PROPOSED RESIDENTIAL APARTMENTS IN THE CAMPUS OF MASJID-E-ABDUL ALI AT THANDAVARAYAN STREET, PURASAIWAKKAM.

ARCHITECT: M.S.MUSHTAQ AHMED, CHENNAI


BILL OF QUANTITIES

QS SHAREEF CONSTRUCTION TOPLINE ASSOCIATES BHARAT BUILDERS MKMS BUILDERS PERFECT BUILDERS CRYSTAL BUILDERS
Sl.No Description of Items Unit Quantity
Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount
A EXCAVATION & EARTH WORK
Excavation
1.1 At all levels and depths Cft 17,724.58 15.00 265,868.68 12.00 212,694.95 13.00 230,419.52 8.00 141,796.63 12.50 221,557.23 13.00 230,419.52 23.00 407,665.31
Filling - -
2 Back filling with available excavated earth Cft 13,273.74 8.00 106,189.92 5.00 66,368.70 8.00 106,189.92 4.00 53,094.96 7.50 99,553.05 15.00 199,106.11 10.00 132,737.40
Supply and fill with approved quality earth brougth out
Cft 4,901.82 30.00 147,054.71 35.00 171,563.82 20.00 98,036.47 26.00 127,447.41 - 45.00 220,582.06 73.00 357,833.12
3 from outside
4 Supply and fill with manufactured sand Cft - 75.00
5 Supply and fill with approved quarry dust -
5.1 For Foundations ans earth beams Cft 855.59 55.00 47,057.66 175.00 149,728.91 50.00 42,779.69 55.00 47,057.66 68.00 58,180.38 55.00 47,057.66 73.00 62,458.34
5.2 For Plinth / Floors Cft 1,336.38 55.00 73,500.63 155.00 207,138.13 50.00 66,818.75 55.00 73,500.63 70.00 93,546.25 55.00 73,500.63 73.00 97,555.38
Surface treatment -
7 Anti Terminte treatment Sft 6,138.00 10.00 61,380.00 15.00 92,070.00 7.00 42,966.00 10.00 61,380.00 12.50 76,725.00 7.00 42,966.00 8.00 49,104.00
-
SUB TOTAL 701,051.59 899,564.50 587,210.35 504,277.28 549,561.91 813,631.97 1,107,353.55
B CONCRETE WORKS -
Plain Cement Concrete 1:4:8 (Grade M 10), as described
-
1 using 40 mm metal
i Under Foundations & Earth Beams Cft 1,139.65 140.00 159,551.12 180.00 205,137.16 120.00 136,758.11 160.00 182,344.14 145.00 165,249.38 150.00 170,947.63 154.00 175,506.23
ii Under Floors Cft 1,780.05 140.00 249,207.21 175.00 311,509.01 120.00 213,606.18 160.00 284,808.24 148.00 263,447.62 155.00 275,907.98 154.00 274,127.93

