Professional Documents
Culture Documents
EMF calculation includes only wires going from structure 127 to structure 128
Wire station and offset are based on alignment closest to point on wire.
In the case of wires that are not parallel, this may result in different stations
for the wires and centerline.
Set Phase Weather Cable Wind Wire Wire Wire Wire Wire
Eqv. Wire Voltage
# # Case Condition From X Y Z Station Offset
Diameter To Gnd.
(m) (m) (m) (m) (m)
(cm) (kV)
------------------------------------------------------------------------------------------
-----------------
1 1 53 DEG NIL WIND Max Sag RS Left 531136.67 2970665.13 1223.11 38688.24 4.19
1.098 0
2 1 53 DEG NIL WIND Max Sag RS Left 531140.32 2970657.59 1221.28 38688.24 -4.19
1.340 0
11 1 85 DEG NIL WIND Max Sag RS Left 531135.93 2970666.63 1204.22 38688.24 5.87
32.804 127
12 1 85 DEG NIL WIND Max Sag RS Left 531135.61 2970667.29 1197.08 38688.24 6.60
32.804 127
13 1 85 DEG NIL WIND Max Sag RS Left 531134.99 2970668.58 1189.70 38688.24 8.03
Maximum magnetic field of 1.50 (uT) found at station 38688.24, offset -1.00 (m)
Maximum electric field of 0.187 (kV/m) found at station 38688.24, offset -1.00 (m)