113.3 4.80 6.4/ - NO More fines
SM 2.21
5 SEC/0759 -do- 6460 SP- 24 29 12 05 17 26 16 10 100.0 5.27 6.9/ - NO More fines
SM 2.18
6 SEC/0687 Dagori-Nipania 743960 SM 43 39 13 05 18 43 19 24 954.0 5.02 8.2/ - NO More fines
3rd line 2.19
7 SEC/0689 -do- 747820 SP- 16 57 22 05 27 37 22 15 383.0 1.14 11.0/ - NO More fines
SM 2.16
8 SEC/0691 -do- 747040 SW- 24 58 08 10 18 34 21 13 1071.0 14.58 10.2/ - NO More fines
SM 197
XII. SOUTHERN RAILWAY
1 SR/0473 Bangarpet-Kuppam 281500 SM 08 7 13 01 14 NP NP NP 18.46 1.01 8.20/ - NO More fines
doubling 2.11
2 SR/0474 -do- 276100 SM 05 80 14 01 15 NP NP NP 18.18 1.43 8.0/ - NO More fines
2.13
3 SR/0475 -do- 272050 SM 19 67 13 01 14 NP NP NP 30.88 1.12 8.4/ - NO More fines
2.16
4 SR/0476 -do- 268100 SM 06 79 14 01 15 NP NP NP 27.27 1.48 8.6/2. - NO More fines
14
5 SR/0692 Shoranoor-Manga 175925 SM 13 19 66 02 68 NP NP NP 5.0 4.13 11.5/ - NO More fines
Lore doubling 2.07
6 SR/0694 -do- 176825 SP- 35 47 17 01 18 41 33 08 65.0 0.49 11.5/ - NO More fines,
SM 2.02 Cc<1
7 SR/0696 -do- 177900 SM 16 50 34 00 34 NP NP NP 41 0.41 8.4/ - NO More fines,
2.22 Cc<1
8 SR/0698 -do- 178150 ML- 21 13 61 05 66 30 23 07 11.0 9.0 10.7/ - NO More fines
CL 2.04
9 SR/0719 -do- 22050 SW- 30 63 07 00 07 NP NP NP 17.27 2.02 10.8/ - YES -
SM 2.02
10 SR/0720 -do- 30800 SM 20 38 25 17 42 45 30 15 - - 17.2/ - NO More fines
1.76
11 SR/0721 -do- Stone SW- 01 90 09 00 09 NP NP NP 6.25 1.10 - 1.92/ YES -
dust SM 1.50

46
XIII. SOUTH WESTERN RAILWAY
1 SW/0482 Hubli - Ankola 11550 GC 56 11 18 15 33 44 22 22 - - 12.6/ - NO More fines
new line 2.06
2 SW/0483 -do- 11250 GC 52 35 10 03 13 42 20 22 14.39 6.53 10.2/ - NO More fines
2.17
3 SW/0484 -do- 12050 GC 40 32 17 11 28 49 25 24 32.0 8.68 11.2/ - NO More fines
2.08
4 SW/0485 -do- 13175 GC 40 36 15 09 24 43 22 21 14.39 6.53 10.2/ - NO More fines
2.17
5 SW/0486 -do- 14275 GC 61 10 15 14 29 48 26 22 - - 11.2/ - NO More fines
2.07
6 SW/0490 -do- 17525 GC 49 33 15 03 18 47 25 22 100.0 13.6 9.2/ - NO More fines
2.14
XIV. WESTERN RAILWAY
1 WR/0079 Borivali-Virar 13720 SW- 11 79 10 00 10 NP NP NP 16.25 1.05 - 2.15/ YES -
quadrupling SM 1.73
2 WR/0080 -do- 18680 SW- 02 92 06 00 06 NP NP NP 7.73 1.13 - 2.07/ YES -
SM 1.70
3 WR/0082 -do- 20460 SW- 02 91 07 00 07 NP NP NP 9.47 0.47 - 2.06/ YES Cc<1
SM 1.07
4 WR/0083 -do- 22140 SW- 01 92 08 00 08 NP NP NP 10.0 1.06 - 2.12/ YES -
SM 1.73
5 WR/0084 -do- 23880 SW- 15 75 10 00 10 NP NP NP 26.67 1.07 - 2.14/ YES -
SM 1.69

TOTAL SAMPLES TESTED: 258

47
DETAILS OF BLANKET TEST RESULTS TESTED AT G.E. LABORATORY IN YEAR 2004

Cu

enveloping curves
Passing 75µ sieve
Classification

γ max / γ min
PI
Sample No.

Lies within

Remarks
Location
2004/---

OMC /
Project

Gravel

MDD
S.No.

(Ch.)

Sand

Clay
Silt

LL

PL

Cc
I. CENTRAL RAILWAY
1 CR/320 Panvel-Karjat new 1725 SM 04 77 19 00 19 NP NP NP 24.86 1.42 11.0/ - NO More fines
line 2.00
2 CR/321 -do- 3550 SM 04 69 24 00 24 NP NP NP 34.78 1.39 12.6/ - NO More fines
1.94
3 CR/322 -do- 7435 SM 07 72 21 00 21 NP NP NP 30.36 1.68 11.2/ - NO More fines
2.01
4 CR/323 -do- 13780 SM 25 55 20 00 20 NP NP NP 79.31 1.26 10.0/ - NO More fines
2.05
5 CR/324 -do- 16290 SM 08 62 29 01 30 NP NP NP 38.89 0.45 12.5/ - NO More fines
2.01 Cc<1
6 CR/325 -do- 20040 MI 06 41 46 07 53 NP NP NP 51.52 2.18 18.6/ - NO More fines
1.70
II. EAST CENTRAL RAILWAY
1 EC/197 Rajgir-Tilaiya new 37800 SP- 24 68 08 00 08 NP NP NP 7.22 0.52 7.8/ - YES Cc<1
SM 2.10
2 EC/198 -do- 40000 SP- 34 57 09 00 09 NP NP NP 29.76 0.72 7.8/ - NO Cc<1
SM 2.11
3 EC/201 -do- 421000 SP- 22 66 12 00 12 NP NP NP 22.06 0.71 6.8/ - YES Cc<1
SM 2.18
4 EC/203 -do- 44600 SC 17 66 17 00 17 26 17 09 20.0 2.02 6.8/ - NO More fines
2.20
5 EC/217 Ara-Sasaram 96.370 SM 00 82 18 00 18 NP NP NP 12.81 1.71 - 1.94/ NO More fines
new line 1.53