Vibrated Reinforced Concrete (1:1.5:3) (Grade M20), with


- - - -
minimum cement content of 340 kg/cum as described,
2
2.1 For Foundations , Isolated Footings Cft 2,210.25 230.00 508,357.50 225.00 497,306.25 210.00 464,152.50 210.00 464,152.50 235.00 519,408.75 230.00 508,357.50 241.00 532,670.25
2.2 For Plinth Beams Cft 1,160.16 230.00 266,835.94 230.00 266,835.94 220.00 255,234.38 210.00 243,632.81 240.00 278,437.50 250.00 290,039.06 245.00 284,238.28
2.3 For Lift pit wall Cft 129.38 230.00 29,756.25 270.00 34,931.25 230.00 29,756.25 220.00 28,462.50 250.00 32,343.75 260.00 33,637.50 271.00 35,060.63
2.4 For Neck Column Cft 325.22 230.00 74,800.31 270.00 87,809.06 230.00 74,800.31 220.00 71,548.13 240.00 78,052.50 250.00 81,304.69 262.00 85,207.31
2.5 For Column in Superstructure - - - - - -
i At Stilt Floor Cft 532.50 240.00 127,800.00 260.00 138,450.00 240.00 127,800.00 220.00 117,150.00 245.00 130,462.50 260.00 138,450.00 262.00 139,515.00
ii At First Floor Cft 532.50 240.00 127,800.00 270.00 143,775.00 250.00 133,125.00 230.00 122,475.00 255.00 135,787.50 275.00 146,437.50 265.00 141,112.50
iii At Second Floor Cft 532.50 240.00 127,800.00 275.00 146,437.50 255.00 135,787.50 240.00 127,800.00 265.00 141,112.50 290.00 154,425.00 268.00 142,710.00
v At Terrace Floor Cft 229.13 240.00 54,990.00 280.00 64,155.00 260.00 59,572.50 250.00 57,281.25 275.00 63,009.38 300.00 68,737.50 271.00 62,092.88
2.6 For Staircase - - - - - -
i At Stilt Floor Cft 63.50 240.00 15,240.00 260.00 16,510.00 240.00 15,240.00 230.00 14,605.00 240.00 15,240.00 280.00 17,780.00 262.00 16,637.00
ii At First Floor Cft 63.50 240.00 15,240.00 270.00 17,145.00 250.00 15,875.00 240.00 15,240.00 250.00 15,875.00 290.00 18,415.00 265.00 16,827.50
iii At Second Floor Cft 63.50 240.00 15,240.00 280.00 17,780.00 260.00 16,510.00 260.00 16,510.00 260.00 16,510.00 300.00 19,050.00 268.00 17,018.00
2.7 For Sill slabs at all levels Cft 54.38 240.00 13,050.00 290.00 15,768.75 240.00 13,050.00 270.00 14,681.25 270.00 14,681.25 250.00 13,593.75 271.00 14,735.63
2.8 For Suspended Beam - - - -
i At Stilt Floor Cft 1,024.41 250.00 256,101.56 225.00 230,491.41 230.00 235,613.44 220.00 225,369.38 250.00 256,101.56 260.00 266,345.63 262.00 268,394.44
ii At First Floor Cft 1,024.41 250.00 256,101.56 225.00 230,491.41 235.00 240,735.47 230.00 235,613.44 260.00 266,345.63 270.00 276,589.69 265.00 271,467.66
iii At Second Floor Cft 1,024.41 250.00 256,101.56 230.00 235,613.44 240.00 245,857.50 240.00 245,857.50 270.00 276,589.69 280.00 286,833.75 268.00 274,540.88
v At Terrace Floor Cft 91.50 250.00 22,875.00 235.00 21,502.50 245.00 22,417.50 250.00 22,875.00 280.00 25,620.00 290.00 26,535.00 271.00 24,796.50
2.9 For Suspended Slab - - - - - -

Page 1 of 5
PROPOSED RESIDENTIAL APARTMENTS IN THE CAMPUS OF MASJID-E-ABDUL ALI AT THANDAVARAYAN STREET, PURASAIWAKKAM.
ARCHITECT: M.S.MUSHTAQ AHMED, CHENNAI
BILL OF QUANTITIES

