You are on page 1of 6

PLS-CADD Version 14.

40x64 11:14:24 PM Monday, November 25, 2019


Nepal Electricity Authority Training Center
Project Name: 'd:\koshi corridor 220kv tlp\kalpataru\line profile & tower schedule\quad
\letter 74- quad line (hilly portion) tower schedule and wind weight report rev-1\backup
\k2=1.08-220-quad-line-m4.DON'

EMF Calculation Notes:


1) All calculations based on the EPRI Red Book methods (2nd Edition, 1982 - infinite
straight wire with flat earth approximation).
2) These approximations are only valid for low frequency (50-60Hz) AC transmission
lines.
3) Bundles are modeled with an equivalent conductor as per EPRI Red Book 8.3.1.
4) The effects of earth return currents (earth resistivity) are ignored when calculating
the magnetic field.
5) Wire position is determined by the currently displayed weather case.
6) Wire height used is the height of the wire where the target point is projected upon
it.
7) All calculations assume ground is flat with same elevation as that of centerline.

Meter height above centerline ground: 1.00 (m)


Cross section offset for graph +/-: 40.00 (m)
Result interval for graph: 1.00 (m)
Electric field limit: 1000.00 (kV/m)
Magnetic field limit: 1000.00 (uT)

EMF calculation includes only wires going from structure 127 to structure 128

EMF Circuit Data:

Set Phase Conductors Voltage Current Phase Bundle


# # Per Phase Ph-Ph Angle Diameter
(kV) (Amps) (deg) (cm)
------------------------------------------------------
1 1 1 0 0.000 0 0.000
2 1 1 0 0.000 0 0.000
11 1 4 220 3200.000 0 45.000
12 1 4 220 3200.000 120 45.000
13 1 4 220 3200.000 -120 45.000
24 1 4 220 3200.000 0 45.000
25 1 4 220 3200.000 120 45.000
26 1 4 220 3200.000 -120 45.000

Calculated EMF Circuit Data For Last Point:

Wire station and offset are based on alignment closest to point on wire.
In the case of wires that are not parallel, this may result in different stations
for the wires and centerline.

Set Phase Weather Cable Wind Wire Wire Wire Wire Wire
Eqv. Wire Voltage
# # Case Condition From X Y Z Station Offset
Diameter To Gnd.
(m) (m) (m) (m) (m)
(cm) (kV)
------------------------------------------------------------------------------------------
-----------------
1 1 53 DEG NIL WIND Max Sag RS Left 531136.67 2970665.13 1223.11 38688.24 4.19
1.098 0
2 1 53 DEG NIL WIND Max Sag RS Left 531140.32 2970657.59 1221.28 38688.24 -4.19
1.340 0
11 1 85 DEG NIL WIND Max Sag RS Left 531135.93 2970666.63 1204.22 38688.24 5.87
32.804 127
12 1 85 DEG NIL WIND Max Sag RS Left 531135.61 2970667.29 1197.08 38688.24 6.60
32.804 127
13 1 85 DEG NIL WIND Max Sag RS Left 531134.99 2970668.58 1189.70 38688.24 8.03

Nepal Electricity Authority Training Center Page 1/6


32.804 127
24 1 85 DEG NIL WIND Max Sag RS Left 531141.63 2970654.88 1203.61 38688.24 -7.20
32.804 127
25 1 85 DEG NIL WIND Max Sag RS Left 531142.03 2970654.05 1196.44 38688.25 -8.12
32.804 127
26 1 85 DEG NIL WIND Max Sag RS Left 531142.75 2970652.54 1188.95 38688.25 -9.79
32.804 127

Maximum magnetic field of 1.50 (uT) found at station 38688.24, offset -1.00 (m)
Maximum electric field of 0.187 (kV/m) found at station 38688.24, offset -1.00 (m)

Nepal Electricity Authority Training Center Page 2/6


EMF Calculation Results:

