Const Estimate Made Easy
WALL FOOTING
T
L = LENGTH
W
FORMULA: VOLUME = L * W * T
CLASS A CONCRETE MIX
Enter Length LT (M) 32.00 M
Enter Width W (M) 0.30 M
Enter Thickness T (M) 0.15 M
TOTAL VOLUME OF CONCRETE: 1.44 CU.M.
# OF CEMENT BAGS 13.00 BAGS
VOL. OF SAND CU.M. 0.80 CU.M.
LT = TOTAL LENGTH/PERIMETER VOL. OF 3/4" GRAVEL CU.M. 1.50 CU.M.
W2
FORMULA: VOLUME = H * W1 * W2
H CLASS A CONCRETE MIX
Enter Height L (M) 1.22 M
VOLUME OF CONCRETE FOR EACH COLUME: 0.08 CU.M.
Number of Columns Units 10.00 Units
TOTAL VOLUME OF CONCRETE: 0.76 CU.M.
# OF CEMENT BAGS 7.00 BAGS
VOL. OF SAND CU.M. 0.40 CU.M.
VOL. OF 3/4" GRAVEL CU.M. 0.80 CU.M.
CONCRETE BEAMS
FORMULA: VOLUME = LT * W * D
CLASS A CONCRETE MIX
LT EnterTotal Length LT (M) 5.00 M
Enter Width W (M) 0.20 M
BEAM DIMENSIONS: Enter Depth D (M) 0.30 M
D TOTAL VOLUME OF CONCRETE: 0.30 CU.M.
# OF CEMENT BAGS 3.00 BAGS
VOL. OF SAND CU.M. 0.20 CU.M.
VOL. OF 3/4" GRAVEL CU.M. 0.30 CU.M.
W
CONCRETE STAIRS
RIPRAPING WORKS L
W1
Enter Height H (M) 2.00 M
Enter Width 1 W1 (M) 0.30 M
Enter Width 2 W2 (M) 0.60 M
Enter Length L (M) 20.00 M
spacing
layer
80 1.6 4 Layers 1.720
FOOTING MATTING
Enter Footing Length L (M) 0.60 M
Enter Footing Width W (M) 0.60 M
Enter # of Bars along L # 4.00 Pcs
Enter Number of Bars along W # 4.00 Pcs
L Enter Number of Footing # 10.00 Units
Enter Clear Cover Cc (M) 0.050 M
Note: Standard Clear Cover for footing =0.05m to 0.075m
# of Bars
per Side Net. Length along L 0.50 M
W Net. Length along W 0.50 M
# OF REIN. BARS USED: 8.00 LHS
#16 TIE WIRE USED: 1.30 Kgs
Clear
Cover
Tie Bars
Spacing
LT = TOTAL LENGTH/PERIMETER
D1
H
Clear Cover
for
D2 columns =
0.40m
1 0.2
Use End Hook: 0.200 M
Total length of each bars should be more than or equal to: 4.20 M
Total Number of Vertical Bars @ 6M: 48.00 LHS
6 Circular Stirrups
Cut Length of each stirrups: 0.90 M
Number of Stirrups per Column: 28.50 M
Total Number of Bars required for stirrups @ 6M : 35.00 LHS
#16 TIE WIRE required: 7.80 Kgs
Spiral Stirrups
Cut Length of each stirrups: 0.70 M
Number of Stirrup Loops per Column: 28.50 M
Total Number of Bars required for stirrups @ 6M : 30.00 LHS
#16 TIE WIRE required: 7.80 Kgs
BEAM REINFORCEMENT (BEAM TO BEAM = LESS THAN 6.0 METERS) ONE BAY
L = Span
L/4
0.15L
Column
Width
TOP BARS
# of 6m Length Deformed Bars required as Continuous Bars 3.00 PCS
# of 6m Length Deformed Bars required as Non-Continuous Bars - PCS
WEB BARS
0.15 L
0.15 L
Column
Width
BAR SPACING IN CM. NUMBER OF STEEL BARS PER SQUARE METER TIES (KGS)
10.000 3.764 0.474
12.500 3.062 0.316
15.000 2.584 0.228
17.500 2.232 0.168
20.000 1.980 0.132
BAR SPACING IN CM. NUMBER OF STEEL BARS PER SQUARE METER TIES (KGS)
10.000 4.369 0.592
12.500 3.603 0.416
15.000 3.221 0.350
17.500 2.647 0.247
CONCRETE STAIRS
Enter Riser Height RH (M) 0.20 M
TR Enter Tread Run TR (M) 0.30 M
W Enter Stair Width W (M) 1.00 M
Enter # of Steps N 10.00 Steps
RH TS (M)
Enter Stringer Thickness 0.15 M
0.30 0.36 0.66
Enter Spacing (M)
0.30
Enter Spacing (M) Enter Steps Lateral Bar diameter (mm)
0.30 12
Enter Stringer Lateral Bar diameter (mm)
16 TS
Enter Spacing (M)
0.30
Enter Spacing (M) Enter Steps Lateral Bar diameter (mm)
NOTES: DOWELS FOR LATERAL BARS ARE ALREADY INCLUDED IN THE ESTIMATES
FOR STAIRS LANDINGS YOU MAY USE THE SLAB REINFORCEMENT CALCULATOR
CONCRETE CANAL
W2
W1
W1
NUMBER OF BOARD FOOT OF STUDS & NAILING JOIST PER SQUARE METER
SPACING IN CENTIMETER (CENTER TO CENTER)