48
6 EC/219 -do- 90.700 SM 00 80 13 00 13 NP NP NP 12.90 1.26 - 1.93/ NO More fines
1.53
7 EC/221 -do- 88.525 SM 01 83 13 03 16 NP NP NP 7.58 1.37 - 1.93/ NO More fines
1.50
8 EC/223 -do- 84.725 SM 01 84 15 00 15 NP NP NP 8.06 1.16 - 2.03/ NO More fines
1.53
9 EC/225 -do- 79.050 SM 09 74 17 00 17 NP NP NP 16.32 1.87 - 1.92/ NO More fines
1.53
10 EC/40 Karpurigram- Jamalp SP- 05 85 10 00 10 NP NP NP 17.33 0.86 - 1.93/ YES Cc<1
Siho patch ur Q. SM 1.58
doubling dust
11 EC/41 -do- -do- SM 04 80 16 00 16 NP NP NP 20.0 1.71 7.6/ - NO More fines
2.04
12 EC/42 -do- -do- SW- 06 83 11 00 11 NP NP NP 14.29 1.12 - 1.93/ YES -
SM 1.60
III. EAST COAST RAILWAY
1 Eco/123 Cuttack-Badakhand 14160 SM 35 52 10 03 13 NP NP NP 43.28 0.49 6.6/ - NO More fines
yat doubling 2.17 Cc<1
2 ECo/124 -do- 18860 SP- 38 51 10 01 11 NP NP NP 56.34 0.34 6.8/ - YES Cc<1
SM 2.19
3 ECo/125 -do- 21460 SW- 16 72 09 02 11 NP NP NP 6.71 2.56 8.0/ - NO -
SM 2.20
4 ECo/126 -do- 28920 SM 08 77 12 03 15 NP NP NP 5.41 2.40 8.8/ - NO More fines
2.09
5 Eco/127 -do- 33000 SP- 43 46 10 01 11 NP NP NP 87.14 0.23 6.6/ - YES Cc<1
SM 2.27
6 ECo/133 Karpurigram- 187.5 SM 14 69 17 00 17 NP NP NP 22.6 0.56 - 1.97/ NO More fines
Siho doubling 1.57 Cc<1
7 ECo/135 -do- 166.5 SM 19 66 15 00 15 NP NP NP 24.60 0.65 - 1.94/ NO More fines
1.53 Cc<1
8 ECo/137 -do- 155.25 SM 03 70 27 00 27 NP NP NP 30.50 0.55 10.5/ - NO More fines
1.88 Cc<1
9 ECo/256 Rahama- 820 SM 20 64 09 07 16 NP NP NP 45.56 13.1 8.8/ - NO More fines
Paradeep sec. 204
10 ECo/257 -do- 3940 SM 28 56 12 04 16 NP NP NP 6.51 1.71 8.8/ - NO More fines
2.02
11 ECo/259 -do- 7920 SM 11 76 10 03 13 NP NP NP 4.84 2.67 8.4/ - NO More fines

49
2.01
12 ECo/261 -do- 8080 SM 21 64 11 04 15 NP NP NP 6.23 1.73 9.8/ - NO More fines
2.0
13 ECo/263 -do- 14420 SW- 18 72 10 00 10 NP NP NP 5.07 2.75 9.0/ - NO -
SM 2.0
14 ECo/265 -do- 18220 SP- 40 50 10 00 10 NP NP NP 63.24 0.24 9.8/ - NO Cc<1
SM 2.1
15 ECo/267 -do- 20960 SM 16 70 08 06 14 NP NP NP 5.54 2.67 9.8/ - NO More fines
2.12
IV. EASTERN RAILWAY
1 ER/152 Sheorapalli- 4975 SP 10 87 03 00 03 NP NP NP 4.48 1.61 - 1.89/ YES -
Tarkeshwar 1.43
doubling
2 ER/153 -do- 3950 SW- 07 86 07 00 07 NP NP NP 9.29 1.98 - 1.92/ YES -
SM 1.50
3 ER/154 -do- 3380 SW- 11 81 08 00 08 NP NP NP 16.0 1.00 - 1.96/ YES -
SM 1.52
4 ER/157 -do- 1630 SP- 12 83 05 00 05 NP NP NP 5.00 1.42 - 1.86/ YES -
SM 1.43
5 ER/158 -do- 1435 SW- 07 84 09 00 09 NP NP NP 21.43 2.38 - 1.98/ YES -
SM 1.58
6 ER/270 Sonarpur-Ghutiar 21.050 SW- 03 89 08 00 08 NP NP NP 9.7 1.06 - 1.85/ YES -
Sharif SM 1.5
7 ER/273 -do- 28.120 SW- 12 79 09 00 09 NP NP NP 9.38 1.55 - 1.88/ YES -
SM 1.5
8 ER/275 -do- 28.660 SW- 03 87 10 00 10 NP NP NP 14.67 2.24 - 1.89/ YES -
SM 1.5
9 ER/94 Laxmikantpur- 40.900 SM 03 81 16 00 16 NP NP NP 12.50 1.32 - 2.14 / NO More fines
Nankhana new 1.64
line
10 ER/95 -do- 35.600 SM 07 81 12 00 12 NP NP NP 27.24 3.48 - 1.73/ YES -
1.42
V. NORTH CENTRAL RAILWAY
1 NC/77 Agra Cantt- 1000 SM 15 68 14 03 17 NP NP NP 23.75 2.78 - 1.95/ NO More fines
Etawah new line 1.65
2 NC/79 -do- 1700 SM 17 69 14 00 14 NP NP NP 5.33 1.02 - 1.85/ NO More fines
1.57

