Procedure For WPS
Procedure For WPS
DOCUMENT NO.........
DOCUMENT REVISIONS
INDEX
1. SCOPE
2. REFERENCE DOCUMENTS
3. RESPONSIBILITY
6. RECORDS
1. SCOPE
2. REFERENCE DOCUMENTS
2.1. The following referenced documents are indispensable for the application
of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document
(including any amendments) applies.
3. RESPONSIBILITY
4.2. Identify the Welding processes to be followed and its variables. After
reviewing above information, welding Engineer shall identify the number of
WPS’s to be prepared.
4.5. Welding Engineer shall issue pWPS to welding station & instruct
Welder/Welding operator to follow pWPS parameters for procedure
qualification tests.
4.6. Welding Engineer shall fill the welding data sheet during welding.All
welding variables such as current, Voltage, travel speed, preheat,inter pass,
wire feed rate & mode of metal transfer etc as applicable.
4.7. Once welding, NDT &PWHT (if applicable) is completed; test coupon will
be sent to lab for test sample preparation & testing.
4.8. VT shall be done as per QW 144 for ASME SEC IX for ASME Job & EN
970& EN 571-1 for job according European standard or as specified by
client.
4.9. If tests are found satisfactory, test piece stamping shall be doneas per
ASME SEC IX or EN 15614-1
4.10. Once marking done, TPI/AI stamping shall transfer to all the test coupons
before cutting.
4.11. Sample preparation for mechanical test asapplicable shall be done as per
ASME Sec IX QW150, QW 160,QW 170 or EN 895,EN 910,EN 875,EN
1321 & EN 1043-1.
4.12. The extent of testing shall be as per applicable code and client
requirement.
4.13. Once samples are prepared, Welding Engineer shall verify its dimensions
& offer to AI/TPI for same (as required).
4.14. Testing shall be done in NABL LAB, in-house lab or any other lab
recommended by client.
4.17. If all the test results meet these specified requirements, Welding
Engineer shall prepare PQR in suggested format of ASME Sec IX or EN
15614. Heat input value shall be computed and indicated in PQR Format.
4.18. After establishing PQR, Welding Engineer shall update WPS & releasefor
production.
5.2. For new Welder Approval, tests shall be conducted by welding a tests
coupon with parameters as per qualified welding procedure.
5.3. Test coupon identification shall be done as per ASME section IX/ISO:
9606-1.
5.5. Sample preparation for applicable physical tests shall be done as per
ASME Sec IX/ISO: 9606-1
5.6. Once sample is prepared, Welding Engineer shall verify its dimensions &
offer to TPI/AI for Review/Stamping as applicable.
5.7. Testing shall be done in NABL approved lab,in-house lab or other lab
recommended by client.
5.8. After completion of tests, Welding Engineer shall verify test reports &
shall take decision of acceptance or rejection based on ASME Sec IX or EN
9606
ACTIVITY ASME IX EN
(Non mandatory
appendix B)
6. RECORDS
6.1. PWPS
6.2. WPS
6.3. PQR
6.4. WPQ