You are on page 1of 34

Modelling of Combined Cycle

Powerplants
with
®
EBSILON Professional

October 2017
Dr.Hans-Peter Wolf
Stepwise introduction into modelling of gas
turbine process and heat recovery boiler (HRSG)

• Gas turbine process using individual components


• HRSG 1-pressure
• HRSG 2-pressure
• HRSG 3-pressure
• Reheat
• Separation of superheat and reheat
• HRSG and steam turbine in Ts – diagram
• Superheat of IP and LP steam
• HRSG in QT - diagram
• Water injections
• Auxiliary burner
• VTU Gas turbine library for a particular gas turbine
• Alternative heat exchanger components
• EbsWizard
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 2
Exercise, Step 1
Modelling of Gasturbine

Modelling of gasturbine with Ebsilon-components


- compressor (comp. 24)
- Combustion chamber (comp. 22)
- Turbine (comp. 23)
(detailled Modelling using VTU Gasturbine library -> Exercise, Step 10)
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 3
Exercise, Step 2,
Adding a HRSG (1-pressure)

Modelling of HRSG with components


- Heat exchanger (comp. 26) for superheater and economizer
- Evaporator with drum (comp. 70)
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 4
Exercise, Step 2,
Explanations

The recommended procedure for configuration of components :

• Superheater :
- Specification of steam outlet temperature (measurement)
- FTYPHX = „Superheater“
- FSPECD = „both cold stream and one hot stream temperature“

• Evaporator (with drum) :


- FSPECD = „specification of pinchpoint PINPN“
- PINPN = 5K (default value)
- FTAPPN = „by specification value TAPPN“
- TAPPN = 3K (default value)

• Economizer :
- FTYPHX = „Economizer“
- FSPECD = „both cold stream and one hot stream temperature“

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 5


Exercise, Step 2,
Explanations

Alternative Procedure for configuration of components


(if no heater outlet temperatures and Terminal Temperature
Differences are known):

• Superheater :
- FSPECD = „Effectiveness Method“
- EFF = 0.8 (default value)

• Evaporator (with drum) :


- FSPECD = „Effectiveness given as EFF“
- EFF = 0.96 (recommended value)
- FTAPPN = „T1 given externally“
• Economizer :
- FSPECD = „Effectiveness Method“
- EFF = 0.8 (default value)

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 6


Exercise, Step 3,
2-pressure HRSG

- Splitting the turbine into HP and LP turbine


- LP drum supplies steam to LP turbine

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 7


Exercise, Step 4,
3-pressure HRSG

- Splitting the turbine into HP-, IP- and LP-turbine

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 8


Exercise, Step 4,
3-pressure HRSG in Ts-diagram

XX< 0.9

Challenge: steam quality at LP turbine outlet too small


(same with 1- and 2- pressure HRSG at same steam parameters)
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 9
Exercise, Step 5,
Reheat

- Steam leaving HP turbine is heated again


- As a consequence in Ts-diagram the turbine-expansion is
shifted to the right (-> higher steam quality)
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 10
Exercise, Step 5,
3-pressure HRSG with Reheat in Ts-diagram

T < 540 °C

X ~0.9

Challenge: Heat in fluegas after superheater not sufficient to


reach desired reheat temperature
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 11
Exercise, Step 6,
Splitting the superheater and reheater

Splitting the superheater and reheater allows higher reheat steam


temperature (because superheater 2 takes less heat from fluegas)
A splitting of superheaters and reheaters into additional heaters is possible

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 12


Exercise, Step 6,
Splitting of Heaters in Ts-Diagram

T = 540 °C

The desired reheat temperature (540 °C) can be rreached.


When mixing steam into cold reheat and before LP-turbine, there are significant
temperature differences (-> exergy loss)
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 13
Exercise, Step 7,
Superheat of IP and LP steam

By superheating IP and LP steam, exergy losses are reduced


when mixing the steam
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 14
Exercise, Step 7,
Superheat of IP/LP steam in Ts-Diagram

When mixing streams with similar temperature, the exergy losses are reduced

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 15


3-pressure HRSG in QT-Diagram

Significant difference in the „slope“ dT/dQ


between fluegas side and water/steam side
(because of high fluegas mass flow)

But temperature differences


(pinchpoints) are relatively small
(compared to coal fired boilers)

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 16


Comparison to coal-fired boiler:
coal fired boiler in QT-Diagram

In coal fired boilers (at same thermal power)


significantly lower fluegas flow (because fluegas
temperature is much higher)

Higher exergy losses in boiler because


of larger temperature differences in heat
transfer

Pinchpoint
(at „cold end“)

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 17


Comparison:
1-pressure HRSG in QT-diagram

In 1-pressure HRSG pinchpoint is located „in the middle“


-> large difference between feedwater ínlet temperature
and fluegas outlet temperature