50
3 NC/80 -do- 3900 SM 24 58 15 03 18 NP NP NP 55.17 0.36 - 1.80/ NO More fines
1.50 Cc<1
4 NC/83 -do- 4900 SM 41 45 13 01 14 NP NP NP 73.08 1.17 - 1.99/ NO More fines
1.53
VI. NORTH EASTERN RAILWAY
1 NE/144 Gorakhpur-Domin 1850 SP- 29 65 06 00 06 NP NP NP 12.84 0.31 - 2.06/ YES Cc<1
garh patchdoubling SM 1.70
2 NE/145 -do- 2400 SP- 35 60 05 00 05 NP NP NP 15.65 0.20 - 1.99/ YES Cc<1
SM 1.76
3 NE/147 -do- 3575 SP- 40 54 06 00 06 NP NP NP 21.36 0.41 - 2.07/ YES Cc<1
SM 1.85
4 NE/148 -do- 4000 SP- 37 55 08 00 08 NP NP NP 15.42 0.23 - 2.10/ YES Cc<1
SM 1.80
5 NE/170 JarwalRoad- 46950 SW- 30 62 08 00 08 NP NP NP 21.43 1.20 6.6/ - YES -
Burhwal Patch SM 2.09
doubling
6 NE/171 -do- 47400 SW- 28 62 10 00 10 NP NP NP 36.25 1.55 7.0/ - NO -
SM 2.11
7 NE/172 -do- 47910 SW- 20 71 09 00 09 NP NP NP 10.0 1.06 - - NO -
SM
8 NE/173 -do- 48350 SW- 36 56 08 00 08 NP NP NP 22.22 2.35 6.8/ - YES -
SM 2.04
9 NE/174 -do- 49025 SW- 30 63 07 00 07 NP NP NP 17.0 1.06 6.8/ - YES -
SM 2.13
10 NE/046 Jarwal Road- 2775 SP- 20 74 06 00 06 NP NP NP 8.95 0.47 - 1.91/ YES Cc<1
Burhwal doubling SM 1.67
11 NE/52 47560 SW- 25 65 10 00 10 NP NP NP 40.0 1.88 7.0/ - YES -
SM 2.10
12 NE/53 -do- 49725 SP- 41 50 09 00 09 NP NP NP 45.45 4.65 10.0/ - YES -
SM 2.09
13 NE/54 -do- 49350 SW- 31 59 10 00 10 NP NP NP 46.05 1.35 12.5/ - YES -
SM 2.04
14 NE/55 -do- 48900 SP- 30 63 07 00 07 NP NP NP 23.85 0.62 8.0/ - YES Cc<1
SM 2.03
VII. NORTHERN RAILWAY
1 NR/115 Una-Himachal- 25100 GW 69 29 02 00 02 NP NP NP 103.45 1.66 - 2.01/ YES -
Chyram new line 1.88

51
2 NR/116 -do- 25750 GP 51 45 04 00 04 NP NP NP 66.67 0.04 - 2.01/ YES Cc<1
1.88
3 NR/117 -do- 27300 GP 56 42 02 00 02 NP NP NP 52.59 0.02 - 1.97/ YES Cc<1
1.88
4 NR/118 -do- 33425 GP- 66 29 05 00 05 NP NP NP 22500 0.31 - 2.00/ YES Cc<1
GM 1.97
5 NR/119 -do- 29325 GP 55 43 02 00 02 NP NP NP 61.54 0.03 - 1.99/ YES Cc<1
1.87
6 NR/121 -do- 21350 GP- 52 43 05 00 05 NP NP NP 69.57 0.04 - 2.13/ YES Cc<1
GM 1.93
7 NR/185 Jammu-Udham 30950 SM 15 69 14 02 16 NP NP NP 12.17 0.74 6.0/ - NO More fines
Pur new line 2.15 Cc<1
8 NR/ 188 -do- 47505 SM 15 66 19 00 19 NP NP NP 82.14 0.30 5.6/ - NO More fines
2.136 Cc<1
9 NR/189 -do- 49650 SM 08 74 18 00 18 NP NP NP 13.21 1.05 5.6/ - NO More fines
2.14
10 NR/245 Amroha-Kanka 46975 SP- 38 55 07 00 07 NP NP NP 22.63 0.19 - - YES Cc<1
ther doubling SM
11 NR/246 -do- 47320 SP- 47 47 06 00 06 NP NP NP 30.5 0.40 - 2.0/ YES Cc<1
SM 1.9
12 NR/247 -do- 48550 SP- 38 54 08 00 08 NP NP NP 22.78 0.20 - 2.02/ YES Cc<1
SM 1.87
13 NR/250 -do- 57850 SP- 47 48 05 00 05 NP NP NP 29.55 0.33 - 2.01/ YES Cc<1
SM 1.88
14 NR/251 -do- 58125 SP- 46 47 07 00 07 NP NP NP 33.89 0.17 - - YES Cc<1
SM
15 NR/252 -do- 58875 GP- 53 41 06 00 06 NP NP NP 35.22 0.48 - 2.02/ YES Cc<1
GM 1.88
16 NR/67 Moradabad- 27175 GP- 53 42 05 00 05 NP NP NP 37.5 0.38 - 2.06/ YES Cc<1
Amroha doubling GM 1.87
17 NR/68 -do- 26425 GP- 72 23 05 00 05 NP NP NP 50.0 5.7 - 2.07/ YES -
GM 1.87
18 NR/69 -do- 24625 GP- 60 35 05 00 05 NP NP NP 57.14 0.78 - 2.07/ YES Cc<1
GM 1.87
19 NR/71 -do- 13150 GP- 53 40 07 00 07 NP NP NP 130.0 0.09 - 2.10/ NO Cc<1
GM 1.77
20 NR/73 -do- 14775 GW- 68 27 05 00 05 NP NP NP 66.67 2.97 - 2.11/ YES -
GM 1.883

