6 CUSTODY MEASUREMENT
TECHNICAL EXCHANGE MEETING
(CMTEM 2011)
Authors:
Peter Jakubenas – Installed Product Services Manager, FMC Technologies
Bryan Partridge – After Market Manager, FMC Technologies
Jeffery MacKenzie – Global Aftermarket Manager, FMC Technologies
Presented by:
Peter Sims – Business Development Manager FMC Technologies
APPLICATIONS
• PIPELINE TERMINALS
• EXPORT TERMINALS
• IMPORT TERMINALS
• FLOATING PRODUCTION STORAGE VESSELS -
FPSO AND FSO
CUSTODY TRANSFER AGREEMENTS
• BUYERS
• SELLERS
• CUSTOMS
• GOVERNMENT
• SHIPPERS
FISCALIZATION ACCURACY
• QUANTITATIVE MEASUREMENT
• QUALITATIVE MEASUREMENT
• TRACEABILITY TO RECOGNIZED STANDARDS
• METERS
• PROVERS
• FLOW COMPUTERS
• CONTROL SYSTEMS
QUALITATIVE MEASUREMENT
• DENSITY OR GRAVITY
• TEMPERATURE
• PRESSURE
• VISCOSITY
• SAMPLING
• BS & W
DESIGN OBJECTIVES
• ULTIMATE PERFORMANCE
• PROPERLY SELECTED COMPONENTS TO ACHIEVE
LOW UNCERTAINTY
• TURNKEY CONTRACT
• EXPERIENCED
• SUPPLER WITH PRODUCT LINE KNOW HOW AND
COMMITMENT
• SUPPLIER WITH ONGOING SUPPORT SERVICES
HISTORY
WHAT ACCURACY CAN BE
ACHIEVED?
• Under Registration
– Deprives the seller of entitled revenue
• Over Registration
– Customer complaints and loss of good will
– Possible retroactive rebates
– Potential lawsuits
• We are seeking the truth (CERTAINTY) in
measurement
• Uncertainty is RISK associated with the
transaction
TYPICAL SYSTEM P&ID
•
DESIGN FOR LOWEST TOTAL
OWNERSHIP COST
o POSITIVE DISPLACEMENT
o HELICAL TURBINE
o CONVENTIONAL TURBINE
o CORIOLIS
o STATIC MIXER
• FLOW RATE
• VISCOSITY
• METER RUN QTY. VS SIZE
METER SELECTION RULE OF
THUMB BASED ON FLOW RATE
AND VISCOSITY
QUALITY SKID
• LINE EXTRACTION DEVICES
• SLIP STREAM PUMPS
• DENSITOMETER(S)
• VISCOMETER(S)
• FLOW METER AND CONTROL VALVE IN LOOP
• BS & W MONITOR
• SAMPLER
SKID AUTOMATION
• SUPERVISORY COMPUTERS
– CONTROL
– DATA COLLECTION
– AUTOMATED PROVING
– EXTENSIVE REPORTING AND ARCHIVING
– SOPHISTICATED MAN MACHINE INTERFACES
– COMMUNICATION INTERFACES
– METER AND PROVER DIAGNOSTICS
TYPICAL HMI SCREEN
TYPICAL CRT SCREEN
Meter Performance Analysis
Software
MAINTENANCE and CALIBRATION
ISSUES
26
Contract Framework
Program Management
27
Contract Personnel
• Total of 65 people:
Administration (6) Planning and Operations (44) Consultancy and Engineering (14)
UK UK UK
• 1 Contract Manager (50%)1 • 3 Planning Engineers1 • 1 Senior Consultant1
• 3 Administrators1 • 22 Metering Technicians1 • 6 Metering Engineers1
NL NL NL
• 2 Administrators • 3 Planning Engineers • 1 Senior Consultant
• 1 Financial controller (20%) • 12 Metering Technicians2 • 4 Metering Engineers
NO NO NO
• 1 Administrator (10%) • 3 Metering Technicians • 1 Senior Consultant
• 1 Analyser Specialist3 • 1 Metering Engineer
28
Equipment Supported
SCOPE OF EQUIPMENT SUPPORTED
• FLOW COMPUTERS:
– S500’S, S600’S, MICRO 5000’S, OMNI, SOLARTRON 7915, 7951, 7925, 7922, 7955,
869M,INTROMET FC500, FC2000, NETOIL, DANIELS S103, PROMAC, CONTREC
• SAMPLING SYSTEMS:
– WELKER, JISKOOT
PERFORMANCE MANAGEMENT:
KPI’s
• HSE
• Behavioural
• Performance
• Innovations
• Savings
31
CONTRACT BENEFITS: MANAGEMENT
SYSTEMS
32
CONTRACT BENEFITS: MANAGEMENT
SYSTEMS
33
CONTRACT BENEFITS
34
CONCLUSIONS
KHALID A. AL-FADHL
Chairman, Custody Measurement Standards Committee
Saudi Arabian Oil Company (Saudi Aramco)
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Outlines:
