Date: 27.03.2023
HS CoE Standard Operating Procedure
Rev.No:1.0 & Date:27.03.2023
Table of Contents
1. Introduction ......................................................................................................................... 2
1.1 Purpose and Scope .......................................................................................................... 2
2. NPI PS Assessment Timeline ............................................................................................. 2
3. PS responsibility in each phase .......................................................................................... 3
4. Process Flow ...................................................................................................................... 3
5. Product Stewardship Compliance Plan: .............................................................................. 4
6. NPI PS Assessment through Accolade ............................................................................... 6
6.1 Navigating in Accolade tool .............................................................................................. 6
6.2 Upload the PSC Plan in Accolade – Discovery Phase ...................................................... 7
6.3 Update PS Assessment status in Accolade – Discovery Phase ........................................ 8
6.4 Upload PSC plan and update PS Assessment status in Accolade – Development Phase 8
7. Other deliverables from NPI PS Assessment ...................................................................... 9
8. Abbreviations .....................................................................................................................10
9. References ........................................................................................................................10
Prepared by
Bagavathy Nagarajan S
SOP No: HS/PS/HBT/1
Date: 27.03.2023
HS CoE Standard Operating Procedure
Rev.No:1.0 & Date:27.03.2023
1. Introduction
1.1 Purpose and Scope
The main objective of this manual is to define the procedure to perform Product Stewardship assessments
and sign off during New Product Introduction to ensure global compliance with current, new, and emerging
environmental regulations for Fire, Security, Electric Products and Building Management System Projects
as per the market destination.
Below Projects are in scope for NPI Product stewardship Assessment:
1. EEE -Electrical and Electronic Equipment (Hardware / Mechanical changes)
2. Above Waterline Projects
Given below are the Global Regulations that are in scope for the NPI PS Assessment
1. ROHS (2011/65/EU RoHS 2 and Amendment (EU) 2015/863).
2. Toxics in Packaging Legislation.
3. EU Packaging Material Labelling.
4. WEEE (2012/19/EU).
5. REACH (EC 1907/2006) and Waste Framework Directive 2000/60/EC.
6. China ROHS.
7. UAE ROHS.
8. California Proposition 65: Safe Drinking Water and Toxic Enforcement Act of 1986.
9. Eco-design requirements for Electronic Displays (EU 2019/2021).
10. Toxic Substances Control Act (TSCA).
Prepared by
Bagavathy Nagarajan S
SOP No: HS/PS/HBT/1
Date: 27.03.2023
HS CoE Standard Operating Procedure
Rev.No:1.0 & Date:27.03.2023
4. Process Flow
Prepared by
Bagavathy Nagarajan S
SOP No: HS/PS/HBT/1
Date: 27.03.2023
HS CoE Standard Operating Procedure
Rev.No:1.0 & Date:27.03.2023
Prepared by
Bagavathy Nagarajan S
SOP No: HS/PS/HBT/1
Date: 27.03.2023
HS CoE Standard Operating Procedure
Rev.No:1.0 & Date:27.03.2023
We can give the PS Deliverable completion Percentage as shown below during development
phase.
Prepared by
Bagavathy Nagarajan S
SOP No: HS/PS/HBT/1
Date: 27.03.2023
HS CoE Standard Operating Procedure
Rev.No:1.0 & Date:27.03.2023
Project ID can be referred from NPI Masterfile (Link provided in References section).
Prepared by
Bagavathy Nagarajan S
SOP No: HS/PS/HBT/1
Date: 27.03.2023
HS CoE Standard Operating Procedure
Rev.No:1.0 & Date:27.03.2023
Prepared by
Bagavathy Nagarajan S
SOP No: HS/PS/HBT/1
Date: 27.03.2023
HS CoE Standard Operating Procedure
Rev.No:1.0 & Date:27.03.2023
Once the PSC Plan is uploaded, the progress status of Product Stewardship plan can be
updated to “Completed” status for Discovery Phase as per the below screen shots.
Prepared by
Bagavathy Nagarajan S
SOP No: HS/PS/HBT/1
Date: 27.03.2023
HS CoE Standard Operating Procedure
Rev.No:1.0 & Date:27.03.2023
Document all the received PS deliverables in respective NPI Share Point folder (Folder name
format: Project ID – Project Name) (Link provided in References section).
Prepared by
Bagavathy Nagarajan S
SOP No: HS/PS/HBT/1
Date: 27.03.2023
HS CoE Standard Operating Procedure
Rev.No:1.0 & Date:27.03.2023
8. Abbreviations
HBT Honeywell Building Technologies
NPI New Product Introduction
NPE New offering Enhancement
PS Product Stewardship
PSCP Product Stewardship Compliance Plan
CIS Compliance Information Solution
EEE Electrical and Electronic Equipment
RoHS Restriction of Hazardous Substances
REACh Registration, Evaluation, Authorization and Restriction of Chemicals
TSCA Toxic Substances Control Act
WEEE Waste Electrical and Electronic Equipment
SKU Stock Keeping Unit
9. References
Accolade link Link
PSC Plan Link
NPI SharePoint Link
NPI Masterfile Link
NPI PS templates Link
Prepared by
Bagavathy Nagarajan S