QS SHAREEF CONSTRUCTION TOPLINE ASSOCIATES BHARAT BUILDERS MKMS BUILDERS PERFECT BUILDERS CRYSTAL BUILDERS
Sl.No Description of Items Unit Quantity
Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount
i At Stilt Floor Cft 2,886.44 250.00 721,609.03 225.00 649,448.12 240.00 692,744.66 220.00 635,015.94 245.00 707,176.84 270.00 779,337.75 257.00 741,814.08
ii At First Floor Cft 2,886.44 250.00 721,609.03 225.00 649,448.12 245.00 707,176.84 230.00 663,880.30 255.00 736,041.21 280.00 808,202.11 260.00 750,473.39
iii At Second Floor Cft 2,886.44 250.00 721,609.03 230.00 663,880.30 250.00 721,609.03 240.00 692,744.66 265.00 764,905.57 290.00 837,066.47 263.00 759,132.69
v At Terrace Floor Cft 206.63 250.00 51,656.25 235.00 48,556.88 255.00 52,689.38 250.00 51,656.25 275.00 56,821.88 300.00 61,987.50 266.00 54,962.25
3 For Lintel - - - -
i At Stilt Floor Cft 5.63 250.00 1,406.25 250.00 1,406.25 235.00 1,321.88 250.00 1,406.25 240.00 1,350.00 260.00 1,462.50 268.00 1,507.50
ii At First Floor Cft 118.31 250.00 29,578.13 255.00 30,169.69 240.00 28,395.00 250.00 29,578.13 245.00 28,986.56 270.00 31,944.38 271.00 32,062.69
iii At Second Floor Cft 118.31 250.00 29,578.13 260.00 30,761.25 245.00 28,986.56 250.00 29,578.13 250.00 29,578.13 280.00 33,127.50 274.00 32,417.63
v At Terrace Floor Cft 8.44 250.00 2,109.38 265.00 2,235.94 250.00 2,109.38 250.00 2,109.38 255.00 2,151.56 285.00 2,404.69 277.00 2,337.19
3.1 For Sunshade, Loft & Counter slabs - - - - -
i At Stilt Floor Cft 272.44 250.00 68,109.38 250.00 68,109.38 240.00 65,385.00 240.00 65,385.00 245.00 66,747.19 260.00 70,833.75 268.00 73,013.25
ii At First Floor Cft 272.44 250.00 68,109.38 255.00 69,471.56 245.00 66,747.19 250.00 68,109.38 250.00 68,109.38 270.00 73,558.13 271.00 73,830.56
iii At Second Floor Cft 272.44 250.00 68,109.38 260.00 70,833.75 250.00 68,109.38 260.00 70,833.75 255.00 69,471.56 280.00 76,282.50 274.00 74,647.88
v At Terrace Floor Cft 8.00 250.00 2,000.00 265.00 2,120.00 255.00 2,040.00 270.00 2,160.00 260.00 2,080.00 290.00 2,320.00 277.00 2,216.00
3.2 For Facia - - - - - -
i At Stilt Floor Sft 110.03 90.00 9,902.25 260.00 28,606.50 200.00 22,005.00 250.00 27,506.25 250.00 27,506.25 200.00 22,005.00 268.00 29,486.70
ii At First Floor Sft 81.00 90.00 7,290.00 270.00 21,870.00 210.00 17,010.00 250.00 20,250.00 275.00 22,275.00 210.00 17,010.00 271.00 21,951.00
iii At Second Floor Sft 81.00 90.00 7,290.00 270.00 21,870.00 220.00 17,820.00 250.00 20,250.00 300.00 24,300.00 230.00 18,630.00 274.00 22,194.00
-
SUB TOTAL 5,086,813.60 5,040,436.41 4,930,040.91 4,870,869.54 5,301,775.62 5,629,559.44 5,448,705.40
C REINFORCEMENT WORKS -
Steel reinforcement of Fe-500 grade in concrete works
MT 63.20 75000.00 4,740,257.39 68000.00 4,297,833.36 75000.00 4,740,257.39 68000.00 4,297,833.36 79500.00 5,024,672.83 70000.00 4,424,240.23 70000.00 4,424,240.23
1 including hooks, cranks, etc. as described.
The contractor shall submit his prices for the
reinforcements (fix only) for the steel supplied by the MT 22.00
Employer (Including cutting, bending, lifting and laying)
2

SUB TOTAL 4,740,257.39 4,297,833.36 4,740,257.39 4,297,833.36 5,024,672.83 4,424,240.23 4,424,240.23


D FORMWORKS
Formwork to cement concrete work for horizontal and
1 vertical members as described to
1.1 For Foundations , Isolated Footings Sft 1,423.50 50.00 71,175.00 50.00 71,175.00 45.00 64,057.50 40.00 56,940.00 35.00 49,822.50 40.00 56,940.00 25.00 35,587.50
1.2 For Plinth Beams Sft 3,093.75 50.00 154,687.50 55.00 170,156.25 45.00 139,218.75 40.00 123,750.00 40.00 123,750.00 45.00 139,218.75 27.00 83,531.25
1.3 For Lift pit wall Sft 345.00 50.00 17,250.00 60.00 20,700.00 45.00 15,525.00 45.00 15,525.00 50.00 17,250.00 50.00 17,250.00 40.00 13,800.00
1.4 For Neck Column Sft 1,325.13 50.00 66,256.25 60.00 79,507.50 50.00 66,256.25 45.00 59,630.63 40.00 53,005.00 45.00 59,630.63 20.00 26,502.50
1.5 For Column in Superstructure Sft - - - - -
i At Stilt Floor Sft 2,170.00 60.00 130,200.00 45.00 97,650.00 50.00 108,500.00 40.00 86,800.00 45.00 97,650.00 50.00 108,500.00 20.00 43,400.00
ii At First Floor Sft 2,170.00 60.00 130,200.00 50.00 108,500.00 52.00 112,840.00 45.00 97,650.00 50.00 108,500.00 55.00 119,350.00 22.00 47,740.00
iii At Second Floor Sft 2,170.00 60.00 130,200.00 55.00 119,350.00 55.00 119,350.00 50.00 108,500.00 55.00 119,350.00 60.00 130,200.00 24.00 52,080.00
v At Terrace Floor Sft 983.00 60.00 58,980.00 60.00 58,980.00 57.00 56,031.00 55.00 54,065.00 60.00 58,980.00 65.00 63,895.00 26.00 25,558.00
1.6 For Staircase - - - - -