Lumber size in
inches 30 x 30 30 x 60 40 x 40 40 x 60 60 x 60
1x2 4.103 3.147 3.189 2.686 2.268
2x2 8.198 6.293 6.379 5.373 4.594
2x3 12.284 9.440 9.569 8.060 6.898
2x4 16.414 12.592 12.758 10.746 9.195
L
Enter Length of Wall/Ceilling/Flooring L (M) 9.00 M
Enter Height of Wall/Ceilling/Flooring H (M) 3.00 M
Enter Constant Factor C 6.898
# OF BD.FT OF STUDS & NAILING JOIST USED: BD.FT 186.25 BD.FT.
# OF 1" CWNails Used for Boards (ONE SIDE) KGS 0.6 KGS
# OF 1" CWNails Used for Boards (TWO SIDES) KGS 1.1 KGS
# OF 2 1/2" CWNails Used for Joining the Studs together KGS 1.4 KGS
Effec
tive W
i dth
End lapping
Roof Sheet Length 2
Ls
Span
Projection (Bulada)
Pitch
12
Note: Must multiply by two if the other side of the roof is similar
R
o
o
f
W
i
d
t
h
Roof Width
ROOF ACCESSORIES
TILING WORKS
Enter Wall or Floor Area 48.00 SQ.M.
Enter Breakage Allowance (5 - 10%) 5.00 %
6 hrs, allow
2. Exterior For exterior Paint Thinner overnight b4 30 to 40 sq.m.
Wood Primer wood surfaces
recoating
Primer for
3. Red Oxide ferrous and
Paint Thinner 3 Hours 35 to 40 sq.m.
Primer non-ferrous
materials
Rust
4. Red Lead preventive
primer for Paint Thinner 3 Hours 30 to 40 sq.m.
Primer
ferrous
surfaces
For Steel,
6 hrs, allow
5. Epoxy Aluminum,
Primer Galvanized Epoxy Reducer overnight b4 30 to 40 sq.m.
iron recoating
Exterior &
30 minutes
1. Acrylic Latex Interior 1/2 lts/ 4 lts
allow 6 hrs b4 30 to 40 sq.m.
Paint masonry water recoat
surfaces
Exterior &
3. Acrylic Gloss Interior 30 minutes
Water allow 6 hrs b4 30 to 40 sq.m.
Latex masonry recoat
surfaces
For furniture,
cabinets,
doors,
4. Latex Hi- windows, 1 Hour. Allow
Gloss Enamel tools, toys, Usse as is 4 hrs before 30 to 40 sq.m.
recoating
wrought iron,
& primed
metals
ROOF PAINT
KIND OF PAINT USES THINING DRYING TIME COVERAGE/Gal
3 hrs. allow
3. Flat wall for interior overnight
Enamel wall & ceilings Paint Thinner before 40 to 50 sq.m.
recoating
for exterrior
wood and 6 hrs. allow 48
4. Exterior
properly Paint Thinner hrs. before 30 to 35 sq.m.
Gloss paint
primed metal recoating
surfaces
VARNISHING
KIND OF PAINT USES THINING DRYING TIME COVERAGE/Gal
for floors,
1. Valspar or sidings
Paint Thinner 24 hours 40 to 50 sq.m.
Spar Varnish furnitures,
deck of boats
for interior
new wood 10 minutes.
2. Hi-solid furnitures and Lacquer Allow 30 40 to 50 sq.m.
sanding sealer fixtures, Thinner minutes
cabinet, doors, before recoat
etc.
for interior
4. Hi-solid new wood Allow 30
Semi-gloss furnitures, Lacquer minutes 30 to 40 sq.m.
cabinets, Thinner
Lacquer before recoat
doors, shelves,
etc
for interior
wood
5. Hi-solid furniture, Lacquer Allow 30
dead flat cabinets, door Thinner minutes 30 to 40 sq.m.
Lacquer before recoat
jambs, trim
panelling, etc.
for furnitures,
cabinets, Allow 30
6. Water white doors, Lacquer
panel minutes 30 to 40 sq.m.
gloss Lacquer and interior Thinner
before recoat
walls
DETERMINING THE TOTAL MATERIALS USED FOR BEAMS & GIRDER FORMS
B
BY: ENGR. RONALD JOHN R. CAJILLA
SCAFFOLDINGS
PARTS OF SCAFFOLDINGS
1. Vertical Support
2. Base of Vertical Support
3. Horizontal Member
4. Diagonal Braces
5. Block and Wedges
6. Nails & Bolts
BY: ENGR. RONALD JOHN R. CAJILLA
COLUMN BEAM
Enter Column Height M 3.00 Enter Beam Length M 3.50
Enter # of Columns Units 10.00 Enter # of Beams Units 6.00
Total Column Height: 30.00 M. Ht. Total Beam Length: 21.00 M. Ht.
FLOORING
Enter Floor Area SQ.M. 80.00