STRUCTURE ANALYSIS (STEP 2) FUNCTION ANALYSIS (STEP 3) FAILURE ANALYSIS (STEP 4) RISK ANALYSIS (STEP 5) OPTIMIZATION (STEP 6) FMEA-MSR RISIK ANALYSIS (STEP 5) FMEA-MSR OPTIMIZATION (STEP 6)
Frequency (F) of FC
Severity (S) of FE
serial number #
Monitoring (M)
Monitoring (M)
Occurance (O)
Occurance (O)
Frequency (F)
Status: (Untouched,
Detection (D)
Severtiy (S)
Status: (Untouched,
Severity (S)
Severity (s)
Filter Code
DFMEA AP
(Optional)
(Optional)
Filtercode
3. Next Lower level or under
MSR AP
MSR AP
3. Next Lower Level 1. Failure Effects (FE) to 3. FAILURE CAUSE (FC) of the under consideration,
Characteristic Type 1. Next Higher Level 2. Focus Element Function 2. FAILURE MODE (FM) of the Current Prevention Current Detection Responsibile Target Completion consideration, in Action Taken with Current Diagnostic Current System MSR Preventive Target Completion Action Taken with
AP
History 1. Next Higher Level 2. Focus Element Function and Requirement Next Higher Level Element Next Lower Element or Prevention Action Detection Action Completion Date Rational for Frequency Diagnostic System Response Responsibile Person in progress, Completion Date Remarks
(Geometry, Material, Surface Function and Requirement and Requirement Focus Element Controls Controls Person Date progress, Pointer to Evidence Monitoring Response Action Date Pointer to Evidence
or Characteristic and/or Vechile End User Characteristic (F) Monitoring Action completed,
Finish, Coating, etc.) completed,
discarded)
discarded)
Continuous
improvement
STRUCTURE ANALYSIS FUNCTION ANALYSIS FAILURE ANALYSIS RISK ANALYSIS OPTIMIZATION
special feature
Occurance (O)
Status: (Untouched,
Detection (D)
Severity (s)
(Optional)
Filtercode
3. Function of Component under
2. System Element / 1. Function of System and 2. Function of System
3. Component Element Element and Requirement Current Prevention Current Detection Responsibile Target Completion consideration, in Action Taken with
AP
AP
History 1. System Interface Requirement or Intended Element and Inteded 1. Failure Effects (FE) 2. Failure Mode (FM) Prevention Action Detection Action Completion Date Remarks
(Item/Interface) or Intended Output or 3. Failure Cause (FC) Controls Controls Person on date progress, Pointer to Evidence
Output Performance Output
Characteristic completed,
discarded)