You are on page 1of 1

STANDARD OPERATING PROCEDURE

MOISTURE BALANCE

Operating Procedure :-

1. Ensure that the equipment is clean.


2. Connect the instrument power cord mains plug to main supply socket having
220 Volt /50 stabilized power supply with proper earthing connection.
3. Placed the previously weighed sample in the aluminum dish.
4. ON the heating bulb and set the appropriate temperature using temperature
knob.
5. After the prescribed time period , again weigh the sample for calculating the
% moisture content.
6. After completion of the required time, switch OFF the instrument.

You might also like