Page 2 of 5
PROPOSED RESIDENTIAL APARTMENTS IN THE CAMPUS OF MASJID-E-ABDUL ALI AT THANDAVARAYAN STREET, PURASAIWAKKAM.
ARCHITECT: M.S.MUSHTAQ AHMED, CHENNAI
BILL OF QUANTITIES

QS SHAREEF CONSTRUCTION TOPLINE ASSOCIATES BHARAT BUILDERS MKMS BUILDERS PERFECT BUILDERS CRYSTAL BUILDERS
Sl.No Description of Items Unit Quantity
Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount
i At Stilt Floor Sft 268.00 60.00 16,080.00 55.00 14,740.00 50.00 13,400.00 45.00 12,060.00 50.00 13,400.00 50.00 13,400.00 40.00 10,720.00
ii At First Floor Sft 268.00 60.00 16,080.00 60.00 16,080.00 52.00 13,936.00 45.00 12,060.00 55.00 14,740.00 55.00 14,740.00 42.00 11,256.00
iii At Second Floor Sft 268.00 60.00 16,080.00 65.00 17,420.00 55.00 14,740.00 50.00 13,400.00 60.00 16,080.00 60.00 16,080.00 44.00 11,792.00
1.7 For Sill slabs at all levels Sft 145.00 60.00 8,700.00 70.00 10,150.00 52.00 7,540.00 55.00 7,975.00 65.00 9,425.00 60.00 8,700.00 25.00 3,625.00
1.8 For Suspended Beam 60.00 - - - - -
i At Stilt Floor Sft 2,727.75 60.00 163,665.00 48.00 130,932.00 50.00 136,387.50 45.00 122,748.75 45.00 122,748.75 60.00 163,665.00 40.00 109,110.00
ii At First Floor Sft 2,727.75 60.00 163,665.00 53.00 144,570.75 52.00 141,843.00 50.00 136,387.50 50.00 136,387.50 65.00 177,303.75 42.00 114,565.50
iii At Second Floor Sft 2,727.75 60.00 163,665.00 56.00 152,754.00 55.00 150,026.25 55.00 150,026.25 55.00 150,026.25 70.00 190,942.50 44.00 120,021.00
v At Terrace Floor Sft 244.00 60.00 14,640.00 60.00 14,640.00 57.00 13,908.00 60.00 14,640.00 60.00 14,640.00 75.00 18,300.00 46.00 11,224.00
1.9 For Suspended Slab 60.00 -
i At Stilt Floor Sft 5,969.57 60.00 358,174.03 46.00 274,600.09 50.00 298,478.36 45.00 268,630.52 45.00 268,630.52 60.00 358,174.03 40.00 238,782.69
ii At First Floor Sft 5,969.57 60.00 358,174.03 50.00 298,478.36 52.00 310,417.49 50.00 298,478.36 50.00 298,478.36 65.00 388,021.87 42.00 250,721.82
iii At Second Floor Sft 5,969.57 60.00 358,174.03 54.00 322,356.63 55.00 328,326.20 55.00 328,326.20 55.00 328,326.20 70.00 417,869.70 44.00 262,660.96
v At Terrace Floor Sft 592.75 60.00 35,565.00 60.00 35,565.00 57.00 33,786.75 60.00 35,565.00 60.00 35,565.00 75.00 44,456.25 46.00 27,266.50
2 For Lintel
i At Stilt Floor Sft 20.25 60.00 1,215.00 60.00 1,215.00 50.00 1,012.50 45.00 911.25 50.00 1,012.50 60.00 1,215.00 40.00 810.00
ii At First Floor Sft 557.06 60.00 33,423.75 60.00 33,423.75 52.00 28,967.25 50.00 27,853.13 55.00 30,638.44 65.00 36,209.06 42.00 23,396.63
