You are on page 1of 15

Engineering, Procurement and Construction

Lusail Plaza Towers

MEP VALUE ENGINEERING REPORT


Rev. 00 / DD-MM-YYYY

Project: Lusail Plaza Towers

Project Number: XXXXXX

Employer: LUSAIL REAL ESTATE DEVELOPMENT COMPANY WLL

Contractor: HBK-REC JV
HBK CONTRACTING COMPANY WLL
REC INTERNATIONAL CONSTRUCTION INVESTMENT INDUSTRY AND TRADE CO. INC.

Prepared for:
HBK-REC JV
Po Box 1362
Doha, Qatar
Tel: +9744445 1111
Fax: +9744445 1000
www.hbkcontracting.com

Prepared by:

Meinhardt (Singapore) Pte Qatar Branch


P. O. Box 24431
th
14 Floor, Amwal Tower
Westbay, Doha, State of Qatar
Tel: +974 44117840
Fax: +974 44117845
www.meinhardtgroup.com

MEP VALUE ENGINEERING REPORT


Page 2 of 15
MEP VALUE ENGINEERING REPORT
Page 3 of 15
APPROVAL SHEET

Document Owner: MEINHARDT (SINGAPORE) PTE LTD

Signature: Date:

REVISION HISTORY

Revision Date Additions/Modifications


00 29 September 2019

We have reviewed this document and completed the Document Review Checklist accordingly.
Title Signature Date

Senior Mechanical
Samir Rabie
Prepared by Engineer

xxxxx
Reviewed by xxxx

MEP VALUE ENGINEERING REPORT


Page 4 of 15
Table of Contents
1 Executive Summary...................................................................................................................................................... 5

1.1 Introduction..........................................................................................................................................................................5

1.2 Architecture Requirements...............................................................................................................................................5

1.3 Concrete Substructure and Superstructure VE Summary...........................................................................................6

1.4 Structure and Steelwork VE Summary...........................................................................................................................6

1.5 MEP Systems......................................................................................................................................................................6

1.6 Landscape...........................................................................................................................................................................6

1.7 Infrastructures.....................................................................................................................................................................6

1.8 Sustainability (not used)....................................................................................................................................................6

1.9 Facade.................................................................................................................................................................................6

2 Introduction (not used)................................................................................................................................................. 6

3 VE of Architecture......................................................................................................................................................... 6

3.1 VE for Architecture and Code...........................................................................................................................................6

4 VE of Structural Engineering and Code Compliance............................................................................................... 7

4.1 Concrete Sub Structure.....................................................................................................................................................7

4.2 Concrete Superstructure...................................................................................................................................................7

4.3 Concrete Substructure and Superstructure VE Summary...........................................................................................7

5 VE of Plumbing and Code Compliance...................................................................................................................... 7

5.1 Purpose of the Report and Basis of Validation..............................................................................................................8

5.2 Potable Cold Water System..............................................................................................................................................8

5.3 TSE Water Supply System for External Irrigation.........................................................................................................8

5.4 Hot water System...............................................................................................................................................................8

5.5 Chilled Cold Water System...............................................................................................................................................8

5.6 Water Storage System.......................................................................................................................................................8

5.7 Domestic Water..................................................................................................................................................................8

5.8 Grey Water System............................................................................................................................................................8

5.9 Condensate Recycling.......................................................................................................................................................8

5.10 Rain Water Drainage System...........................................................................................................................................8

5.11 Roof Cleaning System.......................................................................................................................................................9

5.12 Leak Detection System – Water and Energy Savings..................................................................................................9

MEP VALUE ENGINEERING REPORT


Page 5 of 15
5.13 XXXXX.................................................................................................................................................................................9

5.14 XXXXXX...............................................................................................................................................................................9

5.15 Metering and Sub-metering system - Water and Energy Savings.............................................................................9

5.16 Sanitary Area Shut Off Valve System – Water and Energy Savings.........................................................................9

5.17 Internal Pipework – Selection of Alternate Material......................................................................................................9

5.18 Building Management System (BMS) - Water and Energy Savings..........................................................................9

5.19 GSAS Compliance Requirements...................................................................................................................................9