52
21 NR/75 -do- 4225 SP- 35 57 08 00 08 NP NP NP 16.67 0.21 - 1.99/ YES Cc<1
SM 1.80
VIII. NORTH WESTERN RAILWAY
1 NW /291 -do- 98265 CL 00 48 32 20 52 26 14 12 -- - - - NO More fines

2 NW /292 -do- 98310 GM 49 35 16 00 16 NP NP NP 282.05 0.20 6.0/ - NO More fines


2.19 Cc<1
3 NW /293 -do- 99040 GM 34 22 44 00 44 NP NP NP 188.89 0.15 - - NO More fines
Cc<1
4 NW /294 -do- 102250 GP- 68 20 12 00 12 NP NP NP 295.77 9.68 7.5/ - NO -
GM 2.10
5 NW /295 -do- 102420 GP- 61 27 12 00 12 NP NP NP 263.89 0.12 - - NO Cc<1
GM
6 NW /296 -do- 102490 GM 42 27 31 00 31 NP NP NP 100.0 0.01 7.5/ - NO More fines
2.07 Cc<1
7 NW/290 Chittaurgarh-Udai 98255 GM 40 20 40 00 40 NP NP NP 546.51 0.04 - - NO More fines
Pur gauge conv. Cc<1
IX. SOUTH CENTRAL RAILWAY
1 SC/106 Obulararipalli- 189742 GP- 48 42 07 03 10 44 20 24 77.33 15.54 8.6/ - NO More fines
Pullampet doubling GC 2.16 Cc<1
2 SC/107 -do- 191270 SP 37 58 05 00 05 29 19 10 14.62 0.39 8.8/ - YES Cc<1
2.14
3 SC/108 -do- 194480 SP- 31 62 07 00 07 32 17 15 8.46 0.32 - 1.94/ NO More fines
SC 1.60 Cc<1
4 SC/109 -do- 193950 SW- 29 61 10 00 10 NP NP NP 32.89 1.42 - 1.92/ YES -
SM 1.60
5 SC/110 -do- 200075 SC 11 40 28 21 49 47 21 26 - - 9.6/ - NO More fines
2.01
6 SC/113 Gooty-Renigunta 221275 SC 40 44 13 03 16 26 14 12 104.35 3.43 - - NO More fines
patch doubling
7 SC/114 -do- 221700 SW- 34 19 07 00 07 NP NP NP 11.30 2.41 - - YES -
SM
8 SC/168 Guntakal-Hospet Km SP- 33 58 09 00 09 32 19 13 43.75 3.29 7.40/ - NO More fines
doubling 178/1-2 SC 2.22
9 SC/169 -do- Km GP- 50 41 07 02 09 45 26 19 60.63 0.78 8.0/ - NO More fines
197/5 GC 2.14 Cc<1
10 SC/175 Gudur-Renigunta- 90725 SW- 18 72 10 00 10 30 18 12 24.0 2.85 8.0/ - NO More fines

53
Tirupati doubling SC 2.11
11 SC/176 -do- 89950 SW- 30 62 08 00 08 32 19 13 20.67 1.78 8.2/ - NO More fines
SC 2.12
12 SC/177 -do- 88975 SW- 18 72 10 00 10 38 18 20 24.0 2.67 8.0/ - NO More fines
SC 2.10
13 SC/178 -do- 86200 SW- 26 67 07 00 07 33 20 13 10.71 1.11 8.0/ - NO More fines
SC 2.12
14 SC/179 -do- 84600 SW- 17 73 10 00 10 38 20 18 22.67 2.92 8.0/ - NO More fines
SC 2.12
15 SC/283 -do- Km SW- 05 85 10 00 10 NP NP NP 10.53 1.42 - 1.78/ NO -
201/13 SM 1.48
16 SC/284 -do- Km SW- 20 72 08 00 08 NP NP NP 13.68 1.05 - 1.82/ NO -
207/11 SM 1.53
17 SC/285 -do- Km SW- 34 56 10 00 10 NP NP NP 50.67 2.25 - 1.89/ NO -
222/5 SM 1.43
18 SC/286 -do- - SW- 25 66 09 00 09 20 13 07 30.59 2.22 - 1.88/ YES More fines
SM 1.57
19 SC/287 -do- - SP- 46 49 05 00 05 NP NP NP 5.73 1.48 - 1.64/ NO -
SM 1.27
20 SC/288 -do- - GP- 72 26 02 00 02 NP NP NP 3.20 1.30 - 2.09/ NO -
GM 1.70
21 SC/289 -do- - SP- 32 58 10 00 10 NP NP NP 50.67 3.10 - 1.78/ NO -
SC 1.43
22 SC/331 Gangayapalli- Km SC 09 75 11 05 16 31 14 17 34.88 2.73 8.0/ - NO More fines
Kamlapuram 281/ 2.24
Sec. 5-6
23 SC/332 -do- Km SP- 30 59 08 03 11 32 16 16 25.71 3.35 7.60/ NO More fines
282/7 SC 2.23
24 SC/339 Yerragunta- 121.40 SC 24 60 16 00 16 28 15 13 29.70 0.97 7.60/ - NO More fines
Jammaladugu sec 0 2.18 Cc<1
25 SC/340 -do- 115.57 SW- 30 60 10 00 10 25 13 12 28.0 1.02 7.20/ - NO More fines
5 SC 2.19
26 SC/341 -do- 11.850 SP- 22 70 08 00 08 NP NP NP 6.32 0.63 8.40/ - YES Cc<1
SM 2.10
X. SOUTH EAST CENTRAL RAILWAY
1 SE /299 Korba-Gevra Km SC 19 54 16 11 27 29 15 14 185.7 23.44 8.60/ - NO More fines
Road doubling 707/5-6 2.17

