Professional Documents
Culture Documents
Canny Diagramas General PDF
Canny Diagramas General PDF
KLS-MCU
QK1
D Y12 Y13 Y14 Y15 Y16 Y17 D
Public end Up Down enable Stage speed 1 Stage speed 2 Stage speed 3
L1 X21 JP9.7 JP9.1 JP9.2 JP9.3 JP9.4 JP9.5 JP9.6
KAP L2 X22
L3 X23
300 302 303 304 305 306 307
1L1 3L2 5L3 RB 13
KMC KAD
14 308
2T1 4T2 6T3
R S T 301
R S T BR1 C 96 19 13 14 12 36 37 38 16 18 97
C C
UFC
AVY-KBLM
XE XFO
U V W 5 6 8 1 3 4 10 11 12 13 9 7 5 6 8 1 82 80 83 85 E
U1 V1 W1
1L1 3L2 5L3 310 332 311
TYCH
Note 1
PE KLS-MCU
M
A Note:The converter should be well earthed. A
The shielded cable is independently meant for speed feedback signal, with the shielded layer well earthed.
设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 SIEI Main circuit
Note 1:Power line shall go into a magnetic ring,winding two turns in turn in the same direction and
it will then be taken out in the same direction connecting to one side of a contactor. 校 对 审 定 图 号 D10D610
审 核 日 期 页 号 1/23
1 2 3 4
1 2 3 4
R S T + 3 - S3 SN S1 S2 S4 S5 S6 S7 SP SC H1 H2 HC AC A1
C C
UFC
CIMR-LB4A****FAA
CN5
TB1 PG-X3 TB2
U V W IG IP a+ a- b+ b- MC MA M5 M1 M6 M2 E
FE
A+
A-
B+
B-
Z+
Z-
U1 V1 W1
COM 332 311
TYCH
Note 1
Brake resistunce and braking unit layout
B 1L1 3L2 5L3 B
7.5KW Converter is fitted with 2KW36Ω one resistor
Z- yellow black
B- green black
KMY
15KW Converter is fitted with 2KW54Ω two resistors(parallel)
Z+ yellow
0V black
A+ A- B+ B-
A+ blue
KLS-MCU
D QK1 RB D
Y12 Y13 Y14 Y15 Y16 Y17
Public end Up Down Enable Stage speed 1 Stage speed 2 Stage speed 3
R S T + 3 - 3 SC S1 S2 BB BB1 S5 S6 S7 AC A1
C RB C
UFC
CIMR-L7B
TA1 PG-X2 TA2
U V W 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 MC MA M1 M2 E B1 B2
U1 V1 W1
310 332 311
TYCH
Converter power is less than 18.5kw, canceling BKU
1L1 3L2 5L3 Note1 *
B KMY B
2T1 4T2 6T3
KMY Brake resistunce and braking unit layout
21 22
7.5KW Converter is fitted with 2KW36Ω one resistor
B0 0V +5V A+ A- B+ B- Z+ Z-
11KW Converter is fitted with KW54Ω two resistors(parallel)
31 32 15KW Converter is fitted with 2KW54Ω two resistors(parallel)
KMY 18.5KW conveter is fitted with 2KW72Ω three resistors(parallel)
U V W PG JP11.5 JP11.7
JP11.6 JP11.8 JP4.5 JP2.2 JP2.10 22KW converter is fitted with 2KW90Ω four resistors(parallel)
8192p/r A+ A- B+ B- KLS-MCU Public end Trouble Preperation
30KW converter is fitted with 2KW90Ω four resistors(parallel)
22KW or more converter is fitted with CDNR-4030B braking unit
PE Note 2
QK1 KLS-MCU
D D
Y12 Y13 Y14 Y15 Y16 Y17
Public end Up Down Enable Stage speed 1 Stage speed 2 Stage speed 3 0-10V 0V
JP9.7 JP9.1 JP9.2 JP9.3 JP9.4 JP9.5 JP9.6 JP12.2 JP12.3
L1 X21
KAP L2 X22
L3 X23
300 302 303 304 305 306 307 308 309
1L1 3L2 5L3 RB
13
KMC KAD
2T1 4T2 6T3 14
R S T 323
UFC
iAStar-S3M
AS.T004
U V W E V+ 0V A+ A- B+ B- R+ R- C+ C- D+ D- A1+ A1- B1+ B1- K3A K3B K2B K2A E
U1 V1 W1
310 332 311
TYCH
Note 1
1L1 3L2 5L3
B KMY B
2T1 4T2 6T3
KMY
21 22
+5V
B0
0V
A+
A-
B+
B-
R+
R-
C+
C-
D+
D-
31 32
KMY
U V W
1b 5b 6b 2a 3b 5a 4b 4a 7b 1a 2b 6a JP11.6 JP11.5 JP11.8 JP11.7
JP4.5 JP2.2 JP2.10
Public end Trouble operation
7a 6a 5a 4a 3a 2a 1a PG A+ A- B+ B-
PCB socket
7b 6b 5b 4b 3b 2b 1b ERN1387
PE KLS-MCU
A
M A
设 计 单 位 康力电梯股份有限公司
Note: The converter should be well earthed. 工 艺 标准化 VA01 图 名 iAStar sync main circuit
The shielded cable is independently meant for speed feedback signal and speed given signal.