5.20 Approved Vendors’ List.....................................................................................................................................................9

6 VE of Fire Protection and Code Compliance............................................................................................................. 9

7 VE of HVAC Engineering and Code Compliance...................................................................................................... 9

8 VE of Mechanical/Equipment Engineering and Code Compliance........................................................................9

9 VE of Landscape and External Works and Code Compliance................................................................................9

10 VE of Civil Infrastructure, Roads and Utilities and Code Compliance..............................................................9

11 VE of GSAS/ GORD Sustainability Compliance and Code Compliance (not used).........................................9

12 XXXXXX.................................................................................................................................................................... 10

13 XXXX......................................................................................................................................................................... 10

14 VE of Security Strategy and Code Compliance.................................................................................................. 10

15 VE of Electrical Engineering including ICT Analysis and Code Compliance.................................................10

16 VE of Facade Engineering..................................................................................................................................... 10

16.1 Introduction........................................................................................................................................................................10

16.2 Façade Systems...............................................................................................................................................................10

17 Xxxxxxx.................................................................................................................................................................... 10

18 Xxxxxx...................................................................................................................................................................... 10

19 Xxxxxxx.................................................................................................................................................................... 10

20 Xxxxxx...................................................................................................................................................................... 10

21 VE of Miscellaneous Opportunities, including minor commodity items.........................................................10

22 Appendices.............................................................................................................................................................. 10

MEP VALUE ENGINEERING REPORT


Page 6 of 15
1 Executive Summary
Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint
occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

a) Duis aute irure dolor:


 Ut enim ad minim veniam
 Ut enim ad minim veniam

b) Duis aute irure dolor:


 Ut enim ad minim veniam
 Ut enim ad minim veniam

MasterPlan Options 1, 2 & 3 Figure 1: (Titlexxxxxx)


Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint
occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
1.1 Introduction
Sample Figure/Image/Picture Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi:

Xxxxxxxx Xxxxxx

Lorem Ipsum Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi
Bibendum arcu vitae elementum curabitur
Bibendum arcu vitae elementum curabitur

Lorem Ipsum Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi
Bibendum arcu vitae elementum curabitur
Bibendum arcu vitae elementum curabitur NFPA 10: Standard for Portable Fire
Extinguishers, 2018 Edition

1.2 Architecture Requirements


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat

Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint
occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

MEP VALUE ENGINEERING REPORT


Page 7 of 15
XXXXXXXXXXXX XXXXXXXXXXXX 1.8 Sustainability (not used)

Xxxxxxx Xxxxxxx Xxxxxxx Xxxxxxx Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
Xxxxxxxxxxxxx consequat.

Xxxxxxxxxxxxxxxx 1.9 Facade

Xxxxxxxxxxxxx Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.
Xxxxxxxxxxxxxxxx

Xxxxxxxxxxxxx 2 Introduction (not used)


Xxxxxxxxxxxxx
3 VE of Architecture
Xxxxxxxxxxxxx
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
Xxxxxxxxxxxxx
consequat.
Xxxxxxxxxxxxx
Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur:

a) Duis aute irure dolor:


1.3 Concrete Substructure and Superstructure VE Summary  Ut enim ad minim veniam
 Ut enim ad minim veniam
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat. 3.1 VE for Architecture and Code

1.4 Structure and Steelwork VE Summary Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et
dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore ea commodo consequat.
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.
XXXXXXXXX XXXXXXX
1.5 MEP Systems
Xxxxxxxxxxxxx X
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore Xxxxxxxxxxxxxxxx x
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat Xxxxxxxxxxxxxxxx x

1.6 Landscape Xxxxxxxxxxxxxxxx x

Xxxxxxxxxxx x
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo Xxxxxxxxxxxxxxxx x
consequat.
Xxxxxxxxxxxxxxxx x
1.7 Infrastructures Xxxxxxxxxxxxxxxx x
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore Xxxxxxxxxxxxxxxx x
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat. Xxxxxxxxxxxxxxxx x