54
2 SE/300 -do- Km SC 14 61 16 09 25 26 16 10 233.3 21.0 8.80/ - NO More fines
706/14 2.18
3 SE/301 -do- Km SC 14 58 16 12 28 21 10 11 453.3 22.06 7.20/ - NO More fines
705/21 2.25
XI. SOUTHERN RAILWAY
1 SR/307 Tanur-Parpangadi 57275 GM 62 25 11 02 13 52 29 23 194.44 3.97 12.6/ - NO More fines
doubling 2.06
2 SR/309 -do- 55700 GC 44 40 14 02 16 32 18 14 85.71 0.29 12.4/ - NO More fines
2.08 Cc<1
3 SR/311 -do- 52925 GC 47 31 19 03 22 30 20 10 104.48 0.32 12.8/ - NO More fines
2.05 Cc<1
4 SR/313 Cannanur- 176800 SM 38 41 19 01 20 35 20 15 68.12 0.40 9.60/ - NO More fines
Vallapatnam 2.17 Cc<1
doubling
5 SR/314 -do- 177950 GM 54 28 17 01 18 49 33 16 115.7 2.98 13.0/ - NO More fines
2.01
6 SR/315 -do- 180775 SC 27 37 22 14 36 47 23 24 - - 11.0/ - NO More fines
2.01 Cc<1
7 SR/45 Thirumalai-Velach 18495 SC 30 46 13 11 24 44 24 20 2727.3 18.94 9.60/ - NO More fines
phase-II 2.04
8 SR/47 -do- 15860 SW- 08 82 10 00 10 NP NP NP 22.67 1.32 - 1.88/ YES -
SM 1.53
9 SR/48 -do- 19580 SM 07 80 13 00 13 NP NP NP - - - 1.99/ NO More fines
1.43
10 SR/49 -do- 23280 SW- 27 63 10 00 10 NP NP NP 25.68 1.03 - 2.02/ YES -
SM 1.63
11 SR/50 -do- 20460 SP- 15 76 09 00 09 NP NP NP 20.51 0.98 - 2.17/ YES Cc<1
SM 1.73
12 SR/51 -do- 23880 SW- 41 50 09 00 09 NP NP NP 66.67 1.21 - - YES -
SM
13 SR/574 Taramani- 16950 SC 36 49 08 07 15 40 17 23 122.86 11.23 7.50/ - NO More fines
Velachari sec 2.35
MRTS,Chennai

14 SR/576 -do- 17400 SC 30 48 16 06 22 37 18 19 124.0 1.67 8.0/ - NO More fines


2.13

55
15 SR/580 -do- 16940 SC 29 49 14 08 22 38 19 19 800.0 6.13 7.5/ - NO More fines
2.20
16 SR/58 Ernaculam-Mullan 2160 GP- 59 32 09 00 09 24 16 08 96.34 4.13 7.0/ - NO More fines
truti doubling GC 2.16
17 SR/60 -do- 3025 SC 27 56 13 04 17 36 21 15 29.51 0.83 14.2/ - NO More fines
1.82 Cc<1
18 SR/62 -do- 2560 SC 20 56 14 10 24 46 24 22 700.0 30.04 10.2/ - NO More fines
2.03
XII. SOUTH WESTERN RAILWAY
1 SW/ 11 Hubli- Ankola 2300 GC 51 32 12 05 17 46 23 23 232.6 2.81 11.6/ - NO More fines
new line 2.09
2 SW/ 12 -do- (R1) 3100 GC 45 39 09 07 16 41 21 20 96.7 8.30 11.0/ - NO More fines
2.12
3 SW /15 -do- (R1) 23300 SM 11 72 17 00 17 42 31 11 17.6 1.03 12.0/ - NO More fines
2.03
4 SW/ 16 -do- (R15) 23300 SW- 26 64 10 00 10 39 28 11 28.0 2.14 12.0/ - NO More fines
SM 2.01
5 SW/ 18 -do- (R16) 24075 SW- 04 87 09 00 09 39 28 11 13.48 1.28 9.60/ - NO More fines
SM 2.19
6 SW/ 22 -do- (R17) 26300 GM 35 27 26 12 38 62 32 30 3363.6 1.10 10.8/ - NO More fines
2.05
7 SW/24 -do- (R19) 27650 MH 06 25 63 06 69 52 31 21 23.0 0.41 10.0/ - NO More fines
1.92 Cc<1
8 SW/205 Yashwantpur- 12625 SC 25 56 19 00 19 32 19 13 34.0 0.51 6.30/ - NO More fines
Tumkur sec. 2.12 Cc<1
9 SW/207 -do- 15200 SW- 40 52 08 00 08 26 14 12 33.33 1.92 6.0/ - NO More fines
SC 2.19
10 SW/209 -do- 18100 SC 31 47 17 05 22 35 18 17 500.0 5.71 8.8/ - NO More fines
2.11
11 SW/211 -do- 21400 GW- 53 38 09 00 09 30 18 12 69.23 1.44 7.40/ - NO More fines
GC 2.17
12 SW/213 Bangarpet- 262100 SW- 10 82 08 00 08 NP NP NP 17.39 1.09 7.5/ - YES -
Kuppam sec. SM 2.15
13 SW/214 -do- 259850 SW- 14 77 09 00 09 NP NP NP 17.24 1.11 7.20/ - YES -
SM 2.15
14 SW/215 -do- 256400 SW- 06 84 10 00 10 NP NP NP 16.00 1.07 6.80/ - YES -
SM 2.15

56
15 SW/216 -do- 252725 SW- 08 84 08 00 08 NP NP NP 17.0 109 7.0/ - YES -
SM 2.16

XIII. WESTERN RAILWAY


1 WR/191 Rajulacity-Pipavav 22400 SW- 18 77 05 00 05 NP NP NP 7.78 1.03 8.40/ - YES -
port new line SM 2.15
2 WR/ 192 -do- 21310 SP- 35 56 09 00 09 NP NP NP 38.96 0.44 - - YES Cc<1
SM
3 WR/193 -do- 20215 SW- 16 77 07 00 07 NP NP NP 6.88 1.05 - - YES -
SM
4 WR/194 -do- 14915 SP- 33 60 07 00 07 NP NP NP 23.85 0.27 11.4 / - YES Cc<1
SM 1.93

TOTAL SAMPLES TESTED: 155

57
(This Annexure-I is to be placed in office copy only)
ANNEXURE-II

Summary of samples of Blanket Material tested in RDSO in year 2002

Rates of blanket material at

No. of samples conforming

conforming to specifications

Type of sub-grade soil


No. of samples tested

Thickness of blanket

Thickness of blanket
site ( Rs. per cu. m)

No. of samples non


Name of Projects

to specifications

provided (cm)
required (cm)

Remarks
Railway
S.No.