校 对 审 定 图 号 D10D610
Note 1: Power line should go into the magnetic ring in an identical direction, winding two turns in the same direction. It will then be taken
out connecting to one side of a contactor. 审 核 日 期 页 号 3/23
1 2 3 4
1 2 3 4
TCO FU5(3.15A)
UR2
B101 B111 QF2(6A) Z01 01
~ -
D D
AC110V C1 C2 110VDC
FU3(4A)
BR1 KAS
X21 + Z02 3L2 4T2 02
~
101
102 110VAC
C3 AC380V
KAS
5L3 6T3 104
C C
AC220V 220VAC
FU4(4A)
B202 B222 QF1(6A) 202 GC3.2
UR2
Z01 01
~ -
C1 C2 220VDC Note 1
B B
201 L +5V
COM1
202 N TPB
B24V QF3(4A) +24V
+24V GC2.2
PE
A A
* Wiring is made when the main mach has no mech brake releasing. 设 计 单 位 康力电梯股份有限公司
Note 1:When the band-type brake coil is DC 198 V,use the dotted line internal circuit. 工 艺 标准化 VA01 图 名 Control PS
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 4/23
1 2 3 4
1 2 3 4
LD1
D TXV+ TXV- TXA+ TXA- TB2.31 D
KLD 14 KLD 5
SM-11-A:JP1.5
Note2 13 9
TB2.32
313 LD2
JP6.5 JP7.6 JP7.3 JP13.1 JP13.2 JP13.3 JP13.4 JP7.7 JP7.8 JP8.6 JP8.5
pre-opening fire-control output
Y8 Y11A
C KLS-MCU C
Y2 Y3 Y0 Y1 Y4 Y5 Y6 Y7
strongly excited by
lead-in lead-out band-type brake front opening front closing rear opening rear closing
the band-type brake
JP6.3 JP6.4 JP6.1 JP6.2 JP7.1 JP7.2 JP7.4 JP7.5
KAD
Note 1
5L3
Note2
Note:1 Distribution wire used when strongly excited with the band-type brake.
A A
Note2: Distribution wire used when the opposite doors are installed. 设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 Main control panel output
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 5/23
1 2 3 4
1 2 3 4
Note6
D D
SQU SWFI
GC5.17
SSU1 SSD1 SLUT SLDT SSU SSD SQD
TB4.9
DC2.3
CF
TB2.22
PS
TB4.10
(53) GC2.3
PS
DC2.4
Note1
1L1
GC5.15
GC5.16
GC5.11
GC5.12
SFI
GC8.1
GC8.2
Note7 KAS
GC2.4
TB2.23 CF1 Note4
(54)
2T1
COM 88 90 111 113 84 86 PSS PX
+24V
GC2.1
JP10.4
C JP1.4 JP1.5 JP1.6 JP1.7 JP1.8 JP1.9 JP1.10 JP2.1 JP2.3 JP3.2 C
JP10.3 up forced change 1 down forced change 1 up limit down limit up forced change down forced change up leveling down leveling fire-cnotrol return fire-cnotrol operation
JP4.5
(1L1)
TB2.17
TB2.18
TB2.35
B 13 1L1 3L2 53 13 5L3 3L2 B
KAS KAD KAD KMC KMY KMB KMB
14 2T1 4T2 54 14 6T3 4T2 SBZ
(2T1)
353 STD HB
SBZ1
D D
KLS-MCU
GC2.5 80 JP1.2 Up
C C
SBPU SBPD SBTU SBTD
SSY
60
61
2
SAF
1
B B
SRT
78 COM
GC2.1
GC2.7
A A
设 计 单 位 康力电梯股份有限公司
INSP and EMER
工 艺 标准化 VA01 图 名 electrically operated
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 7/23
1 2 3 4
1 2 3 4
hoistway lighting
N X11
L2 X11 N
SRM QF4
L0 L1
L
XS2
EL3
SHC
JN2
KAE
DC9.1
ELA(NL) 504
1 9 JN1 HFN
SWN
EL1
SHT
JN3 1 2
ELA(NL-1) 1 2
B B
EL2
SHL JN4
ELA2
Note3 Note4
Note2 Note2 Note
Note1
D D
NC NC SSOL SSFU SSLL SWD SWV SBPS SWCD SWSW SWMM SBBC
DC11.1 DC11.2 DC11.3 DC11.4 SQE1 SQE2