Xxxxxxxxxxxxxxxx x

MEP VALUE ENGINEERING REPORT


Page 8 of 15
XXXXXXXXX XXXXXXX 5 VE of Plumbing and Code Compliance
Xxxxxxxxxxxxxxxx x Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint
occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Xxxxxxxxxxxxxxxx x

Xxxxxxxxxxxxxxxx x  bibendum arcu vitae elementum curabitur


 bibendum arcu vitae elementum curabitur
Xxxxxxxxxxxxxxxx x
 bibendum arcu vitae elementum curabitur
Xxxxxxxxxxxxxxxx x
Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur:
Xxxxxxxxxxxxxxxx x
 bibendum arcu vitae elementum curabitur
Xxxxxxxxxxxxxxxx x
 bibendum arcu vitae elementum curabitur

4 VE of Structural Engineering and Code Compliance MasterPlan Options 1, 2 & 3

Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur:
Sample Figure/Image/Picture
a) Duis aute irure dolor:
 Ut enim ad minim veniam
 Ut enim ad minim veniam

b) Duis aute irure dolor:


 Ut enim ad minim veniam
 Ut enim ad minim veniam

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

4.1 Concrete Sub Structure


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

4.2 Concrete Superstructure


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

4.3 Concrete Substructure and Superstructure VE Summary


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

MEP VALUE ENGINEERING REPORT


Page 9 of 15
5.2 Potable Cold Water System
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

5.3 TSE Water Supply System for External Irrigation


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.
Figure 1: (Title)

5.4 Hot water System


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
Sample Figure/Image/Picture magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

5.5 Chilled Cold Water System


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

5.6 Water Storage System


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

5.7 Domestic Water


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

Figure 2: (Title)
5.8 Grey Water System
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
5.1 Purpose of the Report and Basis of Validation magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

MEP VALUE ENGINEERING REPORT


Page 10 of 15
5.9 Condensate Recycling
5.18 Building Management System (BMS) - Water and Energy Savings
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
consequat. magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

5.10 Rain Water Drainage System 5.19 GSAS Compliance Requirements

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat. consequat.

5.20 Approved Vendors’ List


5.11 Roof Cleaning System
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
consequat.

5.12 Leak Detection System – Water and Energy Savings


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

5.13 XXXXX
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

5.14 XXXXXX
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

5.15 Metering and Sub-metering system - Water and Energy Savings


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

5.16 Sanitary Area Shut Off Valve System – Water and Energy Savings
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

5.17 Internal Pipework – Selection of Alternate Material


Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

MEP VALUE ENGINEERING REPORT


Page 11 of 15
Description: Duct risers’ sizes shall be increased/decreased gradually keeping
the calculated CFM.

Proposal: Duct risers’ sizes shall be increased/decreased gradually keeping the


calculated CFM.

6 VE of HVAC Engineering and Code Compliance  Drawing No.: LUS-BP12-F&P-DWG-ME-XX000XX-050


 Drawing No.: LUS-BP12-F&P-DWG-ME-XX000XX-020 Description: FCU auxiliary drain pan provided with leak detection.
Description: Drip trays shall be provided for all AHU coils to include Proposal: Delete the leak detector.
condensate pipework connection and condensate trap sized for the
static pressure of the unit. Drip tray to be provided with leak
detection, incorporating audible alarm at head end.
 Drawing No.: LUS-BP12-F&P-DWG-ME-XX000XX-050
Proposal: Delete drip trays / Delete only leak detection system.
Description: AHU is provided with copper condensate trap.

Proposal: Use alternative approved pipe material.


 Drawing No.: LUS-BP12-F&P-DWG-ME-XX000XX-020

Description: All AHUs to be double skin insulated.


 Drawing No.: LUS-BP12-F&P-DWG-ME-XX569XX-001
Proposal: All AHUs inside indoor plant rooms to be single skin.
Description: (Detail A) - Typical riser branch connection has 2 drain valves
(S&R).

 Drawing No.: LUS-BP12-F&P-DWG-ME-XX000XX-023 Proposal: Only one drain valve may be installed on supply line.

