Steam pressure information for Packaging Machine


Main Receiver
Packaging Machine at Packaging floor
at Boiler room
Steam Steam Steam Gas Production
Time Steam Steam Steam Boiler Run by Adjustment
Pressure Pressure at Temperature
Temperature Pressure at Temperature C-Flute B-Flute Triplex Heater Valve Heating Plate Pressure Floor
at Boiler Packaging at Packaging
at Boiler room Packaging at Packaging Temperature Temperature Temperature Phaser Temperature
room Steam Steam
receiver Machine Machine
receiver Receiver Receiver
5Ton/h &2.5
Ton/hr and 4 EGB Boiler
09:00AM 5.2 Kg 129⁰C 5.8 Kg 157⁰C 5.5 Kg 154⁰C 122⁰C 118⁰C 128⁰C 150⁰C 132⁰C 15 PSI ON
Ton/h Boiler Starting
run by Gas
5Ton/h &2.5
Ton/hr and 4 EGB Boiler
10:00 AM 6.4 Kg 153⁰C 5.8 Kg 153⁰C 5.2 Kg 146⁰C 120⁰C 119⁰C 118⁰C 141⁰C 150⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 4 EGB Boiler
11:00 AM 6.2 Kg 157⁰C 6.0 Kg 154⁰C 5.2 Kg 145⁰C 122⁰C 118⁰C 117⁰C 138⁰C 150⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 4 EGB Boiler
12:00 PM 6.0 Kg 152⁰C 5.2 Kg 148⁰C 4.8 Kg 147⁰C 119⁰C 118⁰C 119⁰C 137⁰C 148⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 4 EGB Boiler
1:00 PM 5.8 Kg 155⁰C 5.0 Kg 151⁰C 4.5 Kg 147⁰C 122⁰C 116⁰C 118⁰C 138⁰C 143⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 4 EGB Boiler
2:00 PM 5.7 Kg 142⁰C 5.4 Kg 141⁰C 5.1 Kg 140⁰C 120⁰C 121⁰C 119⁰C 136⁰C 140⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 4 EGB Boiler
3:00 PM 6.8 Kg 160⁰C 6.3 Kg 158⁰C 5.5 Kg 150⁰C 126⁰C 123⁰C 122⁰C 139⁰C 152⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas
5Ton/h &2.5
Ton/hr and 4 EGB Boiler
4:00 PM 6.5 Kg 154⁰C 5.2 Kg 150⁰C 4.8 Kg 143⁰C 121⁰C 123⁰C 118⁰C 136⁰C 148⁰C 15 PSI ON
Ton/h Boiler Running
run by Gas

CHECKED BY ASSISTANT MANAGER MANAGER


MD. MUNZURUL KADER (MECHANICAL) (MAINTENANCE)