Kitchen Area
1. Install 6 mil plastic sheeting secured with tape in two sections of the kitchen from ceiling to
floor, to closing it off from the rest of the house. One section behind the sink area and another
section in front of the sink area, extending to the adjacent walls. There will be a centralized
neutral zone between the above described sections for decontamination use by employees to
ensure proper mold removal techniques are adhered to.
2. Tightly cover all appliances and cabinets with 6 mil plastic and tape.
3. Cover and seal all flooring in kitchen with hardboard paper and plastic, secured with tape.
4. Cut out sections of sheetrock on ceiling and walls where necessary to determine the amount of
water and mold damage. This will expose the upstairs master bath subfloor as well.
5. Remove light fixtures and upper cabinets where necessary to determine decontamination and
reinstallation versus replacement.
6. Remove all contaminated and damaged areas; this includes sheetrock, studs, joists, etc.
Note: Any contaminated materials that we are unable to remove will be treated with an
antimicrobial agent then will be left to dry. Once dry they will be coated with a sealer.
Initials _______
D ependable N A ffordable Remodeling
Dan Trevino (210) 902-7372
3. Remove all tile and walls where needed in shower area including sheetrock on toilet side of
shower.
4. Remove bench and glass on tub side of shower.
5. Remove glass door and shower pan.
6. Remove tile on floor all around shower.
7. Remove toilet and tile under toilet.
8. Remove all contaminated and damaged subflooring.
9. Remove all contaminated and damaged studs, floor joists, baseboards and sheetrock.
*Note: Any unforeseen issues that arise during demo will be discussed
with the homeowner. An example would be the discovery of
additional wood rot and/or mold . These issues would require
more time and materials, therefore, a change order would be issued
for additional work upon agreement with the homeowner.
Kitchen Area
1. Replace all sheetrock and treat for mold as needed.
2. Tape, float, texture and paint where needed.
3. Install new light fixture.
Initials _______
D ependable N A ffordable Remodeling
Dan Trevino (210) 902-7372
Initials _______
D ependable N A ffordable Remodeling
Dan Trevino (210) 902-7372
Cost Breakdown
Labor Costs
Material Costs
Homeowner is responsible for all material costs. A proposed materials list has been included (Page 5)
for your reference. Materials and material pricing may change if job specifications change.
Please initial each page and sign below to accept the proposed work and associated labor costs.
Sincerely,
Dan Trevino
DNA Remodeling
Initials _______
D ependable N A ffordable Remodeling
Dan Trevino (210) 902-7372
Initials _______