Description: Each fan coil unit to be provided with integrated peristaltic


condensate lift pump.
 Drawing No.: LUS-BP12-F&P-DWG-PB-XX949XX-001
Proposal: Peristaltic condensate lift pump shall be provided where necessary
Description: (Detail 11) – Stainless steel drip tray.
based on the total length of the condensate drain pipe.
Proposal: Provide GI sheet drip tray.

 Drawing No.: LUS-BP12-F&P-DWG-ME-XX000XX-023

Description: Fans in fan coil units shall use Enterprise Content Management
(ECM) DC motors 7 VE of Water Supply Engineering and Code Compliance
Proposal: Use IEC motors with variable frequency drives.
 Drawing No.: LUS-BP12-F&P-DWG-PB-XX000XX-020

Description: Plate heat exchanger (PHX) for potable water system is


 Drawing No.: All Ductwork Schematic Diagrams. specified complete with ultra violet lamps.

MEP VALUE ENGINEERING REPORT


Page 12 of 15
Proposal: Ultra violet lamps are not required. Proposal: Fire tanks shall be of HDG material.

8 VE of Drainage Engineering and Code Compliance  Drawing No.: LUS-BP12-F&P-DWG-FF-XX000XX-020

Description: Fire tanks capacity 200 m3 each


 Drawing No.: LUS-BP12-F&P-DWG-PB-XX949XX-001
Proposal: Fire tanks capacity 50 m3 each (Max 60 minutes operation as per
Description: (Detail 1) – Discharge pipe material is GI/PP high pressure.
QCDD regulations).
Proposal: Discharge pipe material is to be high pressure PVC.
 Drawing No.: LUS-BP12-F&P-DWG-FF-XX959XX-001

Description: One nominated vendor for each valve/fitting.


 Drawing No.: LUS-BP12-F&P-DWG-PB-XX949XX-001
Proposal: Provide at least 3 vendors for each valve/fitting.
Description: (Detail 1) – Discharge pipe equipped with 2 non return valves,
isolating valve and ball valve.

Proposal: Discharge pipe is to have only one isolating valve and one non  Drawing No.: LUS-BP12-F&P-DWG-FF-XX959XX-001 (Detail 2)
return valve installed in valve chamber.
Description: Pipe size does not conform to NFPA 13 pipe schedules.

Proposal: Resize all sprinkler system piping according NFPA 13 pipe


 Drawing No.: LUS-BP12-F&P-DWG-PB-XX949XX-001 schedules.

Description: (Detail 2&5) – Drainage piping material is cast iron.


 Drawing No.: LUS-BP12-F&P-DWG-FF-XX959XX-001 (Detail 3)
Proposal: Drainage piping material is to be uPVC.
Description: Inspector’s test connection utilizing multi valves.

Proposal: Use test and drain valve incorporating sight glass.


 Drawing No.: LUS-BP12-F&P-DWG-PB-XX949XX-002

Description: (Detail 8) – Tank vent and overflow pipe material is Stainless


Steel.

Proposal: Use high pressure PVC pipe.

9 VE of Fire Protection and Code Compliance

 Drawing No.: LUS-BP12-F&P-DWG-FF-XX000XX-020

Description: Fire tanks are concrete construction.

MEP VALUE ENGINEERING REPORT


Page 13 of 15
17 VE of Electrical Engineering including ICT Analysis and Code
Compliance
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

18 VE of Facade Engineering
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
10 VE of Mechanical/Equipment Engineering and Code Compliance magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo 18.1 Introduction
consequat.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
11 VE of Landscape and External Works and Code Compliance consequat.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore 18.2 Façade Systems
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
12 VE of Civil Infrastructure, Roads and Utilities and Code consequat.

Compliance
19 Xxxxxxx
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo 20 Xxxxxx
consequat.

13 VE of GSAS/ GORD Sustainability Compliance and Code 21 Xxxxxxx


Compliance (not used) 22 Xxxxxx
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo 23 VE of Miscellaneous Opportunities, including minor commodity
consequat.
items
14 XXXXXX
15 XXXX 24 Appendices
16 VE of Security Strategy and Code Compliance Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore consequat.
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur:

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat.

MEP VALUE ENGINEERING REPORT


Page 14 of 15
MEP VALUE ENGINEERING REPORT
Page 15 of 15

You might also like