The location of the pinchpoint (-> evaporation


pressure) determines the fluegas losses
Pinchpoint
(„in the middle“)

Therefore:
Evaporation at different pressure levels to High fluegas outlet
temperature and
reduce the fluegas outlet losses losss

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 18


Exercise, Step 8,
Water injections into SH and RH

Both controllers control the


injection massflows so, that
the target steam temperature
behind the heaters is
maintained (i.e. not exceeded)

The injections should be very small in the Design case (0.001 kg/s).
The controllers should be active only in Off-Design
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 19
Exercise, Step 9,
Auxiliary burner

In Off-design the controller sets


the fuel flow to the auxiliary
burner so, that the desired
steam temperature is reached

The auxiliary burner should be deactivated in Design case


The controllers should be active only in Off-design
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 20
Exercise, Step 10,
VTU GT-Lib for realistic GT data

Replace individual Ebsilon components of the GT with comp. 106,


Select a proper gas turbine (for example Siemens SGT5-3000E)
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 21
Exercise, Step 10,
VTU GT-Lib for a particular gas turbine

Calculates realistic results using manufacturers data

New Gasturbine Data


Meanwhile (GT-Lib Version 5) more than 600 Turbines
from 13 manufacturers

(Alstom, Ansaldo, Capstone, Centrax, GE, Hitachi, Kawasaki,


MAN, Mitsubishi, OPRA, Rolls-Royce, Siemens, Solar Turbines)

if required by the customer, datasets for additional turbines can


be created

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 22


Exercise, Step 10,
VTU GT-Lib for a particular gas turbine

Consistent
Reference Conditions

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 23


Exercise, Step 10,
VTU GT-Lib for a particular gas turbine

The maximum loadcase for the auxiliary burner is encountered at low


ambient temperatures, because then the fluegas temperature is low

Correction curve for fluegas outlet temperature as function of ambient temperature for
Siemens „SGT5-3000E (41MAC) Oil“
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 24
Exercise, Step 10,
VTU GT-Lib for a particular gas turbine

Also in Off-design there is a drop in fluegas temperature

Correction curve for fluegas outlet temperature as function of ambient temperature for
Siemens „SGT5-3000E (41MAC) Oil“
October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 25
Exercise, Step 11,
Auxiliary burner and Design case

Because the fluegas massflow is increased (when operating the


auxiliary burner), it is recommended to use the case with maximum
firing of the auxiliary burner as the Design case for the HRSG :
• Define the case with maximum firing of auxiliary burner as the
Design case for the complete plant

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 26


Exercise, Step 11,
auxiliary firing in QT-diagram

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 27


Alternative heat-exchanger components
component 20, drum

Comp. 20 : drum, for the separate modelling of evaporator and


drum

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 28


Alternative heat-exchanger components
comp. 61, heat-exchanger with exponents

This heat-exchanger can be uses as alternative to comp.26

The specification values are the same like in comp. 26 with the
following additional options :

When specifying the Alpha-values of fluegas and water/steam side,


the component allows to calculate the heat-transfer area A and the
heat transfer coefficient k

For the Alpha-values of fluegas and water/steam side plausible values


are recommended (-> Online help of comp.61)

The Off-Design performance is calculated like the following

• 1/k = 1/ αi+1/αa
• αi/ αiN = (M1/M1N)**EX12
• αa/αaN = (M3/M3N)**EX34 *(1.-0005*(T34-T34N))

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 29


Alternative heat-exchanger components
comp. 62, Duplex-heatexchanger

Duplex-heatexchanger (as extension of comp.61) as combination


of 2 heat-exchangers

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 30


Alternative heat-exchanger components
comp. 88 and 89, boiler heating surface

Instead of the aforementioned heat-exchanger components also the


so-called „boiler components“ comp.88 („Boiler: fluegas zone“) and
comp.89 („Boiler: bundle heating surface“) can be used.

These components allow to calculate the heat-transfer taking into


acount geometry and material data.
The heat transfer coefficients (Alpha values) are calculated from
geometry and material data according to VDI Wärmeatlas Mb4
(there is an English edition, the „VDI heat atlas“)

Also a heat-transfer by radiation between neighbouring heating


surfaces is taken into account by these components

Remark: only since Ebsilon Rel.11 Patch 4 correct calculation according to VDI
Wärmeatlas. Earlier there were some simplified calculations

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 31


EbsWizard
Assisted creation of complete model

The EbsWizard allows to create a model of a GT + HRSG + water/steam-cycle in


very short time (5 minutes)

(prerequiste: VTU GT-Lib)

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 32


EbsWizard
Assisted creation of complete model

Modifications of internal details of Macros is possible by editing the Macros

October 2017 Modelling of Combined Cycle Power Plant with EBSILONProfessional 33

You might also like