LCG = -0,70
Direncanakan = 7%
= 119,580 ton
d LCG
= -0,65 m
= 119.58/0.8
= 149,474 m³
g V. = V x ρ air laut
= 149.47 x 1.025
= 153,211 ton
Δ = P-γV
= 1827.86 - 153.21
= 1674,65 ton
= 96 m
b Pressure allowed
S = P / (n x b x s max)
where,
P = launching pressure
= 1827,86 ton
= 3 buah
= 96,00 m
b= P / (n x S x s)
= 0,29 m = 0.3 m
= 0,3 m
e Size of GroundWays
Length ( S ) = 96,000 m
beam ( b ) = 0,300 m
height ( h ) = 0,300 m
total ( n ). = 3 buah
f. Doing Slope
l = 30,00 m
a = 3,000
H = sin a x l m
= 1,570 m
g H > T Correction
LCG = -0,654 m
LCB = 2,9350 m
LCF = 1,065 m
Different Draft ( DT ) = - [(LCG-LCB) x Volume] / [1000 x MTC]
where
Volume = P / ρ ; ρ = 1,025
= 1827.86/1.025
= 1783,276
= 0,0377 m
= 0,019
= 0,319 m
S = Length of Groundways
= 96,000 m
m = (Lpp - S) / 2
= 12,000 m
X = (Tf x Lpp)/Ta
= 112,79 m
= 0,1711 m
thus T = Y + height of groundways
= 0,4711 m
Because , H = 1,5701 m
T= 0,4711 m
h. First Period
Hs = 6
Degree =3
Water to station =2
Ta = 0,63
Tf = -5,66
For Ship
Vkp =1/3 x hs x ∑1
=3,077 m3
APBkp = (∑2/∑1) x hs
= 6m
For GroundWays
Volume of GroundWays
Vsl = 0.5 x t x ba x b x n
= 0,77 m3
Buoyancy of GroundWays
APBsl = m + ba/3
= 13,91 m
V = Vkp + Vsl
= 3,85 m3