WORK EXPERIENCE

Crane supervisor
Sparrows offshore services Pvt Ltd India - Mumbai, Maharashtra
October 2018 to Present
1. complete and smooth execution of crane revamping projects with ease. 
2. Planning and election of project on shore and offshore. 
3. technical discussion regarding project with project engineer and client. 
4. carry out inspection of the crane parts and hydraulic equipments. 
5. complete refurbishment of hydraulic equipments to be carried out as per the job scope. 
6. providing client coast effective solution to the client ensuring the best possible quality product delivered to customer.

crane supervisor
Sparrows Group - Abu Dhabi
December 2012 to October 2018
Responsibilities 
Main responsibility is to carry out maintenance duties onshore /offshore as directed by the workshop foreman / cranes
supervisor. 
Responsible for effectively carry out task detailed on sparrows job cards as per  
sparrows workshop procedure which include but not limited to ,strip, inspection , report and  
test all components associated with offshore pedestal cranes ,winches , hook blocks, 
booms , A frames , chassis , diesel engines , gearbox ,hydraulic pumps, hydraulic motors, 
hydraulic valves , safe load indicators , life boat davits, loose lofting gears , gantry cranes and  
control systems with the objective of maintaining safe operations, compliance to international  
standards, maintaining integrity and reliability . 
Responsible for carrying out specialty repairs and project work such as , but not limited to , 
installation of new cranes , removal of cranes from the offshore environment , slew bearing  
change outs, fabrication of new structural components , troubleshooting and repair of electronic  
SLI system and complex hydraulic systems. 
Liaise daily with workshop foreman/ Crane Supervisor to advice him of status of ongoing work , 
highlighting any possible problems/concerns. 
Prepare daily reports detailing the work carried out , preparation of spares parts list ,details of  
parts to be repaired and complication of delivery notes. 
Submit reports on all activities, surveys, inspections certification, maintenance etc. at a  
frequently to be set by the company. 
Repairs and replacement of hoist and structural components including complete machine  
overhaul and refurbishment . 
Load testing , inspection and certification of company’s cranes and other lifting equipment . 
Maintaining a color coding system for all lifting equipments and containers and testing and  
marking of escape ropes and accessories as per company guidelines . 
Establish and maintain effective communication with facility representatives to ensure an  
efficient services is provided on an ongoing basis. 
The Incumbent is responsible for giving a detailed report of any mechanic handling &  
lifting incidents to the workshop foreman/ crane supervisor, within 24 hours of the event. 
Participate in risk assessment process to ensure that all lifting activities are thoroughly reviewed  
and risk controlled prior to implementation. 
When working overhead cranes, carry out daily routine checks on the cranes in accordance with  
the maintenance procedure and pre start checklist. 
Inspection the job site t ensures compliance with safe practices and procedures. Maintain  
quality of safety in the crane group and participate in facility safety reviews. 
The incumbent must adopt a co operative attitude towards begin assigned alternative or  
additional duties to that they are primarily employed which may include working  
additional hours (overtime).  
 
Skills Used 
auto cad  
hydraulic  
innovative

Maintenance Engineer
Mosaic India PVTL - Jamnagar, Gujarat
September 2012 to October 2014
• A efficient team player with excellent problem solving and trouble shooting skills 
• Keen ability to motivate team members to enhance strategic skills and increase total efficiency. 
• Fast track performance through increasingly responsible positions directing maintenance and project planning. 
• Effective management who enjoys the challenge of achieving goals and accomplishing objectives. 
• Planned, directed, and coordinated activities of designated projects. 
• Ensured that aims, goals and objectives were accomplished in accordance with outlined priorities, time limitations, and
funding conditions. 
• Skilled to streamline procedures and analyze results of operations for substantial gains and more optimum utilization of
resources. 
• Looking for technically feasible solutions to get the work out with less time and more safety till the project ends. 
• Basic monitoring day-to-day maintenance activity in process plant & maintaining daily log book for the same. 
• Maintenance of heavy 25 ton off shore crane with hydraulic circuit and pneumatic circuit. 
• Maintenance of MACGREGOR and LIEBHERR cranes respectively . 
• Receive breakdown slip form concern department & appoint the technician to attend the problem. 
• Maintenance & trouble shooting of hydraulic power pack of intermix k4/2A. 
• Maintenance & trouble shooting of vane &plunger pump hydraulic press power pack. 
• Maintenance & trouble shooting of rotary screw type & piston type air compressor. 
• Maintenance & trouble shooting of D.G set 380 KVA,D.G set 280 KVA. 
• Maintenance & trouble shooting of centrifugal pumps. 
• Maintenance & trouble shooting of basic electrical related problems. 
• Preparing machine history register. 
• Planning for preventive maintenance and schedule. 
• Maintaining minimum inventory stock. 
• Preparing energy conservation data/ breakdown analysis/ Monitoring spare cost incurred during maintenance month
wise. 
• Maintaining heavy hydraulic equipment like Excavators 350,Ex-100,Pay loaders total in 20 Nos. in plant . 
• Alignment of rotating equipment’s, Gear boxes from alicon . 
• Preventive Maintenance of Lathe, Mailing & Boring center. 
• Preventive Maintenance of speeded Next controller Mechanical Bagging Plant operating on pneumatic 
• Experience in docking & undocking off barges and offshore cranes . 
• Increase production capacity, improved quality of Product Company. Oversaw erection & commissioning of Bagging Plant-
Speedec NXT 7 and check weight thereby meeting world standard within +/-50 Grams tolerance.  
• Continuous Develop Maintenance related activities for Conveyor, Compressor like Atlas Copco, Ingersoll Rand.

