METHOD STATEMENT FOR FLUSHING WORK
Date: 23/12/2019
Page 2 of 8
Contents
1. INTRODUCTION...............................................................................................2
2. SCOPE OF WORK............................................................................................2
3. PREPARATION.................................................................................................2
3.1 INSTALLATION CHECK
3.2 SAMPLING POINT
3.3 FILTER
4. CHILLED WATER PIPE FLUSHING WORK PROCEDURE.............................3
4.1 PROCESS 1
4.2 PROCESS 2
4.3 PROCESS 3
5. CHEMICAL.......................................................................................................4
5.1 CHEMICAL A
5.2 CHEMICAL B
6. PARAMETER....................................................................................................4
6.1 PARAMETER 1
6.2 PARAMETER 2
6.3 PARAMETER 3
7. WATER FLUSHING FLOW CHART.................................................................5-6
8. SAFETY..............................................................................................................7
METHOD STATEMENT FOR FLUSHING WORK
Date: 23/12/2019
Page 3 of 8
1.0 INTRODUCTION
The purpose of this statement is a guideline for Flushing Work for the ““CADANGAN
PEMBANGUNAN SEBUAH BANGUNAN AKADEMIK ‘ASIA SCHOOL OF BUSINESS’
(ASB) JALAN DATO ONN, MUKIM BANDAR KUALA LUMPUR, SEKSYEN 51,
WILAYAH PERSEKUTUAN KUALA LUMPUR.”
SUPPLY, INSTALLATION, TESTING AND COMMISSIOING OF AIR CONDITIONING
AND MECHANICAL VENTILATION SERVICES.
3.0 PREPARATION
Before the flushing work is carried out, the following points shall be considered:
3.1 Installation Check
Prior to commence the flushing work, a thorough inspection shall be carried out on the
pipe works, fittings and plants to ensure the entire system is water tight. All the
isolating valves to other pipe sections besides the flushing section shall be close to
avoid accidental cross contamination between systems.
3.2 Sampling Points
Sampling points shall be taken from the chilled water pipe line.
3.3 Filter
The filters shall be placed in the flushing tank to trap the foreign material in the pipeline
during flushing.
METHOD STATEMENT FOR FLUSHING WORK
Date: 23/12/2019
Page 4 of 8
Date: 23/12/2019
Page 5 of 8
5.0 Chemical
5.1 Chemical A
cleaning wetting agent and functions as the oil and grease remover agent during
initial chemical flushing.
5.2 Chemical B
Clean CT-01, is which functions as the corrosion inhibitor during water treatment.
6.0 Parameters
6.1 Parameter A
pH Value pH 7 – pH 11
Conductivity (uS/cm) Less than 1000
Total Iron (ppm) Less than 10
Turbidity (NTU) Less than 120
6.2 Parameter B
pH Value pH 7 – pH 11
Conductivity (uS/cm) Less than 1000
Total Iron (ppm) Less than 5
Turbidity (NTU) Less than 60
6.3 Parameter C
pH Value pH 7 – pH 12
Conductivity (uS/cm) Less than 4000
Total Iron (ppm) Less than 5
Turbidity (NTU) Less than 40
Nitrate Ion (ppm) 350-600
METHOD STATEMENT FOR FLUSHING WORK
Date: 23/12/2019
Page 6 of 8
No
Achieve
Parameter
A
Yes
Achieve No
Parameter
A
Yes
Date: 23/12/2019
Page 7 of 8
Achieve No
Parameter
A
Yes
Dose in Chemical A
No
Achieve
Parameter
B
Yes
Dose in Chemical B
Date: 23/12/2019
Page 8 of 8
8.0 SAFETY