SAUDI ARAMCO INSPECTION CHECKLIST
Review of Procedure for Storage, Handling &
SAIC-G-2001 30-Apr-17 MECH-
Preservation of Equipment
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
Schedule Q,
The procedure has listed all inspection schedules for maintaining the
A2 Attachment IV,
quality of the material or equipment.
Para. 6
Schedule Q,
The procedure provides details for documentation that the required
A4 Attachment IV,
activities have been performed.
Para. 6