EARTHING CONDUCTOR

Checklist 18002-INT-FQE-CL-ECI-001-0
Sub contractor: Location
Date
Status
Sl.No Description Remarks
Yes No
Ensure earthing conductor laid as per the approved earthing
1
layout drawing.
Ensure proper exothermic weld done as per the approved
2
method statement.
3 Ensure that welded joints are applied with bitumen paint.
Weather proofing membrane done after applying bituminous
4
paint.
5 Proper backfilling done after laying of earth mat.
6 Earth pits installed as per the approved earthing drawing.
Ensure that the earthing links are properly connected and
7
tightened
Check the completion of masonry work and fixing of cover on pit
8
and identification
Check for Tightness of all connection & proper provision for test
9
links
10 Ensure that the connected grid value is as per Specification
Remarks

Sub con/ EPC Sub


con/EPC Quality EPC Client