SLO SLC SLO1 SLC1 SQE11 SQE12
C C
TXV+ TXV- TXA+ TXA-
TB4.20
CTB5.7
CTB5.6
CTB6.7
CTB6.6
TB4.15
TB4.16
TB4.52
TB4.53
TB4.18
TB4.17
TB4.47
DC10.12
DC10.11
DC10.1
DC10.2
DC10.3
DC10.7
DC10.8
DC10.6
DC10.4
DC10.5
DC9.8
DC9.9
325 326 327 368 369 366 367
CMM M7 M6 M9 M8 38 39 381 391 93 34 36
JP3.1 JP3.2 JP3.3 JP3.4 JP8.05 JP7.06 JP7.05 JP5.08 JP5.07 JP5.05 JP5.04 JP7.04 JP5.06 JP7.03 JP7.02 JP6.04 JP6.03 JP6.02 JP6.01 JP7.01 JP5.03 JP5.02 JP5.01
front door front door rear door rear door front door rear door front door rear door pass word layer opening
C opening in-place closing in-place opening in-place closing in-place light curtain light curtain safety shoes safety shoes
overload full load light load attendant special use by-pass NS-CB NS-SW set sw maintain BUT C
KLS-CCU
up arrival gong down arrival gong lighting fire-control light buzzer Opening BUT light Opening BUT closing BUT light closing BUT
JP16.04 JP16.03 JP16.06 JP16.05 JP16.02 JP16.01 JP15.1 JP15.4 JP15.2 JP15.5 JP10.1 JP10.2 JP10.3 JP10.4 JP11.1 JP11.2 JP11.3 JP11.4
JP1
DC10.10
DSS LH
B CMM HXF B
DC10.1
DC10.9
TB4.19
T24
Note: The light load input signal should be short connected without a light load switch installed on.
38 Note1:Opening and closing in-place contacts should be located in door operator controllers.
Note2: Wiring is made when using the opposite doors.
JP8.04
201 1 NC Note3: Wiring is made when the safety shoes are used.
JP8.03 202 2 Note4: Wiring is made when the NS-CB function button is provided.
A KLS-CCU PE 3 C
设 计 单 位 康力电梯股份有限公司
A
JP8.02
工 艺 标准化 VA01 图 名 Car panel
JP8.01 COM
校 对 审 定 图 号 D10D610
wiring is made when the light curtain is used
* 审 核 日 期 页 号 9/23
1 2 3 4
1 2 3 4
KLS-CCU(JP1)
D D
JP9 KLS-ICU KLS-ICU
JP10 JP9 JP10
C HC10 C
HC1 HC2 HC8 HC9 HC16
VA-10-X (VA-10-M-X)
X1 X2 X3 X4 X5 X6 X7 X8 COM V24 V0
B SPEAKER B
DC12.10
DC12.1
DC12.2
DC12.3
DC12.4
DC12.5
DC12.6
DC12.7
DC12.8
DC12.9
L1 L2 L4 L8 H1 H2 H4 H8 S24V V0
JP9.1 JP9.2 JP9.3 JP9.4 JP9.5 JP9.6 JP9.7 JP9.8 JP9.10 JP9.9
D0 D1 D2 D3 D4 D5 D6 D7 +24V COM
KLS-CCU
A A
设 计 单 位 康力电梯股份有限公司
Command panel/
工 艺 标准化 VA01 图 名 audio reporting station
Note : When the audio reporting station is used ,if it is a building of 20 stories or above ,the VA-10-M-X will be used. 校 对 审 定 图 号 D10D610
审 核 日 期 页 号 10/23
1 2 3 4
1 2 3 4
D D
1
KLS-DCU-VS/P KLS-DCU-VS/P KLS-DCU-VS/P
2
2
SBU(2) SBU(1)
3
3
4
4
LED LED LED
C INSP JP3 INSP JP3 INSP JP3 C
HD(n) HD(2)
1
1
full load full load full load
2
2
SBD(n) SBD(2)
3
3
4
4
JP1 JP4 JP1 JP4 JP1 JP4
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
B SRK B
TXV+
GC4.1
TXV-
GC4.4 GC4.3 GC4.2
TXA+
TXA-
Note: Connections across s1.2 and s1.3 are made to set an address code on the display panels.