iii At Second Floor Sft 557.06 60.00 33,423.75 60.00 33,423.75 55.00 30,638.44 55.00 30,638.44 60.00 33,423.75 70.00 38,994.38 44.00 24,510.75
v At Terrace Floor Sft 33.75 60.00 2,025.00 65.00 2,193.75 57.00 1,923.75 60.00 2,025.00 65.00 2,193.75 75.00 2,531.25 46.00 1,552.50
2.1 For Sunshade, Loft & Counter slabs
i At Stilt Floor Sft
ii At First Floor Sft 1,089.75 60.00 65,385.00 60.00 65,385.00 50.00 54,487.50 40.00 43,590.00 45.00 49,038.75 60.00 65,385.00 40.00 43,590.00
iii At Second Floor Sft 1,089.75 60.00 65,385.00 63.00 68,654.25 52.00 56,667.00 50.00 54,487.50 50.00 54,487.50 65.00 70,833.75 42.00 45,769.50
v At Terrace Floor Sft 27.00 60.00 1,620.00 67.00 1,809.00 55.00 1,485.00 60.00 1,620.00 55.00 1,485.00 65.00 1,755.00 44.00 1,188.00
2.2 For Facia -
i At Stilt Floor Sft 110.03 70.00 7,701.75 65.00 7,151.63 50.00 5,501.25 50.00 5,501.25 50.00 5,501.25 110.00 12,102.75 40.00 4,401.00
ii At First Floor Sft 81.00 70.00 5,670.00 65.00 5,265.00 52.00 4,212.00 60.00 4,860.00 55.00 4,455.00 110.00 8,910.00 42.00 3,402.00
iii At Second Floor Sft 81.00 70.00 5,670.00 65.00 5,265.00 55.00 4,455.00 70.00 5,670.00 60.00 4,860.00 110.00 8,910.00 44.00 3,564.00
-
SUB TOTAL 2,653,130.10 2,382,091.71 2,333,917.74 2,180,314.77 2,223,851.02 2,753,483.67 1,652,129.09
E MASONRY WORKS
First quality machine moulded chamber brick masonry
1 230 mm thick
i In Sub-Structure Cft 511.45 170.00 86,947.03 160.00 81,832.50 160.00 81,832.50 180.00 92,061.56 190.00 97,176.09 190.00 97,176.09 244.00 124,794.56
ii In Stilt Floor Cft 359.81 175.00 62,967.19 170.00 61,168.13 165.00 59,369.06 190.00 68,364.38 200.00 71,962.50 200.00 71,962.50 244.00 87,794.25
iii In First Floor Cft 2,961.47 180.00 533,064.38 175.00 518,257.03 170.00 503,449.69 200.00 592,293.75 210.00 621,908.44 210.00 621,908.44 247.00 731,482.78
iv In Second Floor Cft 2,961.47 185.00 547,871.72 175.00 518,257.03 175.00 518,257.03 210.00 621,908.44 220.00 651,523.13 220.00 651,523.13 250.00 740,367.19
vi In Terrace Floor Cft 1,154.25 195.00 225,078.75 180.00 207,765.00 180.00 207,765.00 220.00 253,935.00 230.00 265,477.50 230.00 265,477.50 253.00 292,025.25
vii For Stairs & Steps Cft 160.00 200.00 32,000.00 190.00 30,400.00 200.00 32,000.00 200.00 32,000.00 215.00 34,400.00 250.00 40,000.00 256.00 40,960.00
First quality machine moulded chamber brick masonry
2 115 mm thick
Page 3 of 5
PROPOSED RESIDENTIAL APARTMENTS IN THE CAMPUS OF MASJID-E-ABDUL ALI AT THANDAVARAYAN STREET, PURASAIWAKKAM.
ARCHITECT: M.S.MUSHTAQ AHMED, CHENNAI
BILL OF QUANTITIES

