Full Reservoir Level FRL = 146.3 m Reservoir Maximum Fetch Fmax = 11 km Reservoir Effective Fetch Fe = 5.1 km Maximum wind Velocity over Land UL 140 km/h 93.3333 Wind Ratio, (Table-A-1.5) Wr 1.27 1.27 Wind Velocity over Water, UW=Wr*UL UW 177.8 km/h 118.533 Significant wave Height, (From Fig 5) Hs 2.8 m 2.8 Design wave Height, (From Table A-1.7) H 3.6 m 3.6 Wind Set up=V2Fmax/(62000D) HWS 0.3 m 0.1 Computed Free Bard=4/3(H)+HWS FBcomp 5.1 m 4.9 Similar computation should be done with reference to MWL for 2/3 wind velocity. Minimum Free board to be Provided above MWL 1m Top of Dam=max of (FRL+Fbcomp), (MWL+FBcompMWL),MWL+1) 151.4 Calculation of Effective Fetch α0 Cosα x1 in km x1Cosα 42 0.743 Aa 3 2.23 36 0.809 Ab 4.85 3.92 30 0.866 Ac 3.65 3.16 24 0.914 Ad 4.8 4.39 18 0.951 Ae 5.5 5.23 12 0.978 Af 5.9 5.77 6 0.995 Ag 6 5.97 0 1.000 AB 4.5 4.50 6 0.995 Ag' 4.7 4.67 12 0.978 Af' 5.3 5.18 18 0.951 Ae' 4.2 3.99 24 0.914 Ad' 5.25 4.80 30 0.866 Ac' 6.2 5.37 36 0.809 Ab' 6.55 5.30 42 0.743 Aa' 5.1 3.79 13.511 68.28 i) Effective Fetch=sum(x1Cosα)/sum(Cosα) 5.1 km ii) Maximum Fetch CD 11 km
Computation of Fetch of Water Along Fetch Line C-D
S. No. FRL in m GL in m Depth in m 1 146.3 146.3 0 2 146.3 140 6.3 3 146.3 135 11.3 4 146.3 130 16.3 5 146.3 125 21.3 6 146.3 120 26.3 7 146.3 115 31.3 8 146.3 112 34.3 Total 147.1 Average depth=Total/8 18.3875 m Master Copy Reference- IS6512-1984, Appendix A Full Reservoir Level FRL = 424.8 m Reservoir Maximum Fetch Fmax = 2.95 km From Drawing Reservoir Effective Fetch Fe = 0.8 km From Drawing Maximum wind Velocity over Land UL 158.4 km/h Wind Ratio, (Table-A-1.5) Wr 1.1 Wind Velocity over Water, UW=Wr*UL UW 174.24 km/h Significant wave Height, (From Fig 5) Hs 1.028 m Design wave Height, (From Table A-1.7) H 1.4 m Wind Set up=V2Fmax/(62000D) HWS 0.000 m Computed Free Bard=4/3(H)+HWS FBcomp 1.87 m Similar computation should be done with reference to MWL for 2/3 wind velocity. Minimum Free board to be Provided above MWL 1m Top of Dam=max of (FRL+Fbcomp), (MWL+FBcompMWL),MWL+1) 426.67 m Calculation of Effective Fetch α0 Cosα x1 in m x1Cosα 42 0.743 Aa 268.03 199.19 1. Computation of free board - FRL Condition Depth of water (D) = 36 0.809 Ab 296.08 239.53 Step 1 FRL 30 0.866 Ac 324.9 281.37 Step 2 Reservoir maximum fetch 24 0.914 Ad 354.27 323.64 Step 3 Reservoir effective fetch Step 4 maximum wind velocity over land 18 0.951 Ae 388.24 369.24 Step 5 Wind velocity overwater=158.40X1.1 12 0.978 Af 1350.54 1321.03 Step 6 Significant Wave height ( Hs ) Step 7 Design Wave height (H)= 1.27 X Hs 6 0.995 Ag 1646.74 1637.72 Step 8 Wind set up = V 2 F/62000D 0 1.000 AB 2945.64 2945.64 Step 9 Computed free board = 1.33 X H + wind setu Step 10 Top of the dam 6 0.995 Ag' 736.13 732.10 Prov 12 0.978 Af' 666.79 652.22 18 0.951 Ae' 628.04 597.30 24 0.914 Ad' 571.42 522.02 30 0.866 Ac' 456.37 395.23 36 0.809 Ab' 398.7 322.56 42 0.743 Aa' 119.1 88.51 13.511 10627.28 i) Effective Fetch=sum(x1Cosα)/sum(Cosα) 0.79 km ii) Maximum Fetch CD 2.95 km
Computation of Fetch of Water Along Fetch Line C-D
S. No. FRL in m GL in m Depth in m 1 424.8 294.5 130.3 2 424.8 360 64.8 3 424.8 390 34.8 4 424.8 340 84.8 5 424.8 295.5 129.3 6 424.8 296.5 128.3 7 424.8 390 34.8 8 424.8 340 84.8 9 424.8 330 94.8 Total 786.7 Average depth=Total/9 87.4111 m From Drawing From Drawing
ree board - FRL Condition
er (D) = 87.41 m 424.80 m aximum fetch 2.95 km fective fetch 0.79 km ind velocity over land 158.40 km p h y overwater=158.40X1.1 174.21 km p h Wave height ( Hs ) 1.084 m e height (H)= 1.27 X Hs 1.38 m = V 2 F/62000D 0.0165 ee board = 1.33 X H + wind setup 1.86 m am 426.66 m Provided - 426 .80 m