The S2.1, S2.2, S3.1 and S3.2 are the serial comm terminal resistance jumpers, at the same time, shorting is made to show connecting to the built-in 120 Ω resistance.
A A
设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 Transversal display call
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 11-1/23
1 2 3 4
1 2 3 4
HU2 HU1
1
2
2
D D
JP3 JP3 SBU2 JP3 SBU1
3
4
4
HD(n) HD2
1
2
2
JP4 SBD(n) JP4 SBD2 JP4
3
4
4
C C
ON ON ON
1 2 1 2
SW1 SW1 SW1 1 2
TXV+ SRK
GC4.1
Home floor lift-lock SW
GC4.2 TXV-
GC4.3 TXA+
GC4.4 TXA-
A A
设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 Transversal display call
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 11/23
1 2 3 4
1 2 3 4
KLS-MCU KLS-MCU
JP14.3 CB+ JP14.3
lift A lift B
JP14.4 CB- JP14.4
1 2 3 4 1 2 3 4
JP2 1 HU(n) 1 JP2
2 2
JP3 JP3
B B
3 SBU(n) 3
4 4
KLS-DCU
KLS-DCU
1 1
HD(n)
2 2
JP4 JP4
3 3
SBD(n)
4 4
A A
设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 Parallel wiring diagram
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 12/23
1 2 3 4
1 2 3 4
102 101
201
Note 1 Note 1 Pit maintenance safety SW Note 1
133 SSRG SSRG1 DWP STL 110 STC 132 STT 134 SSCL
136 1136 SBAD 1140 140
D D
14
TB2.5 GC5.5 GC5.7 TB2.6 GC3.7 DC3.7 DC9.4 DC9.5 TB4.37 TB4.40
broken step broken step
Pit safety SW/INSP SW Pit safety SW car safety SW car top safety SW Mech lock SW
chain device chain device 1
KMB
KMB1
A10
SRT 1L1 2T1
SAF 11 12 152
13
ZQ1
333
GC3.8 DC3.8 TB4.38 TB4.39 R
334
112 114 139 138 137 135
TB2.9 TB2.8 GC6.9 GC6.8 TB2.7 GC5.8 GC5.6 GC3.10 TB4.41
Governor SW Down Counterweight buffer Car buffer Safety gear SW D
YBK1
YBK
Counterweight safety gear SW Counterweight Up ultimate SW
ultimate SW
governor SW
332
KAP STP 120 KAS
11 14 115 A1 A2
1L1
C Phase failure Mach EMER stop C
RC4
KMB
GC3.12
ZQ2
2T1
330
SMC 116 SMH1 SMH2 SMH(n-1) SMHn 118 KAD
44
2MT 3MT nMT
A1 A2
TB4.36 GC3.11 GC5.9 GC5.10
KAD
RC5
43
329
202 201
Note 6
(63)
13
(64) (63)
KMC
43 44 14 13 43 44 2T1 1L1 ZQ1 ZQ2 13 14 Note 6
B 328 329 330 B
(64)
KMY KMC KAD KMB TB2.1 TB2.2 KMB
14
328
Note 2
44
Note 3
YBK YBK1
KMY
43
02 01
Note 6 UR3
202
Note 5
(64) (63)
43 44 14 13 43 44 2T1 1L1 ZQ1 YBK YBK1 ZQ2 13 14
Note 5:wiring is made when strong excitation
Note 4 328 329 330 is conducted with a band-type brake.
KMY KMC KAD KMB TB2.1 TB2.2 KMB
A Note 1: the corresponding line number's wires should be short connected without SW setting in a dotted line. A
Note 2: the electric circuit in the dotted line lies in a junction BX of the brake.
Note 3: the electric circuit in the dotted line is used only when the AC220v band-type brake sync main mach is introduced.
设 计 单 位 康力电梯股份有限公司
Note 4: the electric circuit in the dotted line is used only when DC198V band-type brake sync main mach 工 艺 标准化 VA01 图 名 safety, braking
or DC110V band-type brake sync main mach or DC110V band-type brake async main mach is introduced.
