RESIDENTIAL CONSTRUCTION INSPECTION CHECKLIST

Underground/floor Pressure test gas lines


Cleanouts (must have two way cleanout within 5’ Piping support
of structure) Mechanical
Pipe grade / slope Duct support & insulation
Leak test Return, supply & combustion air
Correct fittings Vent clearances
Support/shading of pipe Furnace
Conduit/pipe sizing Electrical
Foundation Temp power
Setbacks – distance to P.L. or slope Wire size & circuit breakers
Footing size per plan Grounding Electrode/conductor
Rebar placement & clearance Grounding & bonding
Hold downs & anchor bolts Wire & Conduit support
Ufer / Ground Ring Outlet spacing
Protection of underground pipes and GFCI / AFCI
penetrations through slab Lighting controls
Soils report/compaction report Light @ exterior door
Framing Lighting (efficacy & proper installation)
Treated sills Insulation
Anchor bolts spacing Installed per energy calculations
Under floor & attic access and ventilation Windows, doors, plates & penetrations caulked
Clearance from earth to framing Ventilation holes and baffles are clear
Trusses installed per plan (truss packet to be Sheetrock
approved by city prior to frame inspection) Type of rock for location (5/8” type X in garage
Lateral support of joist and rafters ceiling & under stairs)
Floor, wall & roof framing, nail plates Screw / nailing
Notching and boring No paperback gypsum in wet locations
Exterior & Interior shear walls & nailing
Lath
Roof & floor nail
Securing of wire
Framing plates and straps
Lap of wire
Tie downs and shear transfer
Window flashing
Fire blocking – vertical & horizontal
Waterproofing
Stairs – rise and run
Weep screed clearance
Egress windows
Repair holes as needed
Safety glazing
Roof
Ceiling height
In progress inspection
Plumbing
Final – gutters and downspouts to be installed
Test for waste & potable water
RESIDENTIAL CONSTRUCTION INSPECTION CHECKLIST

Final
Site address NOTES:
Grade slope away from house When calling for Rough framing inspection, all
Vent caps / spark arrestor mechanical, plumbing and electrical shall be
Trash & debris removed roughed in prior to inspection.
Smoke & carbon monoxide detectors Work being inspected shall be complete prior to the
GFCI / AFCI inspector’s arrival.
Garage door to house self-closing & solid core Job to be walked by contractor and subs prior to
Electric panel (sub panels) – labeled, grounded inspector’s arrival.
& bonded Special inspections are to be completed prior to
Final t-24 paperwork (i.e. HERS testing) inspector arrival – paperwork in hand (if required).
Guardrails/handrails Job card and approved building plans to be on site
Tempered/safety glass for inspection.
Water heater -T & P, sediment trap, strapped, & Inspection hours are from 8am to 4pm. Inspector
bonded will call with a 2 hour window. You should plan to be
Furnace – Strapped, sediment trap, required available for full window when scheduling inspection.
working space, convenience outlet, lighting Rule of thumb – Do not cover anything prior to
Appliances secured/earthquake straps inspection.
Utilities hooked up and functioning
Attic / crawl space access ** Failure for any of the above may result in a
Walkways & working space for equipment re-inspection fee of $125.00 **
Sealing of base of plumbing fixtures
Landings as required
Inspection Order:
Insulate hot water lines 1) Underground - utilities ( optional)
Cover plates installed 2) Forms & Footing and/or Slab
3) Underfloor MEPS (if applicable)
Lighting and all fixtures installed 4) Exterior Shear/ Roof nail
Backflow device @ hose bibs (anti-tamper 5) Roof in progress
6) Fire sprinkler - if required
screws broken off) 7) Rough Combo (Frame, Mech, Elec, plumb)
Construction fences removed 8) Insulation
9) Sheetrock
Portable toilet(s) removed 10) Shower pan/Interior lath
11) Exterior lath
Trash and debris removed
12) Final
*** All final T24 paperwork due. (i.e. HERS
testing, installation certificates etc.).