Purpose
The purpose of preparing a Project Completion Report (PCR) is to record all the salient features of a
completed contract so that it becomes a referral for statistical data, best practices and lessons for future
contracts.
Scope
The PCR should record the various data and details as per the standard format attached from inception
to completion / substantial completion of the project. It need not wait for the final handing over or
receipt of completion certificate.
Responsibility
It is the responsibility of the Project Head to ensure that the PCR is prepared and sent to Division Head
for final approval and onward transmittal to the Document Controller / Library and Estimation
Department as per the flow chart shown hereunder. In case a Project Head is withdrawn from the
project in the midway, he should get the PCR prepared with data since inception and till that point of
time and hand it over to his successor. The Successor will ensure that the subsequent data are entered
and the final PCR is sent to Division office / HO.
• Project Information
• Risks review
[Review the Risks identified in FTS as well as the mitigation measures considered and
compare those with actuals]
• Brief details of major Commercial issues and how these were managed
[Furnish details of claims converted to Extra Items/Variations. Claims remaining as
disputes are not be mentioned here]
• Resources deployed
• Manpower
• Site organogram (only key team – Project Head and next level reporting to him)
Refer Annexure III attached
• Staff deployed
Sl. Responsibility Name Designation Duration Man-month Remarks
No. (months) provided in
FTS
1. Project In-charge Mr.------ DGM 23 20 AGM in FTS
2. Execution M 20 22
Mr.-----
3. Mr.------ AM 25 No AM in FTS
4. Mr.------ E 15 40
5. Mr.----- AE 22 18
6. Commercial
7.
• List of major Sub-contractors & their scope of work including performance rating
in 1-5 scale
Refer Annexure V.
Plan and sections of office, store, laboratory, labor hutments etc. : Refer Annexure IX attached.
[Mention unit costs]
• Enabling works
• Gantry, truss etc. fabricated for the project
Refer Annexure X attached. [Furnish scheme and drawings with BoM]
• Quality Control
• Achievements
[Highlight the innovations, improvements etc.]
Refer Annexure XIII attached for Construction schedule (CPM Network) along with WBS.
[Furnish soft copy also]
• Statistical Data
• Cycle time of major activities
Sl. Main Activity Sub Activities Quantity Average Remarks
No. duration
1. Bridge 24 cum Day 1
foundation Excavation
(open)
a) PCC 1.5 cum Day 1
b) Re-bar 1.8 MT Day 2
c) Fixing of shuttering 16 sqm Day 3
d) Concreting 15 cum Day 3
e) Removal of shuttering 16 sqm Day 4
2.
** Wastage may be shown separately towards rolling margin, scraps generated and
unaccountable wastage
TOTAL
% of Contract value/TO
• Claims
• Safety Records
• Injury Summary
Description PTD
Fatalities
Other Reportable Injuries
Minor Injuries
Turnover (Rs.Crores)
ITR
• Achievements / Appreciations
• Lessons Learnt
[List down important observations which will be useful for improving our performance in the next
project]
• Recommendations for improvement
• Technical
• Methodology
• Progress of work
• Cost
• Contractual matters
• Administrative issues
• Photographs