QS SHAREEF CONSTRUCTION TOPLINE ASSOCIATES BHARAT BUILDERS MKMS BUILDERS PERFECT BUILDERS CRYSTAL BUILDERS
Sl.No Description of Items Unit Quantity
Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount
i In Stilt Floor Sft 105.00 - 110.00
ii In First Floor Sft 1,671.88 110.00 183,906.25 75.00 125,390.63 110.00 183,906.25 120.00 200,625.00 80.00 133,750.00 130.00 217,343.75 162.00 270,843.75
iii In Second Floor Sft 1,671.88 115.00 192,265.63 80.00 133,750.00 115.00 192,265.63 130.00 217,343.75 90.00 150,468.75 140.00 234,062.50 165.00 275,859.38
v In Terrace Floor Sft 457.50 125.00 57,187.50 85.00 38,887.50 120.00 54,900.00 140.00 64,050.00 100.00 45,750.00 150.00 68,625.00 168.00 76,860.00

SUB TOTAL 1,921,288.44 1,715,707.81 1,833,745.16 2,142,581.88 2,072,416.41 2,268,078.91 2,640,987.16


F PLASTERING WORKS
1 Ceiling Plastering Sft 19,995.57 38.00 759,831.73 37.00 739,836.16 42.00 839,814.01 48.00 959,787.44 34.00 679,849.44 50.00 999,778.59 60.00 1,199,734.31
2 Internal Wall plastering Sft 41,943.50 40.00 1,677,740.00 35.00 1,468,022.50 40.00 1,677,740.00 48.00 2,013,288.00 38.00 1,593,853.00 55.00 2,306,892.50 59.00 2,474,666.50
3 External water proof Wall Plastering Sft 13,953.44 45.00 627,904.80 38.00 530,230.72 40.00 558,137.60 55.00 767,439.20 44.00 613,951.36 60.00 837,206.40 63.00 879,066.72
4 Rough cement plastering 12mm thick Sft 3,197.50 35.00 111,912.50 35.00 111,912.50 37.00 118,307.50 45.00 143,887.50 39.00 124,702.50 45.00 143,887.50 63.00 201,442.50
5 Plaster band with cement mortar 1:4 Rft 1,262.00 50.00 63,100.00 50.00 63,100.00 50.00 63,100.00 120.00 151,440.00 55.00 69,410.00 60.00 75,720.00 76.00 95,912.00

SUB TOTAL 3,240,489.03 2,913,101.88 3,257,099.11 4,035,842.14 3,081,766.30 4,363,484.99 4,850,822.03


G ROOFING WORKS
1 Terracing with brick jelly lime concrete Cft 1,475.00 120.00 177,000.00 200.00 295,000.00 120.00 177,000.00 120.00 177,000.00 150.00 221,250.00 240.00 354,000.00 96.00 141,600.00
West coast pressed tiles of approved quality set in C.M.
Sft 6,138.00 80.00 491,040.00 80.00 491,040.00 70.00 429,660.00 90.00 552,420.00 90.00 552,420.00 130.00 797,940.00 125.00 767,250.00
2 1:3

SUB TOTAL 668,040.00 786,040.00 606,660.00 729,420.00 773,670.00 1,151,940.00 908,850.00


H CARPENTARY & JOINERY
Country wood frame with Double leaf panelled door Sft 294.00 1,500.00 441,000.00 900.00 264,600.00 1200.00 352,800.00 2100.00 617,400.00 2450.00 720,300.00 2600.00 764,400.00 1950.00 573,300.00
1
2 Country wood frame with Hardcore flush door Sft 1,071.00 1,250.00 1,338,750.00 650.00 696,150.00 900.00 963,900.00 1200.00 1,285,200.00 1050.00 1,124,550.00 600.00 642,600.00 1950.00 2,088,450.00
3 Country wood frame with laminated flush door Sft 420.00 1,000.00 420,000.00 700.00 294,000.00 1000.00 420,000.00 1400.00 588,000.00 975.00 409,500.00 550.00 231,000.00 1950.00 819,000.00
4 UPVC windows & Ventilators
4.1 WINDOWS Sft 1,668.75 600.00 1,001,250.00 480.00 801,000.00 425.00 709,218.75 650.00 1,084,687.50 595.00 992,906.25 750.00 1,251,562.50 800.00 1,335,000.00
4.2 VENTILATORS Sft 96.00 600.00 57,600.00 500.00 48,000.00 400.00 38,400.00 750.00 72,000.00 545.00 52,320.00 600.00 57,600.00 800.00 76,800.00

