This document outlines the preliminary design parameters for a horizontal directional drilling project including an entry angle of 10 degrees, an exit angle of 4 degrees with respect to horizontal, a radius of curvature of 1000m at entry and exit, a depth of the pipeline axis of 25m from the entry point, a horizontal length of the drilled hole of 1050m, and a horizontal length of pipe string to be pulled of approximately 1200m.
This document outlines the preliminary design parameters for a horizontal directional drilling project including an entry angle of 10 degrees, an exit angle of 4 degrees with respect to horizontal, a radius of curvature of 1000m at entry and exit, a depth of the pipeline axis of 25m from the entry point, a horizontal length of the drilled hole of 1050m, and a horizontal length of pipe string to be pulled of approximately 1200m.
This document outlines the preliminary design parameters for a horizontal directional drilling project including an entry angle of 10 degrees, an exit angle of 4 degrees with respect to horizontal, a radius of curvature of 1000m at entry and exit, a depth of the pipeline axis of 25m from the entry point, a horizontal length of the drilled hole of 1050m, and a horizontal length of pipe string to be pulled of approximately 1200m.
• Preliminary design: o Entry angle: 10° o Exit angle with respect to horizontal: 4° o Radius of curvature at entry and exit: 1000m o Depth of the pipeline axis wrt the entry point: 25m o Horizontal length of the drilled hole: 1050m o Horizontal length of pipe string to be pulled: ~1200m