Station Offset X Y Z B B B Phase B rms E E E


Phase E Axis E rms
Real Img. Angle Res. Real Img.
Angle Angle Res.
(m) (m) (m) (m) (m) (uT) (uT) (deg) (uT)(kV/m) (kV/m)
(deg) (deg)(kV/m)
------------------------------------------------------------------------------------------
-------------------
38688.24 -40.00 531155.95 2970625.37 1093.75 1.117 0.70777 32.4 1.322 0.087 0.11185
52.0 89.2 0.142
38688.24 -39.00 531155.51 2970626.27 1093.75 1.124 0.71227 32.4 1.330 0.089 0.11321
51.9 89.2 0.144
38688.24 -38.00 531155.08 2970627.17 1093.75 1.130 0.71671 32.4 1.338 0.090 0.11456
51.8 89.3 0.146
38688.24 -37.00 531154.64 2970628.07 1093.75 1.137 0.72107 32.4 1.346 0.091 0.11589
51.7 89.3 0.148
38688.24 -36.00 531154.20 2970628.97 1093.75 1.143 0.72536 32.4 1.354 0.093 0.11721
51.6 89.3 0.149
38688.24 -35.00 531153.77 2970629.87 1093.75 1.149 0.72958 32.4 1.361 0.094 0.11851
51.6 89.3 0.151
38688.24 -34.00 531153.33 2970630.77 1093.75 1.156 0.73371 32.4 1.369 0.095 0.11980
51.5 89.3 0.153
38688.24 -33.00 531152.89 2970631.67 1093.75 1.162 0.73777 32.4 1.376 0.097 0.12107
51.4 89.3 0.155
38688.24 -32.00 531152.46 2970632.57 1093.75 1.168 0.74173 32.4 1.383 0.098 0.12232
51.3 89.4 0.157
38688.24 -31.00 531152.02 2970633.47 1093.75 1.173 0.74561 32.4 1.390 0.099 0.12355
51.3 89.4 0.158
38688.24 -30.00 531151.58 2970634.37 1093.75 1.179 0.74940 32.4 1.397 0.100 0.12475
51.2 89.4 0.160
38688.24 -29.00 531151.15 2970635.27 1093.75 1.185 0.75309 32.4 1.404 0.102 0.12594
51.1 89.4 0.162
38688.24 -28.00 531150.71 2970636.17 1093.75 1.190 0.75668 32.5 1.410 0.103 0.12709
51.0 89.4 0.163

