SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.

00 31-Mar-15
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Fireproofing Concrete Curing Inspection SAIC-B-1003 30-Apr-17 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Concrete fireproofing shall be continuously water cured by covering SAES-Q-001


A1
with wet burlap and 0.15mm plasticized sheet vapor barrier. Sec. 10.1 & 10.4

Maximum total dissolved solids in water used for curing shall not SAES-Q-001
A2
exceed 1000 parts per million. Sec. 10.2

Any formwork used shall be covered and kept continuously moist


SAES-Q-001
A3 during the early curing period before formwork is removed.
Sec. 10.1
(ACI 305R, Sec. 4.4.4)

Water curing shall be continuous until compressive strength has


SAES-Q-001
A4 reached 70% of the specified strength but not less than 7 days after
Sec. 10.3
placement.

Curing for proprietary fireproofing (such as lightweight concrete) shall


SAES-B-006
A5 be made in strict accordance with the manufacturer's approved
Sec. 8.2.3
procedure.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-B-006 -- Fireproofing for Plants, 20 November 2011
2- SAES-Q-001 -- Criteria for Design and Construction of Concrete Structures, 5 March 2008

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED