Material from this presentation may not be used or reproduced without prior written consent of the BNSF
R il
Rain Impact on Ballast Contaminated
with Coal Dust
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 1
R il
Undercutter Work – Normal Ballast is
not Black
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 2
R il
Schematic of Typical BNSF/UP Dustfall
Collector Orin Subdivision Site
Service Road
Service Road
5 2 1
4 3
12’ 12’
35’
60’ 60’
Note: Distances
from centerline
of track will vary
N
slightly due to site
geography
Western Eastern
Track Track
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 3
R il
Dustfall Collectors
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 4
R il
Trackside Monitor (TSM)
Propeller
MP 90.7 TSM Anemometer
Dust Monitor
Temperature/
Relative Humidity
Sensor
Data Logger
Precipitation Gauge
Dustfall Collector
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 5
R il
Trackside Monitors
z Locations:
z MP 90.7 on Orin Sub
z Towers on East and West sides of tracks
z Approximately 50% of trains useable
z MP 558.2 on Black Hills Sub
z Towers on North and South sides of tracks
z Approximately 75% of trains useable
z MP 693.4 on Big Horn Sub
z Data collection only at this time
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 6
R il
Post-Processing of Train Data
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 7
R il
Coal Dust Train Measurement
80
60
40
20 Train arrives at MP 90.7
0
-60 0 60 120 180 240 300
Time (Seconds)
Environmental
Train Passage at
Background
MP 90.5 According to
Dust
BNSF Train Data 8
Material from this presentation may not be used or reproduced without prior written consent of the BNSF
R il
Integrated Dust Value (IDV.2)
80
60
40
20
Train arrives at MP 90.7
0
-60 0 60 120 180 240 300
Time (Seconds)
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 10
R il
Impact of Modified Chutes
BEFORE AFTER
Note Peaked Loads, Sharp Lines, Note Rounded Contour, No Sharp
Steep Angle of Repose and other Angles, Flatter Angle of Repose and
irregular surfaces which are few irregular surfaces which are
susceptible to erosion susceptible to erosion
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 11
R il
Field Profile Audits
z Photograph
z Video of train
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 12
R il
RTEPS and Passive Collectors
RTEPS typically applied on last car of
train with Passive Collector to
determine external forcings (Wind
Speed/Direction, Precipitation, Ambient
Temp/RH, Coal Surface Temp, and Airborne
Dust)
Passive Collectors applied in sets of 5 – 10
to test effectiveness of dust suppression
method compared to control technique
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 13
R il
Instrumentation
Material from this presentation may not be used or reproduced without prior written consent of the BNSF 14
R il
Nacco Bridge – Undercut 2006