Nepal Electricity Authority Training Center Page 3/6


38688.24 -27.00 531150.27 2970637.07 1093.75 1.195 0.76017 32.5 1.416 0.104 0.12822
51.0 89.5 0.165
38688.24 -26.00 531149.84 2970637.96 1093.75 1.200 0.76355 32.5 1.423 0.105 0.12932
50.9 89.5 0.167
38688.24 -25.00 531149.40 2970638.86 1093.75 1.205 0.76683 32.5 1.428 0.106 0.13040
50.9 89.5 0.168
38688.24 -24.00 531148.97 2970639.76 1093.75 1.210 0.76999 32.5 1.434 0.107 0.13143
50.8 89.5 0.170
38688.24 -23.00 531148.53 2970640.66 1093.75 1.214 0.77304 32.5 1.440 0.108 0.13244
50.8 89.5 0.171
38688.24 -22.00 531148.09 2970641.56 1093.75 1.219 0.77598 32.5 1.445 0.109 0.13341
50.7 89.5 0.172
38688.24 -21.00 531147.66 2970642.46 1093.75 1.223 0.77880 32.5 1.450 0.110 0.13435
50.7 89.6 0.174
38688.24 -20.00 531147.22 2970643.36 1093.75 1.227 0.78149 32.5 1.455 0.111 0.13525
50.6 89.6 0.175
38688.24 -19.00 531146.78 2970644.26 1093.75 1.231 0.78406 32.5 1.459 0.112 0.13611
50.6 89.6 0.176
38688.24 -18.00 531146.35 2970645.16 1093.75 1.235 0.78651 32.5 1.464 0.113 0.13693
50.5 89.6 0.177
38688.24 -17.00 531145.91 2970646.06 1093.75 1.238 0.78882 32.5 1.468 0.114 0.13772
50.5 89.7 0.178
38688.24 -16.00 531145.47 2970646.96 1093.75 1.241 0.79101 32.5 1.472 0.114 0.13846
50.5 89.7 0.180
38688.24 -15.00 531145.04 2970647.86 1093.75 1.244 0.79306 32.5 1.476 0.115 0.13915
50.4 89.7 0.181
38688.24 -14.00 531144.60 2970648.76 1093.75 1.247 0.79498 32.5 1.479 0.116 0.13981
50.4 89.7 0.181
38688.24 -13.00 531144.16 2970649.66 1093.75 1.250 0.79676 32.5 1.482 0.116 0.14041
50.4 89.7 0.182
38688.24 -12.00 531143.73 2970650.56 1093.75 1.252 0.79840 32.5 1.485 0.117 0.14097
50.3 89.8 0.183
38688.24 -11.00 531143.29 2970651.46 1093.75 1.255 0.79990 32.5 1.488 0.117 0.14149
50.3 89.8 0.184
38688.24 -10.00 531142.85 2970652.36 1093.75 1.257 0.80126 32.5 1.490 0.118 0.14196
50.3 89.8 0.185
38688.24 -9.00 531142.42 2970653.26 1093.75 1.259 0.80248 32.5 1.493 0.118 0.14238
50.3 89.8 0.185
38688.24 -8.00 531141.98 2970654.16 1093.75 1.260 0.80355 32.5 1.495 0.119 0.14275
50.2 89.8 0.186
38688.24 -7.00 531141.55 2970655.06 1093.75 1.262 0.80448 32.5 1.496 0.119 0.14307
50.2 89.9 0.186
38688.24 -6.00 531141.11 2970655.96 1093.75 1.263 0.80527 32.5 1.498 0.119 0.14334
50.2 89.9 0.187
38688.24 -5.00 531140.67 2970656.86 1093.75 1.264 0.80590 32.5 1.499 0.120 0.14356
50.2 89.9 0.187
38688.24 -4.00 531140.24 2970657.76 1093.75 1.265 0.80639 32.5 1.500 0.120 0.14372
50.2 89.9 0.187
38688.24 -3.00 531139.80 2970658.66 1093.75 1.265 0.80674 32.5 1.500 0.120 0.14384
50.2 90.0 0.187
38688.24 -2.00 531139.36 2970659.56 1093.75 1.265 0.80693 32.5 1.501 0.120 0.14391
50.2 90.0 0.187
38688.24 -1.00 531138.93 2970660.46 1093.75 1.266 0.80698 32.5 1.501 0.120 0.14392
50.2 90.0 0.187
38688.24 -0.00 531138.49 2970661.36 1093.75 1.265 0.80687 32.5 1.501 0.120 0.14389
50.2 90.0 0.187
38688.24 1.00 531138.05 2970662.26 1093.75 1.265 0.80663 32.5 1.500 0.120 0.14380
50.2 90.0 0.187
38688.24 2.00 531137.62 2970663.16 1093.75 1.265 0.80623 32.5 1.500 0.120 0.14366
50.2 90.1 0.187
38688.24 3.00 531137.18 2970664.06 1093.75 1.264 0.80568 32.5 1.499 0.120 0.14347
50.2 90.1 0.187
38688.24 4.00 531136.74 2970664.96 1093.75 1.263 0.80499 32.5 1.498 0.119 0.14323
50.2 90.1 0.186
38688.24 5.00 531136.31 2970665.86 1093.75 1.262 0.80415 32.5 1.496 0.119 0.14293