Maintenance Technician
Aisa motor works LTD - Bhuj, Gujarat
September 2009 to September 2012
Asia Motor Works Ltd, is a Group Company of the ESSAR Group. The Company has entered into heavy commercial
vehicle HCV sector with its esteemed product range & got "VEHICLE OF YHE YEAR- NDTV AWARD 2008" and
"INNOVATION AWARD OF THE YEAR 2010". The main products in the Trucks range are--- Tippers, Trailers, haulage,
Concrete pump, Transit Mixture etc. 
2. Auto Component Division: - In auto components division has the biggest wheel rim plant of India, well settled heavy
press lines, forgings (spindles for axles) . The main customers for the auto component division are Maruti Udyog Ltd,
General Motors Ltd, Sonalika Group, Tata Motors etc. 
Key Result Areas: 
Manufacturing HCVs: 
❖ Achieve Production volume with budgeted product Mix ensuring 100% Adherence. 
❖ Deciding Production & Model mix strategies with Production Planning and Control for monthly productions. 
❖ Achieving Quarterly Productivity Targets for Direct Manpower. 
 
Quality Parameters 
❖ Undertaking effective and fastest implementation of Quality Improvement Projects reducing the defect rate. 
❖ Delivering first time right product through QC approach of problem solving. 
❖ Addressing customer complaints and improving the product quality by Six Sigma approach 
❖ Providing action plans against Process audit, Product Audit & Material rejections due to Production Process through
POKAYOKE approach. 
❖ Coordinator for TS 16949 for robust quality delivery of product from line. 
 
Cost reduction: 
❖ Control the finished goods inventory. 
❖ Minimizing the Non-moving and slow moving inventory generation due to ECN implementation through cost recovery
drive. 
❖ Reduction in Assembly Line rejection through process improvement projects. 
 
Engineering Change implementation: 
❖ Undertaking effective and fastest implementation of Engineering Change notes released by R&D. 
❖ Creating new design and implementing it. 
 
Attainments: 
❖ Successfully brought production & dispatch schedule adherence up to average 90% at plant level from 50%. 
❖ Minimizing MUDA by implementing concept of lean Manufacturing. 
❖ Surpassing the cost saving target by 50% and achieved a saving of Rs. 1.03 crore certified by finance in fiscal year
2010-2011. 
❖ Reduction in DPTT (Defects per thousand trucks) by 86% for assembly line in year 2010-2011. 
❖ Certified internal auditor for IMS (Integrated Management Systems) (ISO-14001 & OHSAS-18001) and implementing the
same for achieving the certification from TUV- nord. 
❖ Modified production scheduling with PPC to reduce the model mix complexity on assembly line and reduce delivery time
of production. 
Letter of Appreciation awarded for involvement and work done in CRE idea generation drive.

EDUCATION

Diploma in Mechanical
Dr.S & S S GHANDHIY College of Engineering
2009

Jeevanbharti Kumarbhavan High school secured


2004

SKILLS / IT SKILLS

MICROSOFT OFFICE, AUTO CAD , PRO-E (10+ years), hydraulic troubleshooting , hydraulic calculations

ADDITIONAL INFORMATION

Highlights of Qualifications: 
• Language Skill: Hindi, Gujarati, English 
• Proficient in Microsoft Word, Excel, Power point and Outlook. 
• Strong Analytical, Organizational, Problem solving Skill and Team facilitator. 
• Excellent interpersonal and Problem Solving skill. 
 
Aspiring to pursue career enhancement opportunities in Production / Operations & Maintenance / Erection &
Commissioning with a growth oriented organization.

You might also like