1. Introduction
2. What is Standards Globalization?
3. Benefits of Globalization
4. Saudi Aramco Engineering Standards Structure
5. Globalization Approach and Strategy
6. Custody Measurement Standards Globalization
Initiative
7. Challenges
8. Conclusions
9. Recommendations
Slide # 1
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
1. Introduction
Slide # 2
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 3
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 4
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
3. Benefits of Globalization
Slide # 5
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
3. Benefits of Globalization
• Eliminate special requirements that may
increase project costs
Slide # 5
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
3. Benefits of Globalization
• Eliminate special requirements that may
increase project costs
• Increase the number of potential suppliers of
material
Slide # 5
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
3. Benefits of Globalization
• Eliminate special requirements that may
increase project costs
• Increase the number of potential suppliers of
material
• Reduce manpower required to maintain
company standards
Slide # 5
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
3. Benefits of Globalization
• Eliminate special requirements that may
increase project costs
• Increase the number of potential suppliers of
material
• Reduce manpower required to maintain
company standards
• Help build local industry around international
standards to better compete in the global
market
Slide # 5
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
3. Benefits of Globalization
• Eliminate special requirements that may
increase project costs
• Increase the number of potential suppliers of
material
• Reduce manpower required to maintain
company standards
• Help build local industry around international
standards to better compete in the global
market
• Develop cost estimates more economically.
Slide # 5
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 6
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 7
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 7
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 7
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 7
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 8
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 9
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 10
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 10
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 10
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 10
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 11
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 12
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 13
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
C. Gap Analysis
• Exception Format is used to develop
documents that have a reference
international document.
• Normative Format is used to develop
documents that do not have a reference
international document.
Slide # 13
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 14
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
No. of VE Estimated
Document No. of VE
Document Title Date Recommend Cost
No. Proposals
-ations Avoidance ($)
SAES-Y-101 Custody Metering of 14 30 7,400,000
Hydrocarbon Gases
5/9-13/2009
SAES-Y-103 Royalty/Custody Metering of 18 33 30,000,000
Hydrocarbon Liquids
34-SAMSS-119 Bi-directional prover 4 19 816,200
Slide # 15
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 16
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 17
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 18
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 19
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 20
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Slide # 21
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
7. Challenges:
Slide # 22
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
7. Challenges:
Slide # 22
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
7. Challenges:
Slide # 22
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
7. Challenges:
Slide # 22
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
7. Challenges:
Slide # 22
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
7. Challenges: (Cont’ed)
Slide # 23
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
7. Challenges: (Cont’ed)
Slide # 23
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
7. Challenges: (Cont’ed)
Slide # 23
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
8. Conclusion
• Saudi Aramco, through Globalization Initiative,
made a significant progress in optimizing the
alignment of its technical requirements with the
international standards.
• Some of the Saudi Aramco standards were
adopted by GSO and others were submitted to ISO
for adaptation.
Slide # 24
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
9. Recommendations:
Slide # 25
CUSTODY MEASUREMENT STANDARDS GLOBALIZATION INITIATIVE
_______________________________________________________________
Summary:
1. Introduction
2. What is Standards Globalization?
3. Benefits of Globalization
4. Saudi Aramco Engineering Standards Structure
5. Globalization Approach and Strategy
6. Custody Measurement Standards Globalization
Initiative
7. Challenges
8. Conclusion
9. Recommendations
Questions?
JISKOOTTM QUALITY SYSTEMS
$450,000,000
$400,000,000
$350,000,000
$300,000,000
$250,000,000
Losses
$200,000,000
$150,000,000
$100,000,000
$50,000,000
$0
0.000% 0.040% 0.080% 0.120% 0.160% 0.200% 0.240%
Effect of quality measurement on overall accuracy??