Nepal Electricity Authority Training Center Page 4/6


50.2 90.1 0.186
38688.24 6.00 531135.87 2970666.76 1093.75 1.260 0.80317 32.5 1.494 0.119 0.14259
50.2 90.2 0.186
38688.24 7.00 531135.43 2970667.66 1093.75 1.259 0.80204 32.5 1.492 0.118 0.14220
50.2 90.2 0.185
38688.24 8.00 531135.00 2970668.56 1093.75 1.257 0.80078 32.5 1.490 0.118 0.14176
50.3 90.2 0.184
38688.24 9.00 531134.56 2970669.45 1093.75 1.255 0.79936 32.5 1.488 0.117 0.14128
50.3 90.2 0.184
38688.24 10.00 531134.13 2970670.35 1093.75 1.252 0.79781 32.5 1.485 0.117 0.14074
50.3 90.2 0.183
38688.24 11.00 531133.69 2970671.25 1093.75 1.250 0.79612 32.5 1.482 0.116 0.14016
50.3 90.3 0.182
38688.24 12.00 531133.25 2970672.15 1093.75 1.247 0.79429 32.5 1.479 0.116 0.13953
50.4 90.3 0.181
38688.24 13.00 531132.82 2970673.05 1093.75 1.244 0.79233 32.5 1.475 0.115 0.13886
50.4 90.3 0.180
38688.24 14.00 531132.38 2970673.95 1093.75 1.241 0.79023 32.5 1.471 0.114 0.13815
50.4 90.3 0.179
38688.24 15.00 531131.94 2970674.85 1093.75 1.238 0.78800 32.5 1.467 0.113 0.13739
50.4 90.4 0.178
38688.24 16.00 531131.51 2970675.75 1093.75 1.235 0.78565 32.5 1.463 0.113 0.13659
50.5 90.4 0.177
38688.24 17.00 531131.07 2970676.65 1093.75 1.231 0.78316 32.5 1.459 0.112 0.13575
50.5 90.4 0.176
38688.24 18.00 531130.63 2970677.55 1093.75 1.227 0.78055 32.5 1.454 0.111 0.13488
50.6 90.4 0.175
38688.24 19.00 531130.20 2970678.45 1093.75 1.223 0.77782 32.5 1.449 0.110 0.13396
50.6 90.4 0.173
38688.24 20.00 531129.76 2970679.35 1093.75 1.219 0.77497 32.5 1.444 0.109 0.13301
50.7 90.5 0.172
38688.24 21.00 531129.32 2970680.25 1093.75 1.214 0.77200 32.4 1.439 0.108 0.13203
50.7 90.5 0.171
38688.24 22.00 531128.89 2970681.15 1093.75 1.210 0.76891 32.4 1.433 0.107 0.13101
50.8 90.5 0.169
38688.24 23.00 531128.45 2970682.05 1093.75 1.205 0.76572 32.4 1.428 0.106 0.12995
50.8 90.5 0.168
38688.24 24.00 531128.02 2970682.95 1093.75 1.200 0.76241 32.4 1.422 0.105 0.12887
50.9 90.5 0.166
38688.24 25.00 531127.58 2970683.85 1093.75 1.195 0.75900 32.4 1.416 0.104 0.12776
50.9 90.6 0.165
38688.24 26.00 531127.14 2970684.75 1093.75 1.190 0.75549 32.4 1.410 0.103 0.12662
51.0 90.6 0.163
38688.24 27.00 531126.71 2970685.65 1093.75 1.185 0.75187 32.4 1.403 0.101 0.12545
51.0 90.6 0.161
38688.24 28.00 531126.27 2970686.55 1093.75 1.179 0.74816 32.4 1.396 0.100 0.12426
51.1 90.6 0.160
38688.24 29.00 531125.83 2970687.45 1093.75 1.173 0.74435 32.4 1.390 0.099 0.12305
51.2 90.6 0.158
38688.24 30.00 531125.40 2970688.35 1093.75 1.168 0.74046 32.4 1.383 0.098 0.12181
51.3 90.6 0.156
38688.24 31.00 531124.96 2970689.25 1093.75 1.162 0.73647 32.4 1.375 0.096 0.12056
51.3 90.7 0.154
38688.24 32.00 531124.52 2970690.15 1093.75 1.156 0.73241 32.4 1.368 0.095 0.11928
51.4 90.7 0.153
38688.24 33.00 531124.09 2970691.05 1093.75 1.149 0.72826 32.4 1.361 0.094 0.11799
51.5 90.7 0.151
38688.24 34.00 531123.65 2970691.95 1093.75 1.143 0.72403 32.3 1.353 0.093 0.11668
51.6 90.7 0.149
38688.24 35.00 531123.21 2970692.85 1093.75 1.137 0.71973 32.3 1.345 0.091 0.11535
51.7 90.7 0.147
38688.24 36.00 531122.78 2970693.75 1093.75 1.130 0.71536 32.3 1.338 0.090 0.11402
51.7 90.7 0.145
38688.24 37.00 531122.34 2970694.65 1093.75 1.124 0.71091 32.3 1.330 0.089 0.11267
51.8 90.8 0.143

Nepal Electricity Authority Training Center Page 5/6


38688.24 38.00 531121.90 2970695.55 1093.75 1.117 0.70641 32.3 1.322 0.087 0.11131
51.9 90.8 0.141
38688.24 39.00 531121.47 2970696.45 1093.75 1.110 0.70184 32.3 1.313 0.086 0.10994
52.0 90.8 0.139
38688.24 40.00 531121.03 2970697.35 1093.75 1.103 0.69722 32.3 1.305 0.084 0.10856
52.1 90.8 0.138