Option I

Labour rate (item wise)

S.No. Item Unit Rate Remarks


1 Earthwork in Excavation Cuft. 13
2 Earthwork in Backfilling Cuft. 8
3 Soling/ Ramming Sqft. 5
4 PCC Sqft. 35
5 RCC Sqft. 90 PLY
6 RCC (FOUNDATION) Cuft. 90 Footing
8 Wall 9"/4" Sqft. 40
9 Plaster Inside Sqft. 15
10 Plaster Outside Sqft. 23
11 Screeding/ punning Sqft. 35
12 Chipping Sqft. 5
13 Tile Sqft. 40
14 Marble Sqft. 70
15 Marble moulding (Single) rft. 35
16 Marble moulding (Double) rft. 65
17 Pani patti rft. 40
18 Skirting rft. 25