SUB TOTAL 3,258,600.00 2,103,750.00 2,484,318.75 3,647,287.50 3,299,576.25 2,947,162.50 4,892,550.00


I IRON & METAL WORK -
1.1 900 high SS Handrails for Stairacse Rft 70.00 1,250.00 87,500.00 1,050.00 73,500.00 1200.00 84,000.00 1000.00 70,000.00 1225.00 85,750.00 1200.00 84,000.00 450.00 31,500.00
1.2 900 high SS Handrails for STEPS & CORRIDOR Rft 106.00 1,250.00 132,500.00 1,050.00 111,300.00 1200.00 127,200.00 1000.00 106,000.00 1225.00 129,850.00 1200.00 127,200.00 450.00 47,700.00
Fixing of MS grill out of MS round/12mm x 12mm square
Kg 2,647.13 120.00 317,655.00 100.00 264,712.50 100.00 264,712.50 100.00 264,712.50 98.00 259,418.25 100.00 264,712.50 200.00 529,425.00
2 rods and flats as per design

SUB TOTAL 537,655.00 449,512.50 475,912.50 440,712.50 475,018.25 475,912.50 608,625.00


J FLOORING & DADOING -
1 Vitrified tile flooring 4' x 2' flooring Sft 3,186.00 140.00 446,040.00 120.00 382,320.00 150.00 477,900.00 130.00 414,180.00 155.00 493,830.00 180.00 573,480.00 125.00 398,250.00
2 Ditto above, but 100 mm high skirting Rft 806.50 50.00 40,325.00 75.00 60,487.50 100.00 80,650.00 80.00 64,520.00 75.00 60,487.50 100.00 80,650.00 125.00 100,812.50
3 Vitrified tile flooring 2' x 2' flooring Sft 4,501.50 120.00 540,180.00 110.00 495,165.00 140.00 630,210.00 120.00 540,180.00 135.00 607,702.50 150.00 675,225.00 125.00 562,687.50
4 Ditto above, but 100 mm high skirting Rft 969.50 45.00 43,627.50 75.00 72,712.50 100.00 96,950.00 50.00 48,475.00 65.00 63,017.50 100.00 96,950.00 125.00 121,187.50
5 Anti skid Vitrified tile flooring 1' x 1' flooring Sft 605.88 100.00 60,587.50 105.00 63,616.88 100.00 60,587.50 110.00 66,646.25 110.00 66,646.25 110.00 66,646.25 125.00 75,734.38
6 Glazed tile for dadooring upto 7'0" ht Sft 3,197.50 110.00 351,725.00 90.00 287,775.00 120.00 383,700.00 110.00 351,725.00 125.00 399,687.50 120.00 383,700.00 130.00 415,675.00
Polished Jet Black granite - 20mm thick counter for
Sft 142.00 380.00 53,960.00 275.00 39,050.00 225.00 31,950.00 350.00 49,700.00 325.00 46,150.00 400.00 56,800.00 237.00 33,654.00
7 kitchen
8 18mm thick granite Granite Cladding Sft 170.00 350.00 59,500.00 275.00 46,750.00 300.00 51,000.00 350.00 59,500.00 350.00 59,500.00 350.00 59,500.00 237.00 40,290.00
9 CERAMIC STEP tiles, size 1' x 1' flooring Sft 640.00 100.00 64,000.00 150.00 96,000.00 100.00 64,000.00 120.00 76,800.00 140.00 89,600.00 200.00 128,000.00 95.00 60,800.00
10 Ditto above, but 100 mm high skirting Rft 200.00 40.00 8,000.00 75.00 15,000.00 75.00 15,000.00 80.00 16,000.00 70.00 14,000.00 100.00 20,000.00 95.00 19,000.00
Page 4 of 5
PROPOSED RESIDENTIAL APARTMENTS IN THE CAMPUS OF MASJID-E-ABDUL ALI AT THANDAVARAYAN STREET, PURASAIWAKKAM.
ARCHITECT: M.S.MUSHTAQ AHMED, CHENNAI
BILL OF QUANTITIES

QS SHAREEF CONSTRUCTION TOPLINE ASSOCIATES BHARAT BUILDERS MKMS BUILDERS PERFECT BUILDERS CRYSTAL BUILDERS
Sl.No Description of Items Unit Quantity
Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount Rate Amount
Providing and laying granolithic flooring 25mm thk in CM
Sft 6,071.81 40.00 242,872.50 110.00 667,899.38 50.00 303,590.63 45.00 273,231.56 55.00 333,949.69 120.00 728,617.50 265.00 1,609,030.31
11 1:4