Notes 6:connections are made to the contacts in the backet when Changshu Fuji contactors are used. 校 对 审 定 图 号 D10D610
审 核 日 期 页 号 13/23
1 2 3 4
1 2 3 4
CTB5.1 CTB5.2 CTB5.9 CTB5.5 CTB5.3 CTB5.4 Branch cable CDB5 plug
door-opening speed-limiting
door-closing speed-limiting
door-opening in-place
door-closing in-place
D 201 202 PE Car top branch cable CDB5 L=3m D
XK1 XK2 XK3 XK4
Car top junction BX RVV(8*0.75+1*2.0) Door operator controller
V6 KM GM terminal
(1#) (2#) (3#) connector NO. Pin NO. DWG line NO. cable line NO.
SER NO.
terminal line NO. signal name
1 201 1 L 201
L N 4 3 7 6 8 1 2 controller PS
2 202 2 N 202
Door operator VF-SL 3 KM 3 1 KM opening
control signal
closing
4 GM 4 2 GM control signal
U V W C2 C3 A3 A2 control signal
CTB5 5 V6 5 8 V6 public end
closing
6 M6 6 A3 M6 limit output
opening
CMM M6 M7 7 M7 7 A2 M7 limit output
(4#) (6#) (5#) 8 CMM 8 C2、C3 CMM output public end
C C
CTB5.8 CTB5.6 CTB5.7
MDO 9 PE G PE PE earthing wire
to operation BX CZB panels
PE
201 202 PE
XK1 XK2 XK3 XK4 Car top branch cable CDB6 L=3m
V6 KM1 GM1 Car top junction BX RVV(8*0.75+1*2.0) door operator controller
(1#) (2#) (3#) terminal
connector NO. pin NO. DWG line NO. cable line NO. terminal line NO. signal name
SER NO.
B B
L N 4 3 7 6 8 1 2 1 201 1 L 201
controller PS
2 202 2 N 202
door operator VF-SL opening
3 KM1 3 1 KM1 control signal
closing
U V W C2 C3 A3 A2 4 GM1 4 2 GM1 control signal
control signal
CTB6 5 V6 5 8 V6 public end
closing
6 M8 6 A3 M8 limit output
CMM M8 M9 7 M9 7 A2 M9 opening
(4#) (6#) (5#) limit output
MDO CTB6.8 CTB6.6 CTB6.7 8 CMM 8 C2、C3 CMM output public end
A A
设 计 单 位 康力电梯股份有限公司
Note: the electric circuit in the dotted line is used in case of an opposite door.
工 艺 标准化 VA01 图 名 Door operator
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 14/23
1 2 3 4
1 2 3 4
CTB5.1
CTB5.2
CTB5.9
D car top branch cable CDB5 L=3m D
KM GM V6
car top junction BX RVV(8*0.75+1*2.0) door operator controller
(2#) (3#) (1#) connector NO. pin NO. DWG line NO. cable line NO.
terminal
terminal line NO. signal name
SER NO.
1 201 1 1 201 controller PS
220 N PE I1 I2 COM
2 202 2 2 202
door operator ECO opening
X4 X10 3 KM 3 4 KM control signal
O1 NC O2 NC closing
4 GM 4 5 GM control signal
control signal
CTB5 5 V6 5 11 V6 public end
closing
6 M6 6 19 M6
public end
door-closing
door-opening
in-place
limit output
in-place
opening
7 M7 7 13 M7 limit output
M
C MDO 8 CMM 8 12、18 CMM output public end
C
PE CMM M7 M6
coder (4#) (5#) (6#) 9 PE G 3 PE earthing wire
CTB5.8 CTB5.7 CTB5.6
CTB6.2
CTB6.9
B
I1 I2 COM 1 201 1 1 201 B
220 N PE controller PS
door operator ECO 2 202 2 2 202
X4 X10 3 KM1 3 4 KM1 opening
O1 NC O2 NC control signal
closing
4 GM1 4 5 GM1 control signal
control signal
CTB6 5 V6 5 11 V6
door-closing
in-place
public end
door-opening
closing
6 M8 6 19 M8
public end
in-place
limit output
opening
7 M9 7 13 M9 limit output
M
PE MD1 CMM M9 M8 8 CMM 8 12、18 CMM output public end
CTB6.8
CTB6.7
CTB6.6
