Perhitungan Lampu Hall

Dik = E=200 lux


L=20m
W=10m
∅ = 40 watt x 75 lumen=3000 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=1
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×20 ×10


= 3000× 0,7 ×0,5 ×1

40000
= 1050 = 38,09 → 38 titik lampu
Perhitungan Lampu Lantai Basement
1. Ruang Engineer
Dik = E=200 lux
L=8m
W=5,85m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×8 ×5,85
= 2700× 0,7 ×0,6 × 2

9360
= 2268 = 4,12 → 4 titik lampu

2. Ruang Engine (Genset) & Ruang Kontrol


Dik = E=200 lux
L=8m
W=7m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n
200 ×8 ×7
= 2700× 0,7 ×0,6 × 2

11200
= 2268 = 4,93 → 5 titik lampu

3. Gudang
Dik = E=200 lux
L=34m
W=10m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×34 ×10


= 2700× 0,7 ×0,6 × 2

68000
= 2268 = 29,9 → 30 titik lampu

4. Basement Area Depan


Dik = E=200 lux
L=30m
W=16m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×30 ×16


= 2700× 0,7 ×0,6 × 2

96000
= 2268 = 42,32 → 42 titik lampu

5. Basement Area Belakang


Dik = E=200 lux
L=34m
W=12m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×34 × 12
= 2700× 0,7 ×0,6 × 2

81600
= 2268 = 35,97 → 36 titik lampu

6. Ruang W/C
Dik = E=200 lux
L=2m
W=1,5m
∅ = 18 watt x 75 lumen=1350 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=1

Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×2 ×1,5
= 1350× 0,7 ×0,6 × 1

600
= 567 = 1,05 → 1 titik lampu
Perhitungan Lampu Lantai 1
1. R. Tamu, R. Admin, R. Rapat, R. Makan
Dik = E=200 lux
L=15m
W=10m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×15 ×10


= 2700× 0,7 ×0,6 × 2

30000
= 2268 = 13,22 → 13 titik lampu

2. R. Staff
Dik = E=200 lux
L=14m
W=12m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×14 ×12


= 2700× 0,7 ×0,6 × 2

33600
= 2268 = 14,81 → 15 titik lampu

3. R. Musholla
Dik = E=200 lux
L=14m
W=8m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200× 14 ×8
= 2700× 0,7 ×0,6 × 2

22400
= 2268 = 9,87 → 10 titik lampu

4. R. Lobby
Dik = E=200 lux
L=20m
W=7m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×20 ×7
= 2700× 0,7 ×0,6 × 2

28000
= 2268 = 12,34 → 12 titik lampu

5. Ruang W/C
Dik = E=200 lux
L=5m
W=3m
∅ = 18 watt x 75 lumen=1350 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=1
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×5 ×3
= 1350× 0,7 ×0,6 × 1

3000
= 567 = 5,29 → 5 titik lampu

6. Hall Lantai 1
Dik = E=200 lux
L=15,4m
W=15m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×15,4 ×15


= 2700× 0,7 ×0,6 × 2

46200
= 2268 = 20,37 → 20 titik lampu

7. Lorong 1
Dik = E=200 lux
L=23m
W=3m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×23 ×3
= 2700× 0,7 ×0,6 × 2

13800
= 2268 = 6,08 → 6 titik lampu

8. Lorong 2
Dik = E=200 lux
L=14m
W=3m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200× 14 ×3
= 2700× 0,7 ×0,6 × 2

8400
= 2268 = 3,70 → 4 titik lampu

9. Lorong 3
Dik = E=200 lux
L=3m
W=3m
∅ = 36 watt x 75 lumen=2700 lumen

Cu=55 – 65%
LLF=0,7 – 0,8
n=2
Maka
E× L× W
N= ∅ × LLF ×cu × n

200 ×3 ×3
= 2700× 0,7 ×0,6 × 2

1800
= 2268 = 0,79 → 1 titik lampu
PERHITUNGAN AC LANTAI 1
1. R. Tamu, R. Admin, R. Rapat, R. Makan
( P × l ) ×600
BTU =
9000
( 15× 10 ) × 600
=
9000
= 10 PK
Dengan toleransi 20% maka = 10 × 20% = 2
Jadi 10 – 2 = 8 PK
8 PK
Jumlah AC yang terpasang = 2 PK = 4 buah AC
2. R. Staff
( P × l ) ×600
BTU =
9000
( 14 ×12 ) ×600
=
9000
= 11,2 PK
Dengan toleransi 20% maka = 11,2 × 20% = 2,24
Jadi 11,2 – 2,24 = 8,96 PK
8 , 96 PK
Jumlah AC yang terpasang = 2 PK = 4,48 → 5 buah AC
3. R. Musholla
( P × l ) ×600
BTU =
9000
( 14 ×8 ) ×600
=
9000
= 7,46 PK
Dengan toleransi 20% maka = 7,46 × 20% = 1,492
Jadi 7,46 – 1,492 = 5,96 PK
5,96 PK
Jumlah AC yang terpasang = 2 PK = 2,98 → 3 buah AC
4. R. Loby
( P × l ) ×600
BTU =
9000
( 20× 7 ) ×600
=
9000
= 9,33 PK
Dengan toleransi 20% maka = 9,33 × 20% = 1,86
Jadi 9,33 – 1,86 = 7,47 PK
7,47 PK
Jumlah AC yang terpasang = 2 PK = 3,73 → 4 buah AC