SUB TOTAL 1,910,817.50 2,226,776.25 2,195,538.13 1,960,957.81 2,234,570.94 2,869,568.75 3,437,121.19


K PAINTING WORK
1 Emulsion Painting for internal walls Sft 37,937.50 20.00 758,750.00 20.00 758,750.00 20.00 758,750.00 22.00 834,625.00 24.00 910,500.00 28.00 1,062,250.00 30.00 1,138,125.00
2 Synthetic enamel paint for metals Sft 2,647.13 18.00 47,648.25 18.00 47,648.25 20.00 52,942.50 25.00 66,178.13 27.00 71,472.38 25.00 66,178.13 20.00 52,942.50
3 Synthetic enamel paint for wooden doors Sft 4,044.60 18.00 72,802.80 18.00 72,802.80 20.00 80,892.00 25.00 101,115.00 125.00 505,575.00 25.00 101,115.00 25.00 101,115.00
APEX/ JOTUN weather coat emulsion for external walls Sft 13,953.44 15.00 209,301.60 22.00 306,975.68 18.00 251,161.92 20.00 279,068.80 22.00 306,975.68 30.00 418,603.20 28.00 390,696.32
4
5 Oil bound distemper for Ceiling Sft 19,995.57 12.00 239,946.86 22.00 439,902.58 15.00 299,933.58 18.00 359,920.29 17.00 339,924.72 22.00 439,902.58 30.00 599,867.15
White wash to ceiling, sides and soffit of beams etc. at all
Sft 3,798.19 8.00 30,385.52 10.00 37,981.90 7.00 26,587.33 6.00 22,789.14 12.00 45,578.28 22.00 83,560.18 15.00 56,972.85
6 levels.

SUB TOTAL 1,358,835.03 1,664,061.21 1,470,267.33 1,663,696.36 2,180,026.05 2,171,609.08 2,339,718.82


L WATERPROOFING & GROUTING WORKS
Refer particular specification for waterproofing over RCC
slab and other concrete structures. The Bidder shall
submit with his Bid, a complete set of specifications and
other technical informationrelevant to the products he
intends to incorporate in the works, for water proofing
purposes.

Waterproofing treatment over slab shall be of membrane


type unless specified otherwise in the drawings or
specifications, and shall be strictly in accordance with the
Manufacturer’sSpecifications.
Providing and laying plain cement concrete broken brick
Cft 504.00 120.00 60,480.00 60.00 30,240.00 120.00 60,480.00 95.00 47,880.00 150.00 75,600.00 220.00 110,880.00 90.00 45,360.00
1 jelly 1:2:4
Chemical waterproofing treatment using Sika Plastocrete
Sft 1,296.00 60.00 77,760.00 40.00 51,840.00 60.00 77,760.00 120.00 155,520.00 75.00 97,200.00 30.00 38,880.00 145.00 187,920.00
2 or equivalent system
Waterproof plastering using CM1:3 12mm thick with
Sft 450.00 50.00 22,500.00 50.00 22,500.00 40.00 18,000.00 120.00 54,000.00 75.00 33,750.00 70.00 31,500.00 85.00 38,250.00
3 waterproofing compound

160,740.00 104,580.00 156,240.00 257,400.00 206,550.00 181,260.00 271,530.00


N SERVICES
Supply, installation testing & commissioning of electrical
Sft 18,414.00 90.00 1,657,260.00 95.00 1,749,330.00 125.00 2,301,750.00 150.00 2,762,100.00 150.00 2,762,100.00 110.00 2,025,540.00 175.00 3,222,450.00
1 Work
2 WATER SUPPLY, SEWAGE & DRAINAGE SYSTEM
Supply , Installation, Testing & commissioning of Water
Sft 18,414.00 100.00 1,841,400.00 68.00 1,252,152.00 100.00 1,841,400.00 150.00 2,762,100.00 150.00 2,762,100.00 110.00 2,025,540.00 150.00 2,762,100.00
2.1 supply, Sewage & Drainage works

SUB TOTAL 3,498,660.00 3,001,482.00 4,143,150.00 5,524,200.00 5,524,200.00 4,051,080.00 5,984,550.00

GRAND TOTAL 29,736,378 27,584,938 29,214,357 32,255,393 32,947,656 34,101,012 38,567,182

Page 5 of 5