Note: the electric circuit in the dotted line is used in case of an opposite door
设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 ECO door operator
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 15/23
1 2 3 4
1 2 3 4
LA
NKT12(1-1)A
NKT12(1-1)A
R R
Y
PHO-M1 L L
control cabinet
P+
main mach + +
D
N- PHO-M2 D
- -
811
SBB
YJ P4
7 4 3 - + L R - + L R - + L R EB1
501 1 RKP220/12 NKT12(1-1)-A NKT12(1-1)-A NKT12(1-1)B SBB1
C 502 2 EB2 Note: intercom sub-mach PHO-S is installed in an operation BX; C
KP-SG01
PHO-M1 1 1
control cabinet
P+
main mach S1 S1
N- PHO-M2
S2 S2
B B
HAA monitor room main mach
811
SBB
YJ P4
7 4 3 1 2 1 2 1 2 EB1
501 1 RKP220/12 KP-SG01 KP-SG01 NBT12(1-1)B SBB1
502 2 EB2
A YJDY PHO-T PHO-B PHO-S A
EMER PS car top accessory mach pit accessory mach car accessory mach 设 计 单 位 康力电梯股份有限公司
Five-party
工 艺 标准化 VA01 图 名 communication by phone
KP-SG01
NBT12(1-1)B
KP-SG01 PS car sub-set 1 sub-set 2 sub-set 3 sub-set 4
D RKP 220/12 S1 +12 L
D
1 2 1 2 1 2 1 2
L N S2 -12 N
control console PS 2
KP-SG02
B KP-SG01 B
NBT12(1-1)B
KP-SG01 PS car sub-set 1 sub-set 2 sub-set 3 sub-set 4
S1 +12 L
1 2 1 2 1 2 1 2
S2 -12 N
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 17/23
1 2 3 4
1 2 3 4
SSY2
Car governor test circuit SDY car governor actuating BUT control cabinet
SSY SDY SFW YDZ
L1 L2 L21 SFW car governor reset BUT control cabinet
+24V CMM
YDZ car governor actuating coil car governor
Notes: the circuit in the dotted line is used without mach brake-releasing device.
KDY SJK SKZ
X11 Z11 1 9 Z12 Z13 ZQ1
Notes 1: the circuit in the dotted line is used when the counterweight governor is increased.
TB2.3 Notes 2: connections are made to the contacts in the bracket when Changshu Fuji contacts are used.
UPS
A KDY SJK SKZ A
N Z21 2 10 Z22 Z23 ZQ2 设 计 单 位 康力电梯股份有限公司
TB2.4
Note 工 艺 标准化 VA01 图 名 EMER rescue
Power brake-releasing circuit
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 18/23
1 2 3 4
1 2 3 4
ON ON
TXA- JP2.4
SW1
1 2
KZB KLS-EXT SW1
1 2
KZB1 KLS-EXT1
J3.1 J3.2 J5.1 J5.2
JP1 JP3 J3.1 J3.2 J5.1 J5.2
D TXA+ JP2.3
OFF OFF D
PL1 PL2 PL3 PL4 CO PL5 UPB DNB DZZ CO MVB BST DOB EOB CO BAU JX CZ MZ CO
C C
PL5 PL4 PL3 PL2 PL1 CO UPB DNB MVB BST DOB EOB BAU JX CZ MZ
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Note
TB3
control cabinet terminal strip
Note:When selecting BAS function, the control cabinet needs to increaseTB3 terminal strips.
Note:When 2 connects with 1 for J3 and 2 connects with 1 for J5 are low level and effective;when 2 connects with3 for J3 and 2 connects with 3 for J5 are high level and effective.
A A
设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 BAS circuit
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 19/23
1 2 3 4
1 2 3 4
QTRONICS 2500
POWER
D D
ALARM TROUBLE
Latching Non-Latching Latching
Normal/Open Normal/Closed Normal/Open Normal/Closed Normal/Open Normal/Closed
356 COM
TB2.34
TB2.33
C
JP4.4 KLS-MCU JP4.6 +24v C
X35
Wiring is made according to this DWG when there is some seismic function.
