You are on page 1of 1

BOQ CHECKLIST

Project Name MYSURU

Package Title PTWORKS

Date 29.6.19

Sr No. Checklist points

1. Approved Budget Sheet attached

2. Pages Numbered

3. Make List Attached ( Base rate applied)

4. Drawings (Based on which BOQ is prepared)

5. Is this a standard LTR BOQ

6. Scope Attached

Package owner’s signature

You might also like