Ra 4.11 6.22
1 KPI 2020 KINERJA KEUANGAN & PASAR
Ri 3.31 3.91
HM Ra
a Shared Service Cost terhadap Proker BRPT
Ri
HM Ra 4.11 6.22
b Actual Cost Vs Budget BRPT
Ri 3.31 3.91
Ra 8.33 8.33
2 KPI 2020 KINERJA FOKUS PELANGGAN
Ri 8.33 8.33
HM Ra 8.33 8.33
a Customer Satisfaction Index BRPT
Ri 8.33 8.33
Ra 5.65 6.75
3 KPI 2020 KENERJA PRODUK & PROSES
Ri 3.86 5.71
HM Ra
a Inovasi nasional/global BRPT
Ri
HM Ra
b Capaian karya inovasi yang berkualitas BRPT
Ri
HM Ra 3.88 4.38
c Penyelesaian Proker Strategis BRPT
Ri 2.53 3.78
HM Ra 0.75 0.75
c.1 Advisory/Engineering Consultancy BRPT
Ri 0.75 1.05
YA Ra
c.1.1 Implementasi pemakaian QR-Code BRPT
YR Ri 0.75
Konsep QR Code 0.30
Pengumpulan Data 0.15
Site Visit 0.15
Trial & Pengembangan 0.15
Kajian Teknis Converter Hydrocarbon to Syngas YA Ra
c.1.2 BRPT
(sebagai bahan bakar PLTMG) HZ Ri 0.45
Study Referensi 0.30
Pengumpulan Data 0.15
Site Visit 0.00
Kajian Teknis
Kajian Bisnis
YA Ra
c.1.3 Kajian Various Application of Bitumen BRPT
HZ Ri 0.60
Studi Referensi 0.30
Pengumpulan Data 0.30
Ra 1.63 2.13
c.2 Research & Innovation
Ri 0.28 1.23
HZ Ra 0.25 0.25
c.2.1 Falling Ball & Radio Isotope BRPT
AG Ri 0.00 0.15
Kalibrasi Alat 0.00 0.15
HM Ra 1.50 1.50
c.3 Centralize Engineering BRPT
ZH Ri 1.50 1.50
Sharing Benchmark IKPT 0.75 0.75
Organization Structure 0.75 0.75
Business Process + RASCI 0.00 0.00
Bahasa
Time Komunikasi
Sheet 0.00 0.00
0.00 0.00
Career Path & Salary 0.00 0.00
HM Ra 1.78 2.38
d Knowledge Management Maturity BRPT
FH Ri 1.34 1.94
HM Ra 0.42 0.42
d.1 KM sharing & Pengembangan Sistem KM BRPT
FH Ri 0.42 0.42
KM sharing 0.12 0.12
Pengembangan KM WEB 0.10 0.10
Pengembangan KM Apps (iOS dan Android) 0.10 0.10
Pemutakhiran Data KM WEB dan Apps 0.10 0.10
HM Ra 0.68 0.68
d.2 Sosialisasi sistem baru KM BRPT
FH Ri 0.24 0.24
Sosialisasi KM untuk PPCP 0.24 0.24
Sosialisasi KM via Management Review
Sosialisasi KM via Departemen Operasi
HM Ra 0.60
d.3 LPS Sharing BRPT
FH Ri 0.60
LPS Sharing Proyek Tahap I 0.60
LPS Sharing Proyek Tahap II
LPS Sharing Proyek Tahap III
HM Ra 0.68 0.68
d.4 Lomba Karya Inovasi 2020 BRPT
FH Ri 0.68 0.68
Innovation Award HUT WIKA 60 0.36 0.36
QCC Competition 0.32 0.32
Best Lesson Learned Competition
HM Ra
d.5 Community of Practices BRPT
FH Ri
Pembentukan SME WIKA
Forum Sharing
Engineering Project
Review progress
Article oleh 0-10%
SME
HM Ra
d.6 Benchmark KM BRPT
FH Ri
Mencari Best practices KM lintas industri
Melakukan Benchmark dan Improvement atas
KM system WIKA
Engineering Review Article oleh SME
HM Ra
d.7 Forum Engineering 2020 BRPT
FH Ri
Penentuan Tema
Persiapan Forum
Pelaksanaan Forum
HM Ra
d.8 Pembuatan Buku WIKA BRPT
FH Ri