X20 JP3.1
JP4 JP3
1 2 1 2
B B
SM-11-A KLS-MCU
1 2 3 4 5 1 2
JP1 JP2
MQU MQD
X18 JP2.9
GC3.19
GC3.20
GC2.2
Y8 JP7.7
DC3.19
DC3.20
DC2.2
SMU SMD
A A
Door-pre-opening and micro leveling panel 设 计 单 位 康力电梯股份有限公司
Door-pre-opening
工 艺 标准化 VA01 图 名 and relevel
weighting controller
DTZZⅢ-SK
D D
9 overload void 9
2 93 2 93 overload
C C
GC6.1
CMM 10 void 10
3 34 3 34 fullload
weighting
GC6.3
4 VF+ 4 VF+ compensating device
RH11
34 11
signal
12 full load
5 VF- 5 VF-
13
GC6 6 201 6 201
GC6.10
GC6.6 PS
36 14 201
7 202 7 202
15 light load
8 110 8 110
safety
16
9 1121 9 1121
10 36 10 36 light load
GC6.7
202
11 L21 11 L21 actuating coil
governor
12 L22 12 L22 reset coil testing
B 13 PE G ground wire B
sensor cable
CMM 93 34 VF+ VF- 201 202 110 1121 36 L21 L22 PE
pressure sensor
Notes: Pressure sensors are installed in the rope end plate on the side of a car.
Weighting controllers are installed near the pressure sensors, not more than 10m.
The input/output signal from a control cabinet is connected with the control cabinet via the hoistway cable RH11(RVV(12*0.75+1*2.0))
A A
Resistor R4 is installed in the control cabinet. 设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 SK type weighting circuit
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 21/23
1 2 3 4
1 2 3 4
up ultimate SLUL
SLUL
Note1:
down forced change1 SSD1
car
B B
SSD1 car
SSD
down limit SLDT
SLDT down ultimate SLDL lift speed SSU\SSD SSU1\SSD1 SLUT\SLDT SLUL\SLDL
SSDL 0.63m/s 900-1000
ground floor
1.0m/s 1300-1400 30-50 130
1.75m/s 2400-2500 3800-4200
A A
Notes:1、 When SW actuating. the hoistway SW installation position should be the distance from the car sill to top floor (or GND floor) landing door sill.
设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 Hoistway information
2、 The up door zone SW SMU and the down door zone SW SMD are used only when pre-opening or relevel functions are selected.
校 对 审 定 图 号 D10D610
Note1: it is used when speed exceeds 1.75m/s.
审 核 日 期 页 号 22/23
1 2 3 4
1 2 3 4
PS terminal Small terminal strip Trailing comm cable C00 Trailing comm cable C00
Call comm cable R03 Weighting & governor cable Hoistway cable R01
TB1 TB2 GC1 GC3 GC4 GC6 GC8
SER NO. line NO. position
SER NO. line NO. position SER NO. line NO. position SER NO. line NO. position SER NO. line NO. position SER NO. line NO. position SER NO. line NO. position
five-party comm
D D
2 TXV-
by phone
2 X12 19 111 up limit
2 TXV- 2 202 2 93 2 N-
3 X13 20 113 down limit
3 TXA+ 3 501 3 TXA+ 3 34 3 LA
4 N 21 78 INSP
4 TXA- 4 502 4 TXA- 4 VF+ 4 Y
5 PE 22 CF fire-control
5 PE 5 stand-by 5 PE 5 VF- 5
6 PE 23 CF1
fire-control
linkage socket:1-480764-0 6 stand-by socket:1-480764-0 6 201 6
7 U 24 P+ plug:1-480763-0 7 110 plug:1-480763-0 7 202 7
five-party comm
Note 2
8 V 25 N- by phone 8 A10 8 114 8
Trailing comm cable C00 Hoistway cable
9 W 26 LA 9 stand-by
9 1121 9
GC2 GC5
27 Y SER NO. line NO. position
10 135 SER NO. line NO. position
10 36 10
Small terminal strip 28 Z31 rescue lighting
11 116 11 L21 11
C 1 COM 1 501 C
TB2 29 VF+ weighting 12 120 12 L22 12
compensation 2 +24V 2 502
SER NO. line NO. position
30 VF- 13 KM1 13 PE socket:1-480709-0
3 PS 3 stand-by
1 ZQ1 band-type 31 LD1 fire-control
14 GM1 socket:172347-1 plug:1-480708-0
output 4 PX 4 stand-by
2 ZQ2 brake coil
32 LD2 15 KM plug:171358-1
5 80 5 133
3 Z11 33 +24V seismograph PS
16 GM
UPS 6 82 6 135
4 Z21 34 356 seismic INSP
17 V6
back-up 7 78 7 110
5 102 broken rope SW
35 355 PS INSP 18 PE
8 P+ 8 114
6 110 pit, car safety
36 stand-by 2
19 MQU(36) Note 3
governor, 9 N- 9 116
7 114 up ultimate 37 L0 20 MQD
counterweight 10 LA 10 118
8 1121 safety gear 38 L1 21 34
B
hoistway
11 Y 11 84 B
9 112 governor
39 L lighting
car buffer, 12 CMM socket:171830-1 12 86
10 135 safety gear 40 N
13 93 plug:171364-1 13 88
11 116 door lock
41 201
14 90 Note 1: Note1:It is used when speed exceeds 1.75m/s or above.