Importance of accuracy
• Crude oil cargo - 300,000 m3
1cc sample grabs taken, 10,000 per batch
10 litre sample taken to lab for analysis
1 – 100ml analysed for water - depending on method
• Volume analysed can be 1 in 300 BILLION
1 in 300,000,000,000
Sampling standards
• 34SAMSS – 525
• SAES–Y-501
• ISO 3171
• API 8.2 – called by above
• IP 6.2 & ASTM 4177
(same as API)
EFFECT
0.80%
OF POOR
Accuracy
MIXING
0.60%
ON WATER
CONTENT
MEASUREMENT
0.40%
0.20%
0.00%
L2)
Confirm
Validate and
mixing
ensure
performance
system
– v – design
reliability
parameters Certified
quality
measurement
system
Validate
Validate
handling,
system
laboratory
performance
process
Summary
1.
Design and
specification
8. 2.
Revalidation Installation
and proving and
as required commission
7. Certified 3.
Confirm accuracy Proving in
operating & accordance
envelope
reduced with
same as
standards
design losses
6. 4.
Validation of Batch
sampling certification
and analysis of
process performance
5.
Maintenance
schedule
So what does your quality measurement look like?
1973 – OR - 2011?
Thank You
Questions?
November 2011
BTU Gas Measurements
Challenges & Optimization
Abdulaziz A. Al-Faraj
Saudi Aramco
• Existing Methods
• Challenges
• Optimization Methods
• Conclusion
Background
Ras Al KhairJubail Royal Commission Pressure : 300 – 1000 PSIG
The MasterBerri
GasPower
System
Plant consists of:
Jubail Royal Commission Flow : around 4.2 BSCFD in
the Eastern Province
1-KGP
Major gas plant producers
Temperature : 70 – 150 ᵒF
2- ComplexBerri
pipelines network Wusta BTU: 900 – 1280
Desalination Plant
Berri Junction
3-BGP
Major junction sites Ghazlan Power Plant 1 & 2
SAUDI
ARAMCO CUSTOMER
Class-I
Valve Orifice FCV (B)
Metering Skid Classification
• Secondary
≤ 20 MM SCFD
− Small Gas Metering System
− Composite Sampler
• Primary
200 MM SCFD ≥ Primary ≤ 20 MM SCFD
− Medium Gas Metering System Online GC
− or a representative sample from another GC
• Major
> 200 MM SCFD
− Large Gas Metering System
− Independent Online GC required
SAMPLING METHODS
• Laboratory Dependent
Online Analyzer
LIMITATIONS
Engineering
Maintenance
Operation
Laboratory
Challenges
5- Match BTU With That of Our Customers to Eliminate
Potential Claims
• Periodical PM
• Secure Resources
Optimization Methods
1- Automate Gas Sampling Processes In Order to Reduce
Manual Activities
Optimization Methods
2- Network Enhancement
Centralized
Location
Gas Composition
BTU
& other Data to BTU
AIT F.C
Costumer A
Update MMBTU at
Local Flow Computer
Costumer A
Sample line
Costumer C
Ahmad I. Al-Shaye
Saudi Aramco
NA Pipelines Department
© Copyright 2011, Saudi Aramco. All rights reserved.
Outline
• System Overview
• Our Customers
• Duties and Responsibilities
• Challenges
• Optimization Methods
• Conclusion
Overview
Jubail
Ras Tanura
Dhahran
Our Customers
Sector # Metering Stations Total #
RC Primary 42
Industries
Sales Gas RC Secondary 20
& Ethane Industries 77
(Custody) Electricity &Water 10
Desalination
Others 5
Crude Oil Refineries 2
(Royalty) Petrochemicals 1 3
The Sales Gas Ring
JUBAIL
KAYAN
SECONDARY
INDUSTRIES
CHEMANOL SEPC 20 Customers
HADEED
ALRAZI
APPC
Sahra- IBN AL
IBN SINA
SHARQ BAYTAR
PETROKEMYA Maaden EDC
GULF
SODA GLASS FIBER MODECOR JANA HASAD
GUARD
BILAD
NAJI
Secondary Ring
INDIPCO
Ethane Ring
SABIC SIPCHEM
PETROKEMYA KEMYA SADAF
(ABS) Integrated
Typical Metering Station
Flow Computer Bldg.
