SUMMARY OF FORCES AND MOMENTS FOR PIER P1- TUIVAL BRIDGE (TENDER)
Formation Level= 99.450 m c/c dist betn bearings 2.500 m
Pier Cap Top Level= 95.775 m Horizontal seis. Coeff.= 0.270
Well Cap Top Level= 90.260 m Sign Convention : Anticlockwise Moment +ve

At Top Of Pier Cap At Top Of Well Cap


Sl.No. Description P HL Acting at HT Acting at ML MT P HL Acting at HT Acting at ML MT
T T m T m T-m T-m T T m T m T-m T-m
1 DL + SIDL & FPLL of superstructure
1i) Pracast girder 179.3 0.0 0.0 345.2 29.5 179.3 0.0 0.0 345.2 29.5
1ii) Box girder 601.3 0.0 0.0 -345.7 85.6 601.3 0.0 0.0 -345.7 85.6
1iii) Footpath Live Load 9.9 0.0 0.0 -2.6 41.3 9.9 0.0 0.0 -2.6 41.3
2 Carriageway Live Load
2i) Max long mt case (70R Wheel) 82.3 0.0 -158.4 95.1 82.3 0.0 0.0 -158.4 95.1
2ii) Max Reac. case (70R Wheel) 93.8 0.0 -59.1 108.3 93.8 0.0 0.0 -59.1 108.3
3 Longitudinal force (Normal case)
3i) Max Reac. case (70R Wheel) 0.0 35.6 -6.9 96.175 97.575 0.0 0.0 28.7 0.0 160.1 0.0
3ii) One span dislodged 0.0 30.1 96.175 0.0 0.0 0.0 30.1 0.0 178.0 0.0

3 Longitudinal force (Transverse Seismic case)


3iii) Max Reac. case (70R Wheel) 0.0 32.8 -8.0 96.175 97.575 0.0 0.0 0.0 24.9 0.0 136.0 0.0

4 Due to Braking + Long Seismic (incl. DL+SIDL)


4i) Max long mt case (70R Wheel) 105.4 304.4 9.0 96.175 97.575 0.1 105.4 313.4 0.0 1866.4 0.0
4iii) One span dislodged 81.2 306.7 96.175 46.7 81.2 306.7 0.0 1860.8 0.0
5 Transverse Seismic Force
a) Box girder span
ai) Box girder +Deck Slab 61.5 123.0 98.271 61.5 0.0 123.0 0.0 985.4
aii) Crash Barrier 11.9 23.8 99.781 11.9 0.0 23.8 0.0 226.6
aiii) Wearing Coat 5.1 10.1 99.358 5.1 0.0 10.1 0.0 92.3
aiv) Services 2.8 5.6 99.600 2.8 0.0 5.6 0.0 52.3
b) Precast Girder span
5i) Deck Slab +Precast Girders 16.2 32.4 98.893 16.2 0.0 32.4 0.0 279.7
5ii) Crash Barrier 4.1 8.2 99.781 4.1 0.0 8.2 0.0 78.1
5iii) Wearing Coat 1.7 3.5 99.358 1.7 0.0 3.5 0.0 31.4
5iv) Services 1.0 1.9 99.600 1.0 0.0 1.9 0.0 17.7
On 50% CWLL:
5v) Max Reac. case (70R Wheel) 6.4 12.7 100.650 6.4 0.0 12.7 0.0 132.0
5vi) Footpath Live Load 0.7 1.3 100.840 0.7 0.0 1.3 0.0 14.2
10 Substructure
10i) DL 210.9 0.0 0.0 -121.0 0.0
10ii) Seismic Force: Pier Cap 16.7 33.4 95.531 33.4 95.531 176.1 176.1
10iii) Seismic Force: Pier 9.9 19.8 92.418 19.8 92.418 42.7 42.7
10iv) Seismic Force: Pedestal (a) 0.5 0.9 97.386 0.9 97.386 6.4 6.4
10v) Seismic Force: Pedestal (b) 0.3 0.6 95.975 0.6 95.975 3.3 3.3
10vi) Seismic Force: Seismic reac. Block (b) 0.6 1.2 96.131 1.2 96.131 6.9 6.9
10vii) Seismic Force: Seismic reac. Block (b) 0.6 1.2 97.531 1.2 97.531 8.5 8.5

Load Combination 04/24/2020


Pier Design

Check for Stresses in pier considering only concrete section


Pier dia= 2.5 m
Area = 4.91 m2
Z= 1.53 m3

Resultant
Load Case P Moment P/A M/Z pmax pmin
T T-m T/m2 T/m2 T/m2 T/m2
I 0.00 0.00 0.00 0.00 0.00 0.00
II 0.00 0.00 0.00 0.00 0.00 0.00
III 0.00 0.00 0.00 0.00 0.00 0.00
IV 0.00 0.00 0.00 0.00 0.00 0.00
V #REF! #VALUE! #REF! #VALUE! #REF! #REF!