Main Receiver Packaging Machine at Packaging floor at Boiler room Steam Steam Steam Gas Production Time Steam Steam Steam Boiler Run by Adjustment Pressure Pressure at Temperature Temperature Pressure at Temperature C-Flute B-Flute Triplex Heater Valve Heating Plate Pressure Floor at Boiler Packaging at Packaging at Boiler room Packaging at Packaging Temperature Temperature Temperature Phaser Temperature room Steam Steam receiver Machine Machine receiver Receiver Receiver 5Ton/h &2.5 Ton/hr and 4 EGB Boiler 09:00AM 5.2 Kg 129⁰C 5.8 Kg 157⁰C 5.5 Kg 154⁰C 122⁰C 118⁰C 128⁰C 150⁰C 132⁰C 15 PSI ON Ton/h Boiler Starting run by Gas 5Ton/h &2.5 Ton/hr and 4 EGB Boiler 10:00 AM 6.4 Kg 153⁰C 5.8 Kg 153⁰C 5.2 Kg 146⁰C 120⁰C 119⁰C 118⁰C 141⁰C 150⁰C 15 PSI ON Ton/h Boiler Running run by Gas 5Ton/h &2.5 Ton/hr and 4 EGB Boiler 11:00 AM 6.2 Kg 157⁰C 6.0 Kg 154⁰C 5.2 Kg 145⁰C 122⁰C 118⁰C 117⁰C 138⁰C 150⁰C 15 PSI ON Ton/h Boiler Running run by Gas 5Ton/h &2.5 Ton/hr and 4 EGB Boiler 12:00 PM 6.0 Kg 152⁰C 5.2 Kg 148⁰C 4.8 Kg 147⁰C 119⁰C 118⁰C 119⁰C 137⁰C 148⁰C 15 PSI ON Ton/h Boiler Running run by Gas 5Ton/h &2.5 Ton/hr and 4 EGB Boiler 1:00 PM 5.8 Kg 155⁰C 5.0 Kg 151⁰C 4.5 Kg 147⁰C 122⁰C 116⁰C 118⁰C 138⁰C 143⁰C 15 PSI ON Ton/h Boiler Running run by Gas 5Ton/h &2.5 Ton/hr and 4 EGB Boiler 2:00 PM 5.7 Kg 142⁰C 5.4 Kg 141⁰C 5.1 Kg 140⁰C 120⁰C 121⁰C 119⁰C 136⁰C 140⁰C 15 PSI ON Ton/h Boiler Running run by Gas 5Ton/h &2.5 Ton/hr and 4 EGB Boiler 3:00 PM 6.8 Kg 160⁰C 6.3 Kg 158⁰C 5.5 Kg 150⁰C 126⁰C 123⁰C 122⁰C 139⁰C 152⁰C 15 PSI ON Ton/h Boiler Running run by Gas 5Ton/h &2.5 Ton/hr and 4 EGB Boiler 4:00 PM 6.5 Kg 154⁰C 5.2 Kg 150⁰C 4.8 Kg 143⁰C 121⁰C 123⁰C 118⁰C 136⁰C 148⁰C 15 PSI ON Ton/h Boiler Running run by Gas