Pembuatan buku DPPU bekerja sama dengan
Pertamina Aviation
Peremajaan buku Beton, Pembesian dan Project
Management
HM Ra
d.9 Pendaftaran Hak Paten BRPT
FH Ri
HM Ra
d.10 Standard Code dan SNI untuk Engineering BRPT
FH Ri
Ra 8.33 8.33
4 KPI 2020 KINERJA FOKUS TENAGA KERJA
Ri 8.33 8.33
HM Ra 8.33 8.33
a Jumlah CMC BRPT
Ri 8.33 8.33
Ra 8.33 8.33
5 KPI 2020 KINERJA KEPEMIMPINAN & TATA KELOLA
Ri 8.33 8.33
HM Ra
a Temuan Audit BRPT
Ri
HM Ra 8.33 8.33
b Risk Register BRPT
Ri 8.33 8.33
100.00 100.00
94.43
88.37
80.00 78.94
69.22
Progres
60.00 58.83
49.51
40.00 39.84
31.77
20.00 21.47
12.40
9.57
5.65
3.86
- - - - - - - - - - -
Jan Feb Mar Apr Mei Jun Jul Agu Sept Okt Nov Des
Bulan
Ra Kom Ri Kom
Breakdown Program Tahun 2020 - BRPT
Timeline Bulanan
Bobot
Mar Apr Mei Jun Jul Agu Sept Okt Nov Des
7.11 7.41 9.67 8.45 8.47 42.33 43.20 43.60 10.76 8.67 200.00
7.11 7.41 9.67 8.45 8.47 9.00 9.87 10.26 10.76 8.67 100.00
8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 100.00
8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 100.00
9.07 10.30 8.07 9.67 9.32 10.40 59.71 59.43 56.07 55.57 300.00
7.00 6.88 4.88 6.25 6.50 6.50 5.38 5.38 4.75 3.25 65.00
1.50 1.50 0.75 1.50 1.50 1.50 1.50 1.50 1.50 0.75 15.00
4.00 3.88 2.63 3.25 3.50 3.50 3.13 3.13 2.50 1.75 35.00
0.50 0.50 0.25 0.50 0.50 0.50 0.50 0.50 0.50 0.25 5.00
0.50 0.25 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.25 5.00
1.13 1.13 0.38 0.38 0.75 0.75 0.75 0.75 0.38 0.38 7.50
0.75 0.75 0.25 0.25 0.50 0.50 0.50 0.50 0.25 0.25 5.00
0.75 0.75 0.75 1.13 0.75 0.75 0.38 0.38 0.38 0.38 7.50
0.38 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.25 5.00
1.50 1.50 1.50 1.50 1.50 1.50 0.75 0.75 0.75 0.75 15.00
2.07 3.43 3.20 3.42 2.82 3.90 4.34 4.06 1.32 2.32 35.00
0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 5.00
0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 4.00
8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 100.00
8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 100.00
8.33 8.33 8.33 8.33 8.33 8.33 33.33 33.33 33.33 33.33 200.00
8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 100.00
100.00
9.07 10.30 8.07 9.67 9.32 10.40 9.71 9.43 6.07 5.57 100.00
21.47 31.77 39.84 49.51 58.83 69.22 78.94 88.37 94.43 100.00
- - - - - - - - - - 9.57
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
100.00
94.43
7
- -
ov Des
Biaya Keterangan
KPI - Actual Cost vs Budget
HASIL PERHITUNGAN
Bulan KPI
Jan Actual Cost Vs Budget terhadap Biyus
(linked)
KERTAS KERJA
Laba Bersih = Laba Setelah Pajak
Sat RA RI
% 90% 81%
(linked) (linked)
Realisasi Progress
83,097,155 81% 3%
98,245,362 63% 4% 181,342,517
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%