12 118 door lock
42 202
socket:172347-1 15 111
13 120 door lock
43 stand-by 3
plug:171358-1 16 113
14 stand-by 1
44 501
17 CF
15 COM common line
45 502
18
16 COM common line
46 PE
band-type 19 COM
17 352 brake INSP 47 PE socket:171830-1
20 PE
plug:171364-1
21
A A
Note 2: when it has group supervision functions,line NO.s on GC4 insert can respectively be changed into CANV1+、CANV1-、CANA1+、CANA1-、PE.
设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 connectors arrangement
Note 3: This point is used as light load without pre-opening doors.
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 23/23
1 2 3 4
1 2 3 4
D D
control cabinet
C C
L1
R00
N1
wiring terminals
car top wiring BX
B B
Note:When air conditioner is used, two large terminals will be added to a control cabinet,directly providing AC 220V PS.One trailing round cable RVV(4*1.5) will be added and one three-hole socket AC30-3x16A will be added to the wiring BX of a car top.
A A
设 计 单 位 康力电梯股份有限公司
Selecting air
工 艺 标准化 VA01 图 名 conditioning function
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 attachment 3
1 2 3 4
1 2 3 4
D D
SARD-CHARGE SARD-INVERTER
(3*AC380V)
PTB1
PTC3
1 2 3 4 5 U V W BZ1 JX1 PC1 PC2 NC
KM K1 NO
2 1 5 6
H L D S D S
JXSR1
JXXR1
JXR1/1
K1
21 22 4 3 13 14 BZSZ1 PCSZ1 PCSZ2
C R
6 5 43 44
PC1+
PC1-
PC2+
PC2-
JXS1
JXS2
JXX1
JXX2
BZ+
BZ-
JX+
JX-
JX1
JX2
KM
A1 A2
C L1 L2 L3 R S T PTA1 1 2 3 4 5 6 7 8 PTA2 1 2 3 4 5 6 C
Note 1 +24V
COM
B B
KLS-MCU
A A
设 计 单 位 康力电梯股份有限公司
工 艺 标准化 VA01 图 名 Dingli EMER rescue device
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 attachment 4
1 2 3 4
1 2 3 4
D D
controller interface
DTIC
IC card controller
1 2 3 4 5 6 7 8
24V+ GND JDQ-1 JDQ-2 XF-1 XF-2
C C
SBC(n)
nth floor comm.BUT
TB4.19
TB4.20
T24 CMM
B B
4 3 2 1
JP(n)
KLS-ICU Note 1
Note 1: The circuit in the dotted line is used only when a single floor is controlled. Floor selective controllers are added to it when more than two floors are controlled.
For floor selective controller wiring see its wiring diagram. wiring is made when IC card functions are selected
A A
设 计 单 位 康力电梯股份有限公司
IC card control
工 艺 标准化 VA01 图 名 system diagram
校 对 审 定 图 号 D10D610
审 核 日 期 页 号 attachment 2
1 2 3 4
1 2 3 4
KLS-ICU J10
D D
JP1 JP2 JP3 JP4 JP5 JP6 JP7 JP8
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
SBC1
SBC2 SBC3 SBC4 SBC5 SBC6 SBC7 SBC8
C C
1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3
3 2 1 3 2 1 3 2 1 3 2 1 3 2 1 3 2 1 3 2 1 3 2 1
B B
HC16 HC15 HC14 HC13 HC12 HC11 HC10 HC9
4 3 2 1 4 3 2 1 4 3 2 1 4 3 2 1 4 3 2 1 4 3 2 1 4 3 2 1 4 3 2 1
JE8 JE7 JE6 JE5 JE4 JE3 JE2 JE1
J9
KLS-ICU
A A
Note :Control ends for selector controllers will be wired in turn according to actual stops sequence,without void ends in the middle and control on the ground floor. 设 计 单 位 康力电梯股份有限公司
Note 1: If a single lift only controls single floors,the selector controllers will be removed. 工 艺 标准化 VA01 图 名 IC card selector wiring
Note 2: XF-1 and XF-2 of DTIC controllers will be short wired. 校 对 审 定 图 号 D10D610
审 核 日 期 页 号 attachment 1
1 2 3 4