Central
Dispatch
System
Flow Meter
FCV (B)
Duties and Responsibilities
• General Requirements
• Measurements Operations
• Metering Skids Maintenance
• Customers Issues
Duties and Responsibilities
• General Requirements
– Operate and Maintain Safely and Reliably
– Conduct Regular Audits
– Revalidate Lateral Lines
– Replace Obsolete Equipment
Duties and Responsibilities
• Measurements Operations
– Instruments Calibrations
– Measurement Discrepancies
– Expansion or Demolition
– New Projects
Challenges
• Continuously Improve Gas Measurement
Accuracy In Order to Reduce Uncertainty
Challenges
“No. of Metering Stations"
90
• Cope with Continuous
Growth 80
70
– Flexibility 60
– Adaptability 50
40
30
2005
2003
2004
2006
2007
2008
2009
2010
2011
Challenges
• Special Logistics
Requirements
– Scattered and Restricted
Metering Skids
Challenges
• Meeting Company and Customers’ Demands
– Continuously Improve Efficiency of Processes
– Maintain Optimum Accuracy and Reliability
Optimization Methods
• Deploy Advanced Technologies
1
Partnering for results
2
Presentation overview
• System components
• Communication
• Intelligence
• Testing
• Summary
3
Metering system field components
Inlet Outlet
4
Metering system field components
5
Metering system field components
• Impacts measurement!
6
Metering system field components
7
Metering system field components
8
Metering control system architecture
MSC A MSC B
NETWORK
FC A FC B PLC
9
Metering control system – flow computer
• Remote I/Os?
10
Metering control system – PLC
• Failure modes
11
Metering control system – supervisory computer
Communication
Operating system
12
Metering control system – integration
13
Metering control system – redundancy
14
Metering control system – reports
15
Metering control system – alarms
16
Metering control system – documentation
17
Metering control system – testing
• Remote I/Os will resolve wiring issues on skid and control panel at FAT
18
Metering control system – training & certification
• Technician training
• Engineer training
19
Metering control system – intelligence
20
Metering control system – communication
• In-Built redundancy
21
Summary
- Components
- Communication
- Intelligence
- Testing
22
Thank you for listening
Any Questions?
23
An Integral Approach To
Custody Transfer Data Management
• dumb
• inaccurate
• time-consuming
Contents
• Mismeasurement management
• Case study
• Conclusions
Custody Transfer Data
Why?
To verify correctness of data
To allow for correction of failures
Old situation
-1.5
CT data trend
Measurement Alarms
Historical Meter
Ticket Overview .. with
Financial
Correction
Measurement Events
Mismeasurement correction
• Metering equipment
• Proving
• Sampling
• Laboratory analysis
• Flow computers
• Meter ticket recalculation
– API MPMS 12.2
– Proving (Meter factor)
– Sampling (density, BS&W)
100000 bbl
65 API60
100000 bbl
76 ᵒF
65 API60
75 ᵒF 205 psi
GSV 99120 bbl
195 psi
GSV 99180 bbl
Up to 0.01% difference
at stable conditions
Significant difference
at highly fluctuating
conditions
For example
Flow computer
GSV = 37942 bbl
Up to 0.10%
Meter Ticket Recalculation
1. METER CLOSING READING (DATE/TIME) 05/06/11 00:00
2. METER OPENING READING (DATE/TIME) 05/05/11 00:00
3. NET DELIVERY TIME 24.001 hours
6. METER CLOSING READING 23388.593 MMSCF
7. METER OPENING READING 23167.330 MMSCF
8. TOTAL VOLUME 221.263 MMSCF
11. AVERAGE FLOW RATE 221.012 MMSCFD
12. AVERAGE DIFF PRESSURE 23.12 inch WC
13. AVERAGE TEMPERATURE 113.3 °F
17. AVERAGE STATIC PRESSURE 1317.6 psig
18. AVERAGE DENSITY 6.45 lb/SCF
Inaccurate for
• Gas
• dP flow meters
• q ≈ √(dP x P) FWA dP is useless
Meter Ticket Correction
* Patent pending *
Meter Ticket Correction
Relative to corrected quantity that would have been calculated at 1 sec resolution
Conclusions
dumb smart
inaccurate accurate
time-consuming time-saving
Smart, accurate and highly automated
Metering Control Systems
to achieve comprehensive and integral
Custody Transfer Data Management