I. EASTERN RAILWAY
1 ER Ara- 200/- 2 1 1 CI, 100 100 More fines in one
Sasaram CL sample
new line
2 ER Akra-New 640/- 6 5 1 SP 45 100 Out of curves, Cu<4
Alipore
3 ER Gurap- 149/-to 3 2 1 CI 100 30 Less blanket
Saktigarh 151/- & to thickness, out of
section 448/- to 100 curves
710/-
II. NORTHEAST FRONTIER RAILWAY
1 NF NJP-SGUJ- - 4 - 4 SM, 60 100 Cc<1 in all samples
NBQ ML to
section 100
2 NF NJP-APDJ - 7 - 7 SM, 60 100 More fines in 3
section ML to samples, Cc<1
100
III. NORTHERN RAILWAY
1 NR Jammu- - 2 - 2 CL, 60 30 Less blanket thick
Udhampur SM, to to ness, more fines,
rail link SC 100 100 Cc<1
2 NR Amroha- - 4 3 1 SM, 60 30 to More fines in one
Kankathar SC 100 sample
doubling
3 NR Udhampur- - 12 8 4 CL, 60 30 Less blanket thick
Katra new SM, to to ness, more fines in 2
line SC 100 100 samples, Cc<1
4 NR Moradabad - 3 2 1 SM, 60 to 30 to Less blanket
-Amroha SC 100 100 thickness, more fines
doubling in one sample, Cc<1
5 NR Hamirpur 426/- 3 2 1 - - - More fines in one
quarry sample
material

58
IV. SOUTH CENTRAL RAILWAY
1 SC Gudur- 83/- to 4 2 2 CL, SC 60 60 Less blanket
Renigunta 143/- to to thickness in loop line,
doubling 100 100 more fines in 2
samples
V. SOUTH EASTERN RAILWAY
1 SE Sambalpur- - 2 - 2 CI, 60 30 Less blanket
Talchar SM, to to thickness, more fines,
bye- pass SC 100 100 out of curves
line
2 SE Bhilai- - 3 2 1 CI, 60 30 Less blanket
Sarona CI, SC to to thickness, more fines
IIIrd line 100 100 in one sample, Cc<1
3 SE Champa- - 2 - 2 CI, CL 100 80 Less blanket thick
Bolpur to ness, more fines, out
Bye-pass 100 of curves
line
4 SE Korba- 38/- to 2 - 2 ML 100 80 Less blanket
Gevra 52/- to thickness, Cc<1 for
Road new 100 both samples, out of
line curves
5 SE Bankra- 448/- 2 - 2 CI 100 30 Less blanket
Nayabaz- to thickness, more fines
Baltikuri 100 in one sample, Cc<1
section in both samples
VI. SOUTHERN RAILWAY
1 SR Mayyil- Crusher 4 - 4 - - - Out of curves for 2
Apayavoor material samples, more fines,
crusher Cc<1
VII. WESTERN RAILWAY
1 WR Kalapipal- Quarry 4 1 3 - - - Cu<4 in 3 samples
Phanda dust/
doubling blanket
TOTAL 69 29 40
SAMPL
ES
PERCE - 42% 58%
NTAGE

59
Summary of samples of Blanket Material tested in RDSO in year 2003

conforming to specifications
Rates of blanket material at

No. of samples conforming

Type of sub-grade soil

Thickness of blanket
No. of samples tested

Thickness of blanket
No. of samples non
to specifications
Name of Project

provided (cm)
required (cm)
site (Rs/cu.m)

Remarks
Railway
S. No.

I. CENTRAL RAILWAY
1 CR Panvel-Karjat - 3 - 3 SM, 60 to 100 More fines, Cc<1
new line MI, 100
ML
2 CR
Talvadiya- - 10 - 10 CH 100 45 to Less blanket
Khirkiya 60 thickness, more fines
main line in all samples, Cc<1
diversion
II. EAST CENTRAL RAILWAY
1 EC Parasbazar- - 2 - 2 CI, 100 100 Out of curves, Cc<1
Punpun CL
doubling
III. EASTCOAST RAILWAY
1 ECo Raghunathpu - 4 - 4 CI, 100 100 Plastic fines 15-22%,
r- CL Cc<1
GorakhNath
rehabilitation
2 ECo CTC-RTC - 3 - 3 SM, 100 100 More fines, Cc<1
doubling ML,
CL
IV. EASTERN RAILWAY
1 ER Akra-New 640/- 4 3 1 CI, 100 100 Cu<4 in one samples
Alipore CL,
doubling ML
2 ER Diversion of - 6 3 3 CL, 100 50 to Less blanket thick
HBC line CI 100 ness, more fines in 2
samples, Cc<1 in one
sample
3 ER Patna-Gaya - 4 - 4 CI, 100 100 More fines in all
doubling CL, samples
ML
4 ER Gurap- 1. 149 4 1 3 CI, 100 50 Less blanket
Saktigarh to 151 CH, to 100 thickness, more
IIIrd line 2. 148 ML fines, out of curves
to 710

