You are on page 1of 1

LEE CASTLE DEVELOPERS

SL.NO WORK DESCRIPTION RATE UNITS


1 EARTH WORK (UPTO 5 ft) 10 CFT
above 5 ft 12 CFT

2 P.C.C 12 SQFT
3 RCC WORK SHUTTERING 40 SQFT
4 BARBENDING 7000 TONNE
5 CONCRETE FOOTING 18 CFT
6 CONCRETE COLUMN 25 CFT
7 BRICK WORK 18 SQFT
8 RR MASONARY 15 CFT
9 BLOCK WORK 18 SQFT
10 SILL CONCRETE 25 RFT
11 PLASTERING
HACKING 1 SQFT
CEILING 16 SQFT
WALL (INNER) 15 SQFT
OUTER (EXCLUDE SCAFFOLDING) 20 SQFT
COLUMN 20 SQFT
12 TILING
FLOOR 18 SQFT
WALL 20 SQFT
GRANITE FLOOR 30 SQFT
GRANITE WALL 50 SQFT

OTHERS
MASON 550 PER DAY
HELPER 350 PER DAY
FEMALE HELPER 250 PER DAY

FIRST FLOOR GROUND FLOOR RATE + 10%


SECOND FLOOR GROUND FLOOR RATE + 20%

R.SUNDAR