You are on page 1of 4

SARAWAK SHELL BERHAD/ SABAH SHELL PETROLEUM COMPANY

LIMITED
Work Method Statement
To be attached to the PTW Form
Work Location: PTW No: Date:

Name of the Accountable Worksite Supervisor (AWS):


Company/Position:
Signature:

I accept the single person accountability to supervise and ensure safe execution of
this/these job tasks.
Work Title:

Brief description of work:

List of Personnel and Positions involved in work:

List of Equipment / Hand Tools / Spare Parts required for the work:

Page 1 of 4
SARAWAK SHELL BERHAD/ SABAH SHELL PETROLEUM COMPANY
LIMITED
Work Method Statement
To be attached to the PTW Form

Sequence of Job Steps (List down step-by-step instructions on how to carry out
the job):

No. Sequence of Job Steps

Page 2 of 4
SARAWAK SHELL BERHAD/ SABAH SHELL PETROLEUM COMPANY
LIMITED
Work Method Statement
To be attached to the PTW Form

Page 3 of 4
SARAWAK SHELL BERHAD/ SABAH SHELL PETROLEUM COMPANY
LIMITED
Work Method Statement
To be attached to the PTW Form
Attachments (photographs, sketches, flow charts etc.)

Page 4 of 4

You might also like