60
5 ER Bolpur- 265/- 7 - 7 CH, 100 100 More fines in all
Ahmadpur CI samples
doubling
V. NORTHEASTERN RAILWAY
1 NE Gorakhpur- 814.50 5 - 5 CI, 100 60 Less blanket thick
Domingarh /- to CL, ness, more fines in 3
doubling 817/- ML samples, Cc<1 in one
sample
VI. NORTHEAST FRONTIER RAILWAY
1 NF Eklakhi- 518/- 10 2 8 CH, 100 100 Out of curves, Cc<1
Balurghat CI,
new line ML
2 NF Buniadpur- 518/- 2 - 2 CH, 100 100 Out of curves, Cc<1
Balurghat CI
new line

3 NF Daulatpur- - 5 5 - CH, 100 100 -


Buniadpur CI
new line
4 NF New - 7 - 7 ML, 100 100 Cc<1 in all samples
Jalpaiguri- SM
Nagarkota
section
5 NF New Jalpai - 6 1 5 ML, 60 100 More fines, Cc<1
guri-New SM to
Bongaigaon 100
G. C.(diver)
6 NF Buniadpur- 498/- to 14 1 13 CH, 100 100 Plastic fines 44% in 1
Balurghat 518/- CI sample, out of curves,
new line Cc<1
VII. NORTHERN RAILWAY
1 NR Utaratia- 426/- 4 2 2 CI, 100 60 Less blanket thick
Sultanpur CL, ness, out of curves,
doubling ML Cc<1
2 NR Zafrabad- 426/- 2 2 - CI, 100 60 Less blanket thickness
Utratia CL,
doubling ML
3 NR Chandigarh 457.50/- 13 6 7 SM, 60 100 Out of curves, Cc<1
-Ludhiana ML to in 7 samples
new line 100
4 NR JRC-PTK- 214/- to 4 2 2 GP- 45 45 Cc<1 in 2 samples
JAT 253/- GM, to to
doubling SP 60 60
5 NR Zafrabad- 426/- 3 3 - CL, 100 60 Less blanket thickness
Baksa ML
doubling
6 NR Utratia- 426/- 3 - 3 CL, 100 60 Less blanket thickness
Sultanpur ML
doubling
7 NR Lucknow- 426/- 3 2 1 CL, 100 60 Less blanket thickness,
Sultanpur- ML more fines in one
Zafrabad sample

61
doubling
VIII. NORTH WESTERN RAILWAY
1 NW Udaipur- - 8 3 5 SC, - No Plastic fines 20-23%,
Chittaurgarh SM, blanket out of curves, Cc<1
gauge conv GP- provide No blanket provided
(diversion) GM d
VIII. SOUTH CENTRAL RAILWAY
1 SC Gooty - 83/- to 10 4 6 SC 60 100 More fines
Renigunta 143/- 19-32% in 6 samples,
doubling Cc<1
2 SC Yeramaras- - 10 4 6 SC 60 60 More fines in 6
Yadalapur to samples
doubling 100
3 SC Ballapalli- 83/- 8 - 8 CH, 60 to 100 More fines in all
Pullampet SC 100 samples, Cc<1 in one
doubling sample
4 SC Nidigullu- - 5 1 4 SC, 60 100 More fines in 4
Venkatgiri CL to samples, Cc<1 in 2
doubling 100 samples
5 SC Yellakaru- - 4 - 4 SC 60 60 Less blanket thick
Srikalahasti to ness, more fines in 3
doubling 100 samples, Cc<1 in
other one sample
6 SC Bangarpet- 59/- 4 - 4 SW- 60 60 More fines, out of
Kuppam SM curves
doubling
7 SC Gudur- 83/- to 11 - 11 SC 60 60 More plastic fines
Renigunta 143/- to (10 - 31%) in all
doubling 100 samples
8 SC Pedapalli- 68/- to 13 4 9 ML, 60 100 More fines in 9
Karimnagar- 90/- SC to samples
Nizamabad 100
new line
IX. SOUTH EASTERN RAILWAY
1 SE Kesinga- - 8 - 8 CH, 100 100 More fines in 6
Norla Road CI samples, out of
doubling CL curves, Cc<1 in other
2 samples
2 SE Tamluk- - 3 1 2 CH, 100 100 More fines in one
Digha new CI sample, Cc<1 in other
line one sample
3 SE Rahama- 155/- to 19 1 18 SM, 60 100 More fines, out of
Paradeep 190/- SC curves, Cc<1
doubling
X. SOUTHEAST CENTRAL RAILWAY
1 SEC Dagori- 52/- 3 - 3 SM, 60 100 Plastic fines 18-27%
Nipania ML to in all samples, out of
IIIrd line 100 curves
2 SEC Ambikapur 5 1 4 SC, 60 to 100 More plastic fines
-Bisrampur CH, 100 17-31%, out of
new line GC curves, Cc<1 in 2
samples

62
XI. SOUTHERN RAILWAY
1 SR Bangarpeth - 4 - 4 CL, 100 100 More plastic fines in
-Kuppam SC all samples
doubling
2 SR Shoranur- - 7 2 5 CI, 60 100 More plastic fines
Mangalore MI, to 18-42% in 5
doubling SM 100 samples, Cc<1 in 2
samples
XII. SOUTH WESTERN RAILWAY
1 SW Hubli- - 6 - 6 CI, 60 30 Less blanket thick
Ankola MH, to to ness, more plastic
new line SC 100 100 fines 13 - 29% in all
samples
XIII. WESTERN RAILWAY
1 WR Borivali- - 5 4 1 CH, 100 100 Cc<1 in one sample
Virar CI
quadrupling
TOTAL 258 61 197
SAMPL
ES
PERCE - 24% 76%
NTAGE

63
Summary of samples of Blanket Material tested in RDSO in year 2004

Rates of blanket material

No.of samples non confo


No. of samples conform

rming to specifications

Type of sub-grade soil


No. of samples tested

Thickness of blanket

Thickness of blanket
at site (Rs per cu.m)

ing to specifications
Name of project

provided (cm)
required (cm)

Remarks
Railway
S. No.

I. CENTRAL RAILWAY
1 CR Panvel- - 6 - 6 SM, 100 100 Non plastic fines 19-
Karjat new ML, 53%, out of curves,
line MI Cc<1
II. EAST CENTRAL RAILWAY
1 EC Karpurigra - 3 1 2 CL, 100 100 More fines in one
m-Siho ML sample, Cc<1 in
patch other one sample
doubling
2 EC Ara- - 5 - 5 CI, 100 30 Less thickness of
Sasaram CI blanket, more fines
new line in all samples
3 EC Rajgir- - 4 - 4 CL, 100 60 Less thickness of
Tilaiya ML blanket, plastic fines
new line up to 17%, Cc<1
III. EASTERN RAILWAY
1 ER Laxmikant - 2 1 1 CI, 100 30 Less thickness of
pur- CH blanket, more fines
Nankhana
new line
2 ER Sheoraphul - 5 5 - CI, 100 30 Less thickness of
li- MI blanket
Tarkeshwar
doubling
3 ER Sonarpur- - 3 3 - CI, 100 30 Less thickness of
Ghubri MI blanket
Sharif
section
IV. EAST COAST RAILWAY
1 ECo Rahama- 238/- 7 1 6 SM, 60 to 100 More fines in 5
Paradeep SC, 100 samples, Cc<1 in
section ML one sample
2 ECo Cuttack- - 5 - 5 SM, 100 100 More fines in 3
Badakhany ML, samples, Cc<1 in
at doubling CI other 2 samples
3 ECo Karpurigra - 3 1 2 CI, 100 50 Less thickness of
m-Siho CL blanket, more fines
doubling in one sample, Cc<1

64
in other one sample
V. NORTH CENTRAL RAILWAY
1 NC Agra - 4 - 4 CL, 100 60 Less thickness of
Cantt- ML, blanket, more fines
Etawah CL- in all samples, Cc<1
new line ML
VI. NORTH EASTERN RAILWAY
1 NE Jarwal 793/- 4 2 2 CL, 100 100 Cc<1
Road- ML,
Burhwal CI
patch
doubling
2 NE Gorakhpur- - 4 - 4 CL, 100 60 Less thickness of
Domingarh CI, blanket, Cc<1 in all
patch ML samples
doubling
3 NE Jarwal 793/- 5 3 2 CL, 100 100 Out of curves in 2
Road- ML, samples
Burhwal CI
patch
doubling
VII. NORTHERN RAILWAY
1 NR Moradabad - 6 2 4 SM, 60 30 Less thickness of
-Amroha SC to blanket, Cc<1 in 4
doubling 100 samples
2 NR Una- 91/- 6 1 5 SM, 60 100 Cc<1 in 5 samples
Himachal- SC
Chyram
new line
3 NR Jammu- - 3 - 3 CL- 60 30 Less thickness of
Udhampur ML, to blanket, more fines
new line SC 100 in all samples &
Cc<1
4 NR Amroha- - 6 - 6 SM, 60 100 Cc<1 in all samples
Kankathar SC
doubling
VIII. NORTH WESTERN RAILWAY
1 NW Udaipur- - 7 1 6 CL, 30 Subgra More fines & Cc<1
Chittaurgar GM, to de soil in 5 samples, out of
h gauge GP- 100 said to curves in one sample
conv. GM be
(diversion) blanket
IX. SOUTH CENTRAL RAILWAY
1 SC Obulararip - 5 1 4 SM, 60 100 More fines, Cc<1,
alli- CL to out of curves
Pullampet 100
doubling
2 SC Gooty- - 2 1 1 SM, 60 100 More fines in one
Renigunta CL to sample
patch 100
doubling
3 SC Guntakal- 68/- 2 - 2 SM, 60 100 More fines, Cc<1
Hospet CL to

65
doubling 100
4 SC Renigunta- 83/- to 12 - 12 SC 60 100 Out of curves, more
Gooty 143/- plastic fines 7-10%
doubling
5 SC Gangayapa - 2 - 2 SC 60 100 More plastic fines
lli- 11-16%
Kamlapura
m section
6 SC Yeragunta- - 3 - 3 SC 60 100 More plastic fines 8-
Jammaladu 16%, Cc<1
gu section
X. SOUTHERN RAILWAY
1 SR SRR-MAQ - 3 - 3 CI, 100 100 More plastic fines in
doubling MH all samples, Cc<1
2 SR Cannanur- - 3 - 3 CI, 100 100 More plastic fines,
Vallapatna MI Cc<1
m doubling
3 SR Taramani- - 3 - 3 MH, 60 100 More plastic fines in
Velachari SC to all samples
new line, 100
MRTS
phase-II
4 SR Tirumalai- - 6 3 3 MH, 60 100 More fines in 3
Velachari SC to samples
phaseII 100
5 SR Ernakulum 115/- 3 - 3 SC 60 60 More fines in all
- samples
Mullantruti
doubling
XI. SOUTHEAST CENTRAL RAILWAY
1 SEC Korba- 38/- 3 - 3 ML 100 80 More fines in all
Gevra to 52/- to samples
Road 100
doubling
XII. SOUTH WESTERN RAILWAY
1 SW Hubli- - 7 - 7 CI, 60 30 Less thickness of
Ankola ML, to to blanket, more fines
new line MH, 100 100 09-69% in all
SC samples, Cc<1
2 SW Yashwantp - 4 - 4 SC 60 30 Plastic fines 8-22%
ur-Tumkur to in all samples
section 100
3 SW Bangarpet- - 4 4 - SW- 60 60 -
Kuppam SM
section
XIII. WESTERN RAILWAY
1 WR Vasai - 5 - 5 CH 100 100 More fines, out of
Road-Virar curves, Cc<1
quadruplin
g of track
2 WR Rajula city- - 4 2 2 SM 60 100 Cc<1 in 2 samples
Pipavav new
line

66
TOTAL SAMPLES 155 32 123